UAH Archives, Special Collections, and Digital Initiatives

Browse Items (135 total)

  • loc_hutc_525_526.pdf

    This flier highlights Marshall Space Flight Center's role in the lunar landing and illustrates each step of a successful mission, from liftoff at Kennedy Space Center to splashdown in the Pacific Ocean.
  • mannspacfligprogrevimsfcinstrepo_082007091604.pdf

    Report covers R & D, Administrative operations, staffing, facilities, and funding.
  • ManuplanSatV.pdf

    This procedure provides the necessary information for the fabrication and assembly of the Saturn C-5 booster stage S-IC. The manufacturing methods outlined herein represent techniques that will be utilized both at Michoud and MSFC wherever possible. The concepts and methods outlined are of a preliminary nature consistent with the stage of design at this time. These concepts and methods are subject to change. This Manufacturing Plan will be periodically updated to reflect such changes. The processes and techniques proposed in this Manufacturing Plan are generally within the present state of the art, consistent with reliability requirements for manned space flight and advocated for use with the limited manufacturing facilities of the Marshall Space Flight Center and the Michoud Production Facility.; Includes memorandum dated 15 Jan. 1963 from J. H. Chesteen, Chief, Engineering Planning Section. M-ME-SE.; Includes memorandum from J. H. Chesteen and N. E. Johansen to W. B. Edmiston and W. R. Kuers--subject: Integration Boeing-MSFC Manufacturing plan. December 18, 1962.
  • ManuplanSatV(1).pdf

    Manufacturing plan for Saturn V Booster stage S-IC
  • Mastplanfordocu.pdf

    Prepared for National Aeronautics and Space Administration, George C. Marshall Space Flight Center, Huntsville, Alabama. Accepted by V.C. Sorensen, Chief, Management Services Office. Management Services Project, RCA; SUMMARY: The objective of this study is to describe a comprehensive plan for the development and full utilization of methods and means to be employed in the years prior to 1976 for the effective acquisition, collection, storage, retrieval, distribution, and use of engineering documentation. Because of the violently changing state of the art of data acquisition, storage, and retrieval the description of the plan does not embrace the details of a total decade of phased change. Rather it describes actions that can and should be taken in the relatively near future, and proposes a continuing series of later studies to keep this plan current for the full decade.
  • memcolpreandsubofpop65-3_071907124926.pdf

    This memo constitutes a request for all MSFC elements to prepare and submit information as scheduled in Enclosure 1. This schedule lists only key interface dates from one organization to another. It will be the responsibility of I-RM and R-RM to implement internal schedules compatible with Enclosure 1.
  • Michassyfacteldir_072908145639.pdf
  • msfcmannedspaceflight_050807110513.pdf

    This is material prepared in support of Dr. von Braun's presentation for the January 29, 1963, Management Council Meeting - Agenda Item 1, " MSFC Status Report". Presentation material consists of slides , a film report and narrative back-up information to support the presentation.
  • MSFCmannspacfligprogstatforaug271963manacounmeet_061307104700.pdf

    This is material prepared in support of Dr. von Braun's presentation for the August 27, 1963, Management Council Meeting - Agenda Item 2, "MSFC Status Report."; Original is photocopy.; M-CP-P(R40).; TMXS 7544.; Includes references to film and slides.; Contents include: 1. SA-5 Status; 2. SA-5 voice orbital transmitter; 3. Integration effort.
  • MSFCmannspacfligprogstatfordec181962manacounmeet_061107105019.pdf

    This is material prepared in support of Dr. von Braun's presentation for the December 18, 1962, Management Council Meeting - Agenda Item 2, "MSFC Status Report."
Output Formats

atom, csv, dc-rdf, dcmes-xml, json, omeka-xml, rss2