Browse Items (107 total)
Sort by:
-
"JULY 11, 1979 1 HOUR REPORT."
This is a report about the Skylab 1 reentry. -
Skylab Impact Corridor Report.
This is a report about the Skylab debris field in Australia. -
"Skylab Experiments Volume 1 Physical Science, Solar Astronomy Information for Teachers."
This is a workbook for science teachers to create lesson plans around. -
"Human Factor: ATM/Skylab."
The "Skylab" in the title was a later addition. This is a summary of the human factor aspects of the Apollo Applications space habitat. -
"Human Performance Issues Arising From Manned Space Station Missions."
This is a series of interviews with various anonymous astronauts from various programs including Skylab, focused on the future of manned spaceflight. -
Skylab Blueprint "119700."
This blueprint depicts a working space for the Skylab habitat, and includes work stations, and storage systems. This blueprint also depicts the water storage system for the Skylab habitat. -
"Skylab Mission Commentary 5/14/73 1:10 CST 18:04 GET 5:32 MC27/1" - "Skylab Mission Commentary 5/15/73 1:20 CST MC38/1."
This mission commentary depicts the initial discovery of Skylab 1's Orbital Workshop Solar arrays not deploying as intended. -
"Skylab Mission Commentary 5/14/73 1:10 CST 18:04 GET 5:32 MC27/1" - "Skylab Mission Commentary 5/15/73 1:20 CST MC38/1."
This mission commentary depicts NASA's attempts to alleviate some of the temperature issues caused by the broken micrometeoroid shield on Skylab 1. -
"SL II MC 1/1 Time: 6:32 a.m. CDT, T-01:25:00 GET 5/25/73" - "SL-II MC-11/3 Time: 08:01 A.M. CDT, T-1 minute Get 5/25/73."
This mission commentary depicts the Skylab 1 launch. -
"SL-II MC-60/1 Time: 22:50 CDT 14:50 GET 5/25/73" - "SL-II MC 64/1 Time: 01:25 CDT 17:25 GET 5/25/73."
This mission commentary depicts Skylab 2 docking with Skylab 1. This mission commentary also depicts the Skylab 2 crew beginning work on resolving the solar panel and micrometeoroid shield problems. -
"SL-II MC-64/2 Time: 01:25 CDT 17:25 GET 5/25/73" - "SL-II MC 75/2 Time: 10:17 a.m. CDT 1:02:17 GET 5/26/73."
This mission commentary depicts the improving temperature conditions on Skylab 1 following the Skylab 2 crew's efforts to resolve the temperature problems. -
"SL-II MC75/3 Time: 10:17 a.m. CDT, 1:02:17 GET 5/26/73" - "SL-II MC-79/3 Time: 11:24 a.m. CDT 1:03:24 GET 5/26/73."
This mission commentary depicts the Skylab 2 crew working to secure the fastening between the Skylab 2 command module and the Skylab 1 habitat. This mission commentary also depicts the Skylab II crew working on the life support systems. -
"SL-II MC-81/1 Time: 11:44 a.m. CDT, 1:03:44 GET 5/26/73" - "SL-II MC-88/1 Time: 1:34 p.m. CDT 1:05:34 GET 5/26/73."
This mission commentary depicts the Skylab 2 crew trying to resolve a low temperature problem in the scientific airlock. The commentary also depicts the Astronaut assessment of the Orbital Workshop high temperature problems. -
"SL-II MC-88/2 Time: 1:34 p.m. CDT, 1:05:34 GET 5/26/73" - "SL-II MC-96/1 Time: 15:13 p.m. CDT 1:07:13 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew carrying out maintenance on the life support systems. This mission commentary also depicts the Skylab 2 crew operating the Apollo Telescope Mount. -
"SL-II MC-97/1 Time: 3:23 p.m. CDT, 1:07:23 GET 5/26/73" - "SL-II MC-101/2 Time: 4:56 p.m. CDT 1:08:56 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew discussing the deployment of the parasol for the alleviation of temperature pressures. The Skylab 2 crew is also depicted making the preparations for the deployment of the solar parasol. -
"Time: 17:15 p.m. CDT, 1:09:15 GET SL-II MC102/1 5/26/73" - "SL-II MC-108/1 Time: 19:53 p.m. CDT 1:11:53 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew unpacking and assembling the solar parasol. The Skylab 2 crew is also depicted deploying the solar parasol. -
"SL-II MC-109/1 Time: 20:02 CDT 1:12:02 GET 5/26/73"-"SL-II MC-114/3 Time: 21:36 CDT 01:13:36 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew finishing their work on the solar parasol. This mission commentary also depicts the discussion between the Skylab 2 crew and ground control about the permanent move to habitation in the Orbital Workshop. -
"SL-II MC-114/4 Time: 21:36 CDT 01:13:36 GET 5/26/73" - "SL-II MC-117/4 Time: 23:47 CDT, 1:15:47 GET 5/27/73."
This mission commentary primarily depicts the Skylab 2 crew transitioning to permanent habitation in the Skylab 1 Orbital Workshop from the Skylab 2 Command module. -
"SL-II MC-616/1 Time: 20:41 CDT, 14:01:41 GMT 6/6/73" - "SL-II MC-630/1 Time: 07:57 CDT, 14:12:57 GMT 6/7/73."
This mission commentary primarily depicts the Skylab 2 crew working on, and maintaining the Apollo Telescope Mount systems. -
"SL-III MC-1/1 Time: 05:01 CDT 09:10 GMT 7/28/73" - "SL-III MC-10/4 Time:06:08 CDT 09:11:08 GMT 7/8/73."
This mission commentary describes the Skylab 3 launch. -
"The Skylab Student Project."
Students involved in the student experiment selection are: Bochsler, Daniel C., Converse, Vincent W., Crites, Troy A., Dunlap, W. Brian, Hamilton, John C., Hopfield, Alison, Jackson, Kathy L., Johnston, Roger G., Leventhal, Jeanne L., Meister, Todd A., Miles, Judith S., Peltz, Cheryl A., Quist, Terry C., Reihs, Joe W., Schlack, Donald W., Wordekemper, Joel G., Shannon, Neal W., Staehle, Robert L., Zmolek, Joe B. Students whose experiments were held in consideration for future programs are Stein, Keith L., Brandt, Kent M., McGee, Keith, Sherhart, Kirk M., Merkel, Gregory A., Healy, James E.