![UAH Archives, Special Collections, and Digital Initiatives](http://libarchstor2.uah.edu/digitalcollections/files/theme_uploads/881ce3c218c039cbfb10db85af3759d6.png)
Browse Items (6320 total)
Sort by:
-
"Listing of Historical Documents and Interview Tapes."
Archive copy is a poor photocopy.; Handwritten on the first page is "10/25/67".; Includes a letter dated Nov. 6, 1968 to Mr. Christensen from William D. Putnam. -
"Litter Bug" vacuum cleaner.
This flier describes the Litter Bug outdoor vacuum cleaner and its three models. -
"Little known engineer is father of 'Moon-Bug' idea."
News article that details the creation and function of a lunar module or "moon bug" created by Wernher von Braun. -
"Little Scraps Can Add Up to a Whale of a Lot; You may not be a little fish in a big pond, but you must do your part to safeguard classified materials. That minnow of information you inadvertently let loose may be the catch-of-the-day for some trolling listener. And, that's no fish story."
Whale eating scraps of paper with information on it in the ocean -
"Living in Huntsville and Madison County: Home of George C. Marshall Space Flight Center."
This pamphlet includes a memo to "Key MSFC Employees" from M. Keith Wible, Chief of the Manpower Utilization and Administration Office at Marshall Space Flight Center. -
"LM System Description."
Report that describes the major systems of the Lunar Module. -
"Loose chips sink ships, disable tanks, ground planes, etc., etc.; Careful what you put on the web."
Computer screen with puzzle pieces putting together the classified mission information -
"Lunar Applications of a Spent S-IVB/IU stage (LASS)."
Support of lunar exploration missions is a major consideration in future space program planning. The spent Saturn v/S-IVB/IU can support both lunar - orbit and lunar -landing operations. This paper investigates lunar applications of the spent stage, and incorporates data generated during Company-funded studies. Investigated here is the feasibility of using a launch vehicle employing standard S-IC and S-I1 boost stages to deliver a modified S-IVB/IU and large discretionary payloads to a lunar orbit (LASSO) and/or the lunar surface (LASS). Operations in Earth orbit and direct-ascent trajectories are examined, and consideration is given to the use of the spent stage as a shelter in a manner similar to the presently planned Earth orbital workshop operations. Both the LASSO and LASS concepts are recommended for consideration in future lunar exploration plans. These concepts are capable of placing a gross wet weight of 101,400 lb in lunar orbit or landing 63,580 lb on the lunar surface respectively. The effective payload capability can be enhanced by proper integration of translunar mission subsystems with the subsystems required for lunar orbit or surface operations. The vehicles can be available within 3 years, with current-technology hardware sufficient for performing the missions described.; Douglas Paper No. 4256. -
"M-45 casting alloy : Gyro stabilizer support."
8 x 10 inch black and white photograph of a gyro stabilizing support. -
"Maintenance Data - How and What."
This presentation is concerned with how maintenance data can be collected, what can be done with it and possible a few arguments why it should be of any concern. -
"Major Library Tools for Literature Searches."
This document discusses the types of publications used in information and literature searches, these being bibliographies, indexes, and abstract journals, and provides examples of these publications. It also gives examples of report citations and instructions on understanding them. -
"Make this your last belt for the road"
X-ray with skeleton with cracked skull and seat belt unfastened -
"Man, Machine, and Automatic Test Operations."
Essay detailing the relationship between men and machines." -
"Management matrix integrating logistics support planning events."
This was found folded inside Configuration Management. Taken from Defense Industry Bulletin, June 1968. Includes an organizational chart and an accompanying bibliography. -
"Management of the Space Program at a Field Center."
Transcription of a presentation from Wernher von Braun discussing the roles of the space vehicles in the Apollo project. -
"Management Plan for Saturn Vehicle System."
The purpose of this management plan is to set forth the channels 1 and methods used by the National Aeronautics and Space Administration for the development of the SATURN Vehicle System, This plan is based i on past experience and proven management principles of the Development Operations Division, The attached figures illustrate the plan. -
"Management problems faced in making future manned space exploration decisions."
This paper presents in synoptic form, an analysis of the management problems being faced in making fuhlre manned spaceflight decisions. It is an attempt to view the manned space program in total perspective - its relationship to other scientific research, other national programs, the role of Congress, the President's role, industry's role, and then show their relative influence and impact on decisior, making for the Post-Apollo period. -
"Management system"
The title has been cut off of document. This was placed inside the document Configuration Management. An organizational chart of plans and critical events related to those plans. -
"Manned Launch Vehicle Development."
Includes handwritten notes. Includes references to slides. Essay remarking on how space vehicles will interact on the moon's surface. -
"Manned Lunar Landing via Rendezvous."
Paper to be presented at the IAS National Meeting on Manned Space Flight. Focuses on operations leading to injection of the space craft into the lunar transfer trajectory. -
"Manned planetary flyby missions (based on Saturn/Apollo Systems) : executive summary report."
This report summarizes a study (by North American Aviation, Space Division) of Manned Interplanetary Flyby Missions to Venus and Mars during the period from 1975 to 1982. [The study was a broad but penetrating technical investigation of using a manned flight system for planetary exploration.] The results, along with previously known aspects of manned Mars and Venus flyby missions, vehicles, and systems, were integrated into total mission-system capable of performing a realistic and meaningful planetary exploration program. Manned Planetary Missions are feasible. Attractive multiplanet flyby missions can be performed by Saturn/Apollo systems. However, injected payload and mission requirements developed within the guidelines and assumptions of this study cannot be met with modified S-II or S-IV stages when used with the standard Saturn V Earth-launch vehicle. When using an Earth orbit assembly mode and an uprated Saturn Earth launch vehicle for application to manned planetary flyby missions, the launch vehicle should have a payload capability (2-stage to low Earth orbit) of 400,000 pounds or more for use with M(S)-IVB planetary injection stages. Manned planetary flyby missions provide a means of combining the favorable aspects of both manned and unmanned missions into a unique and highly effective planetary exploration mission-system capable of providing major significant inputs to the scientific and engineering questions concerning the interplanetary medium, our Sun, and our neighboring planets Venus and Mars. -
"Manned space and lunar exploration."
Paper includes references to figures and NASA's fundamental goals and principles. -
"Manned space flight program review : MSFC institutional report."
Report covers R & D, Administrative operations, staffing, facilities, and funding. -
"Manned Space Flight Program status for presentation to the Management Council."
This is material prepared in support of Dr. von Braun's presentation for the January 29, 1963, Management Council Meeting - Agenda Item 1, " MSFC Status Report". Presentation material consists of slides , a film report and narrative back-up information to support the presentation. -
"Manned space flight schedules. Vol. III, launch vehicles : book 1, Saturn I."
OMSF Program Status Review August 1965.; Edition "A" -
"Manned space flight schedules. Vol. III, launch vehicles : book 2, Saturn IB."
OMSF Program Status Review August 1965.; Edition "A" -
"Manned space flight schedules. Vol. III, launch vehicles : book 2, Saturn IB."
OMSF program status review October 1965.; Edition "A". -
"Manned space flight schedules. Vol. III, launch vehicles : book 3, Saturn V."
OMSF Program Status Review October 1965.; Edition "A". -
"Manned space flight schedules. Vol. III, launch vehicles : book 4, engines."
OMSF Program Status Review October 1965.; Edition "A" -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 6."
OMSF Program Status Review October 1965. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 2."
OMSF Program Status Review October 1965. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 3."
OMSF Program Status Review October 1965. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 4."
OMSF Program Status Review October 1965. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 6, various locations."
OMSF Program Status Review August 1965.; Edition "A" -
"Manufacturing Development Information Report."
The Committee on Interdivisional Dissemination of Manufacturing Development Information (CIDMDI) is comprised of NR - divisional representatives closely associated with advancement of the manufacturing arts . The purpose of the committee is to impart and receive development information of interest to NR manufacturing areas. Space Division's Central Manufacturing presents this CIDMDI Annual Report, for CFY 1968, in compliance with CIDMDI objectives. Included are research projects conducted by Central Manufacturing,as well as pertinent items submitted by the Apollo and Saturn Projects, for which, acknowledgement and appreciation are extended. Because of the large number of reports contained in this issue, only general information has been presented. Detailed data, if permissible, will be made available on request. For further information, contact L. B. Norwood, Space Division, Extension 1915.; PAP 68-0013.; Prepared by Advanced Projects Section of Central Manufacturing. L. B. Norwood, CIDMDI, Representative. F. H. Burry, Director, Manufacturing. -
"Manufacturing history - LM-5."
Essay that focuses on the achievements of the Grumman Aerospace Corporation. -
"Manufacturing Organizational Chart : Saturn S-II program."
Organizational chart of the North American Rockwell Corperation : 1968.