Browse Items (7888 total)
Sort by:
-
Skylab Airlock, and Skylab Airlock Components being Prepared for Installation.
The images depict the electronic and external views of the Skylab airlock during the assembly process. The images also depict airlock components being prepared seperately from the Skylab airlock, in the cleanroom, to be installed on the Skylab airlock. -
External Views of Skylab Habitat and Skylab Airlock.
The images depict external views of the Skylab habitat, and the Skylab airlock during the assembly process. -
Internal Views of Skylab Storage Systems.
The images depict the storage systems in the Skylab habitat. These storage systems contain materials to support habitation, or they contain experiment components. -
Internal Views of Skylab Experiments.
The images depict the Skylab experiments, as installed in the Skylab habitat. The images also depict the Skylab tape recorder, which would be used to record data from the three manned Skylab missions. -
Internal Forward View of the Skylab Habitat.
The images depict the Skylab habitat from an internal forward view. The images depict the docking port and the docking tunnel. The images depict the stowage systems designed to hold experiments that would be carried out in space. The image depicts completed wiring systems. -
Internal Views of Cone Area and Multiple Docking Adapter.
The images depict the Skylab cone area, and includes descriptions of the stowage systems in the cone area. The images also depict the multiple docking adapter -
External and Electronic Views of the Skylab Habitat.
The images depict the assembly process for aspects of the Skylab habitat. The pictures primarily depict external views, and internal electronics. The pictures feature the Skylab docking port in various states of assembly. -
"Electrical support equipment" (ESE) [photograph].
8 x 10 inch black and white photograph. A photograph of a workspace. -
"Manned space flight schedules. Vol. III, launch vehicles : book 3, Saturn V."
OMSF Program Status Review October 1965.; Edition "A". -
"Manned space flight schedules. Vol. III, launch vehicles : book 2, Saturn IB."
OMSF program status review October 1965.; Edition "A". -
Saturn V project development plan : November 1967.
This document revises and supersedes the Saturn V Project Development Plan, dated March, 1967. Approved: Arthur Rudolph, Manager, Saturn V Program; Samuel C. Phillips, Major General, USAF, Director, Apollo Program. -
Space age vision [photograph].
8 x 10 inch black and white photograph. -
"From Michoud to the Moon."
A history and description of the Michoud Assembly Facility in New Orleans, Louisiana. -
"Launch Control and Checkout Equipment (LCCE) [photograph]."
Description of an 8 x 10 inch black and white photograph. -
"Mississippi test - torrents of flame."
Description of a photograph of a rocket static test firing. -
"Project Apollo 7: news release."
News release surveying the Apollo 7 rocket and discussing future missions. -
"Saturn IB news reference."
Images, decriptions, graphics and explanations of the various Saturn rockets. -
Saturn V news reference.
This book is designed to serve as an aid to newsmen in present and future coverage of the Saturn IB in its role in the Saturn/Apollo Program and as a general purpose large launch vehicle. -
"Standards of conduct for NASA employees."
NASA handbook which establishes what code of conduct is acceptable as a representative of the company and what behavior is not. -
Transatel.
Description of the Transtel without accompanying photograph. -
STS 51-L Data and Design Analysis Task Force Lessons Learned Report.
This report was produced by the Data and Design Analysis Task Force "to support the Presidential Commission appointed by President Ronald Reagan to investigate the loss of the Space Shuttle Challenger and its crew." The report includes details from investigations in the areas of Development and Production, Prelaunch Activities, Accident Analysis, and Mission Planning and Operations. The report includes a recommendation to conduct an investigation "into the manufacturing process, final delivery and material cutting of the O-rings" that failed during the accident. -
Interview with G.A. Phelps (Seal Beach?).
Interview on Materials Management, Configuration Management, and Changes in Design. Full side of tape.Tags Oral History -
Interviews with Fontaine and Attinello, Davenport, Rocketdyne.
Interview with Rocketdyne engineers on rocket engine design and stability. Both sides of tape.Tags Oral History -
Interview with H. Paul.
Interview with German engineer on engine design, propellants, thermodynamics, and design barriers and overcoming them. Both sides of tape.Tags Oral History -
Interview with Newell.
Interview on the Development of Saturn and the general design and management philospohy of NASA. One side of tape only.Tags Oral History -
Interview with Schwartz (chief engineer?).
Interview on the development of Saturn engine design and control, as well as life at the Mississippi engine test site. Both sides of the tape.Tags Oral History -
Interview with Ed Mims.
Interview on the fuels involved in the Saturn as well as the transport and management of these fuels. Both sides of tape.Tags Oral History -
Interview with Bauer.
Interview on the developments on Thor applied to the Saturn Program, structures, Welding, Machining of Part, and Insulation of the rocket. Both sides of tape.Tags Oral History -
Interviews with Weidner and Neubert.
Side 1 is an interview with Weidner and Neubert on the testing of Saturn and the different design philosophies of various NASA groups.Tags Oral History -
Interviews with Sawyer and Kudebeh (Rocketdyne?).
Interviews with Sawyer (0 - 16:58 S1) and Kudebeh (16:58 S1 - end S2) on weight penalties, schedule/performance bonuses, and project management.Tags Oral History -
Interviews with Shields and Davenport (Rocketdyne?).
Interview with Davenport (0-23:44 S1) and Shields (23:44 S1 - end S2). Topics covered include the reliability of the F1 engine, Skylab, and electronic manufacturing.Tags Oral History -
Interview with Dieter Grau.
Dieter Grau interviewed on failure analysis and management of Saturn program. Both sides of tape.Tags Oral History -
Interviews with Wernher von Braun conducted by Dr. Emme and T. Ray.
Interview with Dr. von Braun by Dr. Emme. Beginning of side 1 to 19:50. -
"Apollo 6 Pre-Launch Press Conference."
The press conference was given at Cape Royal News Center in Cocoa Beach, Florida, on Wednesday, April 3, 1968, at 3:30 PM. Participants: William C. Schneider, Apollo Mission Director, NASA; George M. Low, Apollo Spacecraft Manager, NASA; Clifford Charlesworth, Apollo 6 Flight Director, Manned Spacecraft Center, NASA; Dr. Arthur Rudolph, Saturn V Program Office, Marshall Space Flight Center, NASA; Rocco A. Petrone, Apollo 6 Launch Director, Kennedy Space Center, NASA; Col. Royce Olson, USAF, Director DOD Manned Spaceflight Support Office, Patrick AFB; Chris Kraft, Director of Flight Operations, Manned Spacecraft Center. -
Apollo 10 press kit.
The press kit includes documentation on the Command and Service Module, Lunar Module, Saturn V launch vehicle, astronauts, and mission descriptions. Release No. 69-68. -
"After the Moon - What? Minutes of the Manned Flight Awareness Seminar."
The seminar was held at the Manned Spacecraft Center, September 25-26, 1969. -
Crowds and television cameras wait for President John F. Kennedy during his second visit to Huntsville.
Kennedy visited Huntsville on Armed Forces Day 1963. He first visited the area on September 11, 1962. -
NASA personnel wait to greet President John F. Kennedy during his second visit to Huntsville.
Kennedy visited Huntsville on Armed Forces Day 1963. He first visited the area on September 11, 1962.