Browse Items (175 total)
Sort by:
-
"List of Equipment, Components, Materials, and/or Services Now Being Developed, Fabricated or Performed."
Lists of different parts of rockets. -
"Saturn stages S-II : July 7, 1961 : Minutes of the phase II pre-proposal conference for stage S-II procurement."
Transcription of a confrence aiming to propose ideas for new rocket designs. Includes references to slides. -
"Saturn SA-1 flight and its instrumentation."
Presentation focusing on empahsising the importance of space programs such as Saturn. -
"Saturn V inboard profile : Launch escape system flight separation."
Diagram displaying the launch escape system flight separation in progress. -
"Saturn IB orientation training manuel."
Prepared through joint efforts of Personnel Department, Education and Development Branch, Systems Training Unit, Michoud Operations and Engineering Communications Department, Technical Information Branch, Applied Communications Engineering Section, Huntsville Operations.; This publication presents a brief descriptive summary of the Saturn IB vehicle and Chrysler's Corporation's accomplishments in the missiles and space field. The Saturn IB information presented herein is based on current plans for each of the stages. Although there may be design changes from vehicle to vehicle, the basic components, systems, and operating principles will remain similar to previous models. -
Draft of "Concepts of the Iterative Guidance Law for Saturn Launch Vehicles."
The summary notes, "In 1960, research work was begun to develop new guidance concepts for the Saturn space vehicles. [...] This paper presents the basics of the Iterative Guidance Law developed for Saturn launch vehicles to meet these new requirements of space age guidance. The development of the Iterative Guidance Law and the results and ideas presented in this paper are due primarily to Mr. Helmut J. Horn and his associates in the Dynamics Analysis and Flight Mechanics Division of the Aero-Astrodynamics Laboratory." Marked "Research Review, OK" in the upper right corner of the first page. The document includes corrections and additions to the text in red pencil. -
"Automatic Saturn V Page Test System."
The abstract notes, "This paper describes the Automatic Saturn V Page Test System. The system is used to evaluate microminiature Unit Logic Device (ULD) circuits. A page is an assembly consisting of a magnesium- lithium frame, an input-output connector, test points, and multilateral printed circuit boards that interconnect the IUDs into logic circuits. The test system automatically performs tests for shorted voltages and shorted diodes, static logic function, and pulse function." -
Final Apollo 11 Lunar Surface Operations Plan.
Prepared by the Lunar Surface Operations Office, Mission Operations Branch, Flight Crew Support Division. -
"A Prime Contractor's Reliability Program for Components/Parts for the Douglas S-IVB Stage Project."
This paper, presented at the fifth annual Reliability and Maintainability Conference in New York City, contains a "prime contractor's reliability program for components/parts for the Douglas S-IVB stage project." These parts include special flight critical items and their complementary reliability engineering program plan is outlined in this paper. -
"Development of Separable Connectors for the Saturn S-IV Stage."
The purpose of this paper is to present information, in the area of separable connectors as they pertain to the Saturn S-IV Program. -
"Saturn IB/V instrument unit."
This brochure provides some basic, general information about the lnstrument Unit, a very important part of the Saturn IB and Saturn V launch vehicles. These launch vehicles are being developed primarily for the Apollo program for manned lunar exploration but will also be used for future space missions. -
"Development Status for Arc Guidance, Weld Observation Systems, and a Review of Process Control Parameters."
Letter to David L. Christiensen from W. A. Wall, enclosing requested documents. -
"Ground Equipment to Support the Saturn Vehicle."
With the advent of the first large space vehicle, the SATURN, the ground support equipment and launch facility designer is faced with the necessity of conceiving and building an unprecedented launch system concurrent with the vehicle development. The paper intends to present a comprehensive picture of the problems involved and how they are solved. It follows the SATURN through the various modes of operation such as transportation over land and water, checkout, handling and erection, propellant loading, and describes the facilities at the launch site. -
"Management of the Space Program at a Field Center."
Transcription of a presentation from Wernher von Braun discussing the roles of the space vehicles in the Apollo project. -
"A 'Zero Stage' for the Saturn IB Launch Vehicle."
To meet the demands of increasing payload size and weight, and to fill the large payload gap between the Saturn IB and Saturn V, a number of methods of uprating the Saturn IB have been studied by NASA and Chrysler Corp. of providing increased payload capability is discussed in this paper. Four 120 in. United Technology Center UA-1205 solid propellant motors, originally developed for the Air Force Titan III program, are clustered around the S-IB first stage of the Saturn IB launch vehicle. These four solid propellant motors provide the total thrust for liftoff of the vehicle, with S-IB stage ignition occurring just prior to burn-out and separation of the solid propellant motors. The term "Zero Stage" is applied to this added stage. -
Saturn V history team at the Apollo 10 launch.
Shown left to right: David Christensen, Melvin Kranzberg, Irving B. Holley, Jr., Rudolf Hermann, and Fred Ordway. -
"Manned space flight schedules. Vol. III, launch vehicles : book 2, Saturn IB."
OMSF Program Status Review August 1965.; Edition "A" -
Apollo 5 press kit.
For release Thursday P.M., January 11, 1968. -
"SL-III MC-1/1 Time: 05:01 CDT 09:10 GMT 7/28/73" - "SL-III MC-10/4 Time:06:08 CDT 09:11:08 GMT 7/8/73."
This mission commentary describes the Skylab 3 launch. -
"SL II MC 1/1 Time: 6:32 a.m. CDT, T-01:25:00 GET 5/25/73" - "SL-II MC-11/3 Time: 08:01 A.M. CDT, T-1 minute Get 5/25/73."
This mission commentary depicts the Skylab 1 launch. -
"SKYLAB WORKING ON A NEW FRONTIER."
This article describes the technical aspects of all of the Skylab missions, with a focus on readability for the public. -
"skylab 3 SCIENCE & ENGINEERING IN ORBIT" brochure.
This brochure describes the duties and responsibilities of the Skylab 3 crew, including experiments and repairs. -
"APOLLO APPLICATION PROGRAM VEHICLES."
This image depicts various Apollo launch vehicles. -
"Manned space flight schedules. Vol. III, launch vehicles : book 3, Saturn V."
OMSF Program Status Review October 1965.; Edition "A". -
"Manned space flight schedules. Vol. III, launch vehicles : book 2, Saturn IB."
OMSF program status review October 1965.; Edition "A". -
"Saturn IB news reference."
Images, decriptions, graphics and explanations of the various Saturn rockets. -
"Apollo 6 Pre-Launch Press Conference."
The press conference was given at Cape Royal News Center in Cocoa Beach, Florida, on Wednesday, April 3, 1968, at 3:30 PM. Participants: William C. Schneider, Apollo Mission Director, NASA; George M. Low, Apollo Spacecraft Manager, NASA; Clifford Charlesworth, Apollo 6 Flight Director, Manned Spacecraft Center, NASA; Dr. Arthur Rudolph, Saturn V Program Office, Marshall Space Flight Center, NASA; Rocco A. Petrone, Apollo 6 Launch Director, Kennedy Space Center, NASA; Col. Royce Olson, USAF, Director DOD Manned Spaceflight Support Office, Patrick AFB; Chris Kraft, Director of Flight Operations, Manned Spacecraft Center. -
Apollo 10 press kit.
The press kit includes documentation on the Command and Service Module, Lunar Module, Saturn V launch vehicle, astronauts, and mission descriptions. Release No. 69-68. -
"Preliminary study of an unmanned lunar soft landing vehicle (Scientific Application)."
Report to the National Aeronautics and Space Administration Working Group on Lunar and Planetary Surfaces. -
"Saturn system study II."
Study regarding the three-stage carrier vehicle E-1 engines. -
"System description for Saturn vehicle (SA-1 through SA-4)."
Missing pages iv, 3, 6 to 8. Photocopy of files containing sections of the project. -
"Annual progress report :1966-1967."
The Annual Progress Report from July 1st, 1966 through June 30thm 1967. -
A Saturn rocket stage is loaded onto a barge on the Tennessee River.
The stage is being transported to the Mississippi Test Facility. -
A Saturn rocket stage is loaded onto a barge on the Tennessee River.
The stage is being transported to the Mississippi Test Facility. -
A Saturn rocket stage is loaded onto a barge on the Tennessee River.
The stage is being transported to the Mississippi Test Facility.