UAH Archives, Special Collections, and Digital Initiatives

Browse Items (51 total)

  • spc_stnv_000059.pdf

    This paper was presented to the Society of Automotive Engineers. The abstract reads, "The Douglas Aircraft Company has been involved in testing the Saturn SIV stage at the Sacramento Test Center for the past two years. The propulsion system for the SIV stage consists of six (6) Pratt & Whitney Aircraft Company rocket engines which are designed specifically for high altitude start and operation. During static firing tests of this engine at sea level, a steam jet ejector in combination with a diffuser, are used to simulate altitude conditions. The intent of this paper is to examine the performance of this altitude simulation system, and to discuss problems encountered in making it operational."
  • counlift_080607123539.pdf

    This is an article from the Boeing Magazine. The Archive copy is a very poor photocopy and is difficult to read.; About the time the S-IC-1 booster is lifting the first Apollo/Saturn V from the launch pad on its maiden unmanned flight next year, a Boeing systems test crew will begin static testing the S-IC-4 at Devils Swamp, Mississippi (MTF). Starting with S-IC-4, all Saturn V first stage boosters will be captive fired at MTF. At present, S-IC firings are conducted by MSFC's test laboratory at Huntsville. The first flight stage, the S-IC-1, was placed in the static test stand on 24 January 1966 and completed its test program 25 Feb. It was removed from the stand March 14 and is undergoing post-firing checkout. it is due to be shipped this summer to KSC where it will be mated to the two upper stages of Saturn V, the IU and Dummy Apollo payload. The S-IC-2 went into the static stand on March 22 and is being tested during April The S-IC-3 also will be tested at Huntsville in 1966. The job of putting the world's largest and most powerful rocket together will be accomplished in the world's largest building, the 52-story vehicle assembly building.
  • presrelsacrcaloct4_041207114716.pdf

    Press release covering the static firing of the S-IV rocket for a full seven minutes.
  • drafscrpno25_082807120508.pdf
  • uprsatIBquafilrepandrelmatfilsciforsatquafilrepno15_071007103723.pdf

    Unclassified film script of the Saturn I/IB Quarterly Film Report covering January, February, March, 1963. There are handwritten notes and edits throughout the document.
  • uprsatIBquafilrepandrelmatfilsciforsatquafilrepno16_071007104133.pdf

    Unclassified film script of the Saturn I/IB Quarterly Film Report covering April, May, June, 1963. There are handwritten notes and edits throughout the document.
  • filsciforsatIIBquafilrepnr22covoctnovdec1964_083107102443.pdf

    Film script for the Saturn Quarterly Film Report - October through December, 1964.
  • filsciforsatIIBquafilrepnr23covjanfebmar1965_082907142544.pdf

    Film script for the Saturn Quarterly Film Report - January through March, 1965.
  • uprsatIBquafilrepandrelmatfilsciforsatquafilrepno18_071007104903.pdf

    Unclassified film script of the Saturn I/IB Quarterly Film Report covering October, November, December, 1963. A handwritten note at the top of the title page lables this copy as the "Final Draft".
  • filscrforsatquafilrepno19janfebmar1964_090707084318.pdf

    Film script for the Saturn Quarterly Film Report - January through March, 1964.
Output Formats

atom, csv, dc-rdf, dcmes-xml, json, omeka-xml, rss2