Browse Items (135 total)
Sort by:
-
"Conditions contributing to stress corrosion [list] photograph."
8 x 10 inch black and white photograph. A photograph of a list of things contributing to stress corrosion. Referenced by "Materials in Space Exploration." Is part of envelope containing photos accompanying C. E. Cataldo paper "Materials in Space Exploration." -
Double seal insulation [drawing] photograph.
8 x 10 inch black and white photograph.; Drawing contains information about the modified epoxy adhesive, aluminum film, mylar film, perforated phenolic honeycomb core, tank skin, mylar honeycomb core, polyurethane adhesive, weight and thermal conductivity.; Photo negative no. 651746 M-268. -
F-1 engine photograph.
8 x 10 inch black and white photograph. Engine parts are labeled. -
"Evolution of the Saturn Booster."
8 x 10 inch Black & White photograph. MS-G 103-63 Nov. 22, 63 is on the photograph. Displays the evolution of space-rocket designs side-by-side. -
"The impact of manufacturing on design as related to accessibility."
The purpose of this paper is to emphasize the need for accessibility in the assembly and maintenance of spacecraft. This is especially pertinent because accessibility to subsystems for replacement, repair, and maintenance has proven to be one of the more costly phases of preflight preparation. The most successful programs in this day and age have been when the design and manufacturing engineers work side by side around a mockup where solutions to the problems can be visually seen and solved, keeping in mind the assembly as related to accessibility. Therefore, it will be shown that in order to overcome the difficulties, designers should adapt a hard, fast ground rule that each unit must be accessible and individually removable without disturbing the other units.; Aeronautic and Space Engineering and Manufacturing Meeting, Los Angeles, Calif. Oct. 7 - 11, 1968. -
"Master plan for documentation management and use."
Prepared for National Aeronautics and Space Administration, George C. Marshall Space Flight Center, Huntsville, Alabama. Accepted by V.C. Sorensen, Chief, Management Services Office. Management Services Project, RCA; SUMMARY: The objective of this study is to describe a comprehensive plan for the development and full utilization of methods and means to be employed in the years prior to 1976 for the effective acquisition, collection, storage, retrieval, distribution, and use of engineering documentation. Because of the violently changing state of the art of data acquisition, storage, and retrieval the description of the plan does not embrace the details of a total decade of phased change. Rather it describes actions that can and should be taken in the relatively near future, and proposes a continuing series of later studies to keep this plan current for the full decade. -
"Manufacturing plan : Saturn V : booster stage S-IC. Volume 1."
This procedure provides the necessary information for the fabrication and assembly of the Saturn C-5 booster stage S-IC. The manufacturing methods outlined herein represent techniques that will be utilized both at Michoud and MSFC wherever possible. The concepts and methods outlined are of a preliminary nature consistent with the stage of design at this time. These concepts and methods are subject to change. This Manufacturing Plan will be periodically updated to reflect such changes. The processes and techniques proposed in this Manufacturing Plan are generally within the present state of the art, consistent with reliability requirements for manned space flight and advocated for use with the limited manufacturing facilities of the Marshall Space Flight Center and the Michoud Production Facility.; Includes memorandum dated 15 Jan. 1963 from J. H. Chesteen, Chief, Engineering Planning Section. M-ME-SE.; Includes memorandum from J. H. Chesteen and N. E. Johansen to W. B. Edmiston and W. R. Kuers--subject: Integration Boeing-MSFC Manufacturing plan. December 18, 1962. -
"Manufacturing plan : Saturn V : booster stage S-IC. Volume 2."
Manufacturing plan for Saturn V Booster stage S-IC -
"Outline of the capability of technical facilities and equipment at the George C. Marshall Space Flight Center."
Outline of the equipment present at George C. Marshall Space Flight Center. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (April 1, 1966 through April 30, 1966)."
Progress report for the month of April, 1966. -
Various organization charts of NASA-MSFC during 1960-1969.
A collection of organization charts from years 1960 to 1969. -
"First Annual Logistics Management Symposium: September 13 and 14, 1966."
The proceedings of the First Annual Logistics Management Symposium are forwarded with the hope that the information will be of assistance to attendees and their staffs in the planning and management of logistics support programs. I recognize that there is still much study required before all management techniques and procedures for support programs are known and understood, but I believe that support problems are made easier by exchange of knowledge. The Symposium was based on this belief and we plan to continue the search for ways to achieve better program support at a lower cost. Edmund F. O'Connor, Director, Industrial Operations. -
"Final Script for Saturn I/IB Quarterly Film Report, No. 24 (covering April, May, June 1965)."
Film script for the Saturn Quarterly Film Report - April through June, 1965. -
"Final Script for Saturn IB Quarterly Film Report, No. 26 (covering October, November, December, 1965)."
Film script for the Saturn Quarterly Film Report - October through December, 1965. -
"Film Script for Saturn Quarterly Film Report, No. 19 (January, February, March) 1964."
Film script for the Saturn Quarterly Film Report - January through March, 1964. -
"Film Script for Saturn I/IB Quarterly Film Report, Nr. 23 (Covering January, February, March 1965)."
Film script for the Saturn Quarterly Film Report - January through March, 1965. -
"Film Script for Saturn I/IB Quarterly Film Report, Nr. 22 (Covering October, November, December 1964)."
Film script for the Saturn Quarterly Film Report - October through December, 1964. -
"Film Script for Saturn Quarterly Film Report, Nr. 20 (April, May, June) 1964."
Film script for the Saturn Quarterly Film Report - April through June, 1964. -
"Films List : NASA Motion Picture Film Service Area Five: Alabama - Kentucky - Louisiana - Mississippi - Tennessee."
A list of films oriented towards the National Space Program and other related topics. -
"Engines for Manned Flight."
8 x 10 inch black and white photograph.; Images included are: A-3 oxygen-hydrogen, H-1 oxygen-kerosene, J-2 oxygen-hydrogen, F-1 oxygen-Kerosene, M-1 oxygen-hydrogen. The thrust pounds is also listed.Shows them in reference to a human as a scale. -
"George C. Marshall Space Flight Center Telephone Directory October, 1969."
Information shown in the telephone directory is current as of September 12, 1969. -
"Future Projects Office."
The purpose of this brochure is to give interested readers, outside as well as within the agencies of the U.S. Government, information on the mission and activities of the Future Projects Office, George C. Marshall Space. -
"Launch Vehicle Engines Project Development Plan."
The primary mission objective of the 5-2 Engine Project is to continue development of a liquid oxygen/liquid hydrogen engine. capable of high-altitude restart. Both Saturn IB and Saturn V vehicles will use the J-2 engine; the S-IVB stage of Saturn IB vehicles and S-IVB stage of Saturn V vehicles will be equipped with a single J-2 engine. The S-I1 stage of Saturn V vehicles will use a cluster of five J-2 engines. Figure 1-3 illustrates these stages. -
"Launch Vehicle Engines Project Development Plan."
This revised edition of the Launch Vehicle Engines Project Development Plan supersedes the issue dated July 1, 1965. Significant changes which have been made are:- Removal of classified data to permit publication as an unclassified document; - Removal of material applicable to the RL-10 Engine Project which was transferred to the Lewis Research Center effective May 1, 1966; - Elimination of detailed schedules which quickly become obsolete; - Punched for maintenance in loose-leaf 3-ring binders and for ease in updating material through issuance of replacement sheets. Binders are not furnished. The information in this document is current to January 1, 1967.; The Launch Vehicle Engines Project Development Plan is established in accordance with requirements of NASA General Management Instruction 4-1-1, Planning and Implementation of NASA Projects, and OMSF Instruction MP 9320.044, Preparation and Revision of Program/Project Development Plans (PDP's). The Plan, herein referred to as the PDP, has been developed within the scope of current Apollo Projects Approval Documents (PADS) and will be maintained by the Engine Program Manager to identify program requirements, responsibilities, tasks, and resources, and time phasing of major actions required to accomplish the Engine Program. -
"Key MSFC Personnel for Potential Interview Efforts."
Essay detailing potential candidates for potential interviews. -
"Memorandum: collection, preparation and submission of POP 65-3."
This memo constitutes a request for all MSFC elements to prepare and submit information as scheduled in Enclosure 1. This schedule lists only key interface dates from one organization to another. It will be the responsibility of I-RM and R-RM to implement internal schedules compatible with Enclosure 1. -
"Manned space flight program review : MSFC institutional report."
Report covers R & D, Administrative operations, staffing, facilities, and funding. -
"Michoud Assembly facility telephone directory : Boeing Launch Systems Branch, Chrysler Space Division, LTV Range System Div., Mason-Rust Engineering Company."
Telephone directory displaying available channels and how to access them. -
"MSFC Manned Space Flight Program status for presentation to the Management Council, March 26, 1963."
This is material prepared in support of Dr. Von Braun's presentation for the March 26, 1963, Management Council Meeting - Agenda Item 3, "MSFC Status Report". Presentation material consists of slides, a film report and narrative backup-information to support the presentation. -
"MSFC Manned Space Flight Program status for December 18, 1962 Management Council meeting."
This is material prepared in support of Dr. von Braun's presentation for the December 18, 1962, Management Council Meeting - Agenda Item 2, "MSFC Status Report." -
"MSFC Manned Space Flight Program status for presentation to the Management Council."
This is material prepared in support of Dr. von Braun's presentation for the August 27, 1963, Management Council Meeting - Agenda Item 2, "MSFC Status Report."; Original is photocopy.; M-CP-P(R40).; TMXS 7544.; Includes references to film and slides.; Contents include: 1. SA-5 Status; 2. SA-5 voice orbital transmitter; 3. Integration effort. -
"Manned Space Flight Program status for presentation to the Management Council."
This is material prepared in support of Dr. von Braun's presentation for the January 29, 1963, Management Council Meeting - Agenda Item 1, " MSFC Status Report". Presentation material consists of slides , a film report and narrative back-up information to support the presentation. -
"MSFC projects index by laboratory."
Project indexes included for: Advanced Systems Office, Aero-Astrodynamics Laboratory, Astrionics Laboratory, Computation Laboratory, Engineering Computation Division, Manufacturing Engineering Laboratory, Propulsion and Vehicle Engineering Laboratory, Quality and Reliability Assurance Laboratory, Research and Development Operations, Research Projects Laboratory, and Test Laboratory. -
"The reliability picture at Marshall Space Flight Center - philosophy, staffing and management. Proposed talk to Orlando Section American Society for Quality Control."
Document that discusses the importance of reliability in engineering. -
Saturn IB launch project development plan.
This document is an official release of Manned Space Flight and its requirements shall be implemented by all cognizant elements of Manned Space Flight Program. William Teir, Manager, Saturn IB Program; E. F. O'Connor, Director, Industrial Operations; Wernher Von Braun, Director, Marshall Space Flight Center; Samuel C. Phillips, Director, Apollo Program. -
"Saturn V Apollo lunar orbit rendezvous mission."
Diagram explaining the process of a lunar mission from liftoff to recovery. -
"Technical Information Summary Apollo-9 (AS-504) Apollo Saturn V Space Vehicle."
The document presents a brief and concise description of the Apollo 9 Saturn Space Vehicle. -
"Technical information summary Apollo-10 (AS-505) Apollo Saturn V space vehicle."
The document presents a brief and concise description of the AS-505 Apollo Saturn Space Vehicle. Where necessary, for clarification, additional related information has been included. -
"Technical facilities & equipment digest."
This document portrays the capability of technical facilities and equipment at the George C, Marshall Space Flight Center (MSFC) , one of three basic field centers under the NASA Office of Manned Space Flight. -
"George C. Marshall Space Flight Center Mississippi Test Facility Telephone directory 1965."
Telephone directory belonging to the George C. Marshal Space Flight Center Mississippi Test Facility for October 1965.