The first half of this film shows the outside of the Dannenbergs' new house being painted. Also shown are Konrad, Ingeborg and Klaus inspecting the new dwelling. The latter half of the film shows the construction crew digging a path for a pipe to be run into the building, presumably for septic waste. Fall 1958.
Statement of work: Man/Machine activities -ATM; ATM problem areas; EVA commuting problem; Other EVA considerations; Analysis of crew considerations Mission 211/212; Mission objectives Crew Considerations; Mission Fight Profile & Operations Crew Considerations; Experiment operations crew considerations; EVA equipment requirements; Crew considerations carrier recommendations; Conclusions and recommendations crew considerations; Crew operations requirements preliminary 10 August 1996; ATM stabilization and control; ATM Carrier habitability and profile; Other ATM man/machine considerations.; Original is a poor photocopy.; Document has no page numbering.