"Manufacturing plan : Saturn V : booster stage S-IC. Volume 1."
This procedure provides the necessary information for the fabrication and assembly of the Saturn C-5 booster stage S-IC. The manufacturing methods outlined herein represent techniques that will be utilized both at Michoud and MSFC wherever possible. The concepts and methods outlined are of a preliminary nature consistent with the stage of design at this time. These concepts and methods are subject to change. This Manufacturing Plan will be periodically updated to reflect such changes. The processes and techniques proposed in this Manufacturing Plan are generally within the present state of the art, consistent with reliability requirements for manned space flight and advocated for use with the limited manufacturing facilities of the Marshall Space Flight Center and the Michoud Production Facility.; Includes memorandum dated 15 Jan. 1963 from J. H. Chesteen, Chief, Engineering Planning Section. M-ME-SE.; Includes memorandum from J. H. Chesteen and N. E. Johansen to W. B. Edmiston and W. R. Kuers--subject: Integration Boeing-MSFC Manufacturing plan. December 18, 1962. -
"Manufacturing plan : Saturn V : booster stage S-IC. Volume 2."
Manufacturing plan for Saturn V Booster stage S-IC -
"Saturn S-II : annual progress report : 1 July 1962 through 30 June 1963."
This document, prepared in compliance with NASA contract NAS7-200, is the first annual progress report on the Saturn S-11 Program at the Space and Information Systems Division of North American Aviation, Inc. It provides a summary- and a technical analysis of results of contract work for the period 1 July 1962 through 30 June 1963.; SID 63-1028-1 251 pages. Include illustrations. -
Saturn V management information : August 1964 : Volume VI.
This document contains copies of management charts maintained in the Managerial Data Center of the executive Staff on the Saturn V project. To facilitate use of this document, all Saturn V classified data has been removed and will be published in Volume XI. A list of these charts are shown on the "Table of Contents". Information on other MSFC activities will be published in separate volumes as indicated on the "Schedule for Publication of Data Bank Charts" contained in this volume. -
"Saturn system study II."
Study regarding the three-stage carrier vehicle E-1 engines. -
"Meeting with the Director, Development Operations Division, ABMA, Huntsville : Memorandum for the Associate Administrator."
The following people participated in an all day meeting at ABMA Huntsville on 6 January 1960: Dr. W. Von Braun, Mr. E. Rees, Mr. A. Hyatt, Mr. A. Siepert. Writer of the memorandum is Abraham Hyatt, Deputy Director, Launch Vehicle Programs. -
"MSFC Manned Space Flight Program status for presentation to the Management Council, March 26, 1963."
This is material prepared in support of Dr. Von Braun's presentation for the March 26, 1963, Management Council Meeting - Agenda Item 3, "MSFC Status Report". Presentation material consists of slides, a film report and narrative backup-information to support the presentation. -
"MSFC Manned Space Flight Program status for December 18, 1962 Management Council meeting."
This is material prepared in support of Dr. von Braun's presentation for the December 18, 1962, Management Council Meeting - Agenda Item 2, "MSFC Status Report." -
"MSFC Manned Space Flight Program status for presentation to the Management Council."
This is material prepared in support of Dr. von Braun's presentation for the August 27, 1963, Management Council Meeting - Agenda Item 2, "MSFC Status Report."; Original is photocopy.; M-CP-P(R40).; TMXS 7544.; Includes references to film and slides.; Contents include: 1. SA-5 Status; 2. SA-5 voice orbital transmitter; 3. Integration effort. -
"Manned Space Flight Program status for presentation to the Management Council."
This is material prepared in support of Dr. von Braun's presentation for the January 29, 1963, Management Council Meeting - Agenda Item 1, " MSFC Status Report". Presentation material consists of slides , a film report and narrative back-up information to support the presentation.