
Browse Items (8239 total)
Sort by:
-
Stipulation of the testimony of Colonel William C. Pritchard
Written testimony of William C. Pritchard, Colonel with the Army Physical Evaluation Board at Walter Reed Hospital, as presented if he were "present in court". Page two missing. Handwritten note at the bottom says, "2d page only had signatures." -
Letter to Harry M. Ayers from William S. Pritchard.
Pritchard writes to Ayers in response to his January 4, 1958 letter regarding the reinstatement of Colonel John C. Nickerson, Jr. He details what he believes to be "the exact facts in the Nickerson case." He states that Nickerson was in violation of Army orders and therefore is not qualified to serve in a facility like Redstone Arsenal in Huntsville, Alabama. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report, December."
Monthly progress report of the month of December, 1968. -
Oral History Interview With Edwin Pruitt
Edwin Pruitt is from a small town in Alabama. He went to Auburn University, and when he was a sophomore there, he applied to a co-op position. In this co-op, he was assigned to a flight-dynamics group. Edwin was not satisfied with this position, so he asked to be switched to another one. In this new co-op, he was able to drive around on the simulated moon surface. Some things he was also involved in was diving into the Neutral Buoyancy Simulator, flying on the KC-135, and he had the freedom to represent his group with other part of the center where he worked. After Edwin graduated from college, he got a job at GE Aerospace in Valley Forge. They had a contract with the Airforce to train the Airforce astronauts. He eventually got laid off from this position, and he next got a job at Teledyne Brown Engineering. After working there for a couple of years, he found a job at Matrix in Huntsville. After working here, he found a job at Essex working on proposals.Tags Oral History -
Press Release : S-IC simulator--Immediate release.
Huntsville, Ala. -- NASA Marshall Space Flight Center engineers and scientists will soon begin using a giant Saturn V booster simulator in making various tests of equipment and facilities here and at Michoud Operations, Mississippi Test Operations and Cape Kennedy. -
"Master list of projects."
Note attached to document to Mr. Christensen from William D. Putnam. List of projects ordered by criteria. -
"Engineering : Saturn S-II program"
Organizational chart diagram of the North American Rockwell Corporation Engineering division: 10-14-1968