UAH Archives, Special Collections, and Digital Initiatives

Browse Items (29 total)

  • Nexuconc.pdf

    Aspects of Earth-to-orbit delivery are discussed and a cost analysis of the logistic operation and the cost of orbital operations are presented. Probabilities of success of orbital delivery and the operational and economic aspects of establishing large orbital installations and maintaining a large transportation volume in the 1975/85 time period are compared for the two cases using a large number of Saturn V versus a smaller number of 1-stage chemical Post-Saturn launch vehicles. Performance parameters of chemical, chemonuclear and nuclear launch vehicles are compared. The concept of a blunt launch vehicle configuration referred to as NEXUS is presented in detail. Applications of this configuration to chemonuclear propulsion and to a 50 ft diameter version of Saturn V with recoverable first stage are discussed.
  • RepototheCong1965.pdf

    A report to Congress from White House regarding the accomplishments of NASA.
  • digoffy66funadvstunov1966_121407110639.pdf

    This publication is one of a planned series to summarize the advanced study program for each fiscal year beginning with FY-61.A separate report will cover the study program for each fiscal year. The purpose of these documents is to provide reference information which should be helpful in planning future study programs. The FY-65 funded studies are covered in this document. These investigations are covered under four major headings: Launch Vehicle Studies, Earth Orbital and Lunar Studies, Planetary/Nuclear Studies, and AAP Studies. The information presented on each studyincludes a brief description of the objectives and pertinent contract data.
  • digoffy65funadvstujul1966_090707104031.pdf

    This publication is one of a planned series to summarize the advanced study program for each fiscal year beginning with FY-61.A separate report will cover the study program for each fiscal year. The purpose of these documents is to provide reference information which should be helpful in planning future study programs. The FY-65 funded studies are covered in this document. These investigations are covered under four major headings: Launch Vehicle Studies, Earth Orbital and Lunar Studies, Planetary/Nuclear Studies, and AAP Studies. The information presented on each studyincludes a brief description of the objectives and pertinent contract data.
  • DigeofFY-64fundadvastudaugu1966_110707112556.pdf

    This paper outlines the major advantages of digital transducers and describes the principles and features (1) direct digital transducers, (2) indirect digital transducers, (3) quasi-digital transducers, and (4) A to D transducers. The mutual effect of transducers and systems will be discussed briefly, and some trends of transducer research and development will be presented.
  • Grourwuitosup_041309110136.pdf.pdf

    With the advent of the first large space vehicle, the SATURN, the ground support equipment and launch facility designer is faced with the necessity of conceiving and building an unprecedented launch system concurrent with the vehicle development. The paper intends to present a comprehensive picture of the problems involved and how they are solved. It follows the SATURN through the various modes of operation such as transportation over land and water, checkout, handling and erection, propellant loading, and describes the facilities at the launch site.
  • launvehirecosystrequ_061407154402.pdf

    The primary considerations in the design and development of a recovery system applicable to present expendable first stage launch vehicles are discussed. The general requirements that define the essential characteristics of a feasible recovery system are derived from three critical phases during flight. The degree of criticalness is primarily influenced by the conditions at stage cutoff and separation. The three critical phses of flight are broken down into the following: (1) conditions and requirements between stage separation to re-entry; (2) re-entry; and (3) terminal descent and landing.
  • LaunComp37Faci_062508141423.pdf

    Article detailing the different aspects of the Launch Complex 34 facilities.
  • LaunComp34Faci_062508095836.pdf

    Article detailing the different aspects of the Launch Complex 34 facilities.
  • kscaposatVmastespla_110207091724.pdf

    The John F. Kennedy Space Center (KSC) Apollo/Saturn V Development/Operations Plan, K-PM-0, establislies the requirement for an Apollo/Saturn V Master Test Plan (MBP). This document, prepared by the Saturn Systems Office.
Output Formats

atom, csv, dc-rdf, dcmes-xml, json, omeka-xml, rss2