Browse Items (8023 total)
Sort by:
-
"SL-II MC-97/1 Time: 3:23 p.m. CDT, 1:07:23 GET 5/26/73" - "SL-II MC-101/2 Time: 4:56 p.m. CDT 1:08:56 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew discussing the deployment of the parasol for the alleviation of temperature pressures. The Skylab 2 crew is also depicted making the preparations for the deployment of the solar parasol. -
"SL-II MC-88/2 Time: 1:34 p.m. CDT, 1:05:34 GET 5/26/73" - "SL-II MC-96/1 Time: 15:13 p.m. CDT 1:07:13 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew carrying out maintenance on the life support systems. This mission commentary also depicts the Skylab 2 crew operating the Apollo Telescope Mount. -
"SL-II MC-81/1 Time: 11:44 a.m. CDT, 1:03:44 GET 5/26/73" - "SL-II MC-88/1 Time: 1:34 p.m. CDT 1:05:34 GET 5/26/73."
This mission commentary depicts the Skylab 2 crew trying to resolve a low temperature problem in the scientific airlock. The commentary also depicts the Astronaut assessment of the Orbital Workshop high temperature problems. -
"SL-II MC75/3 Time: 10:17 a.m. CDT, 1:02:17 GET 5/26/73" - "SL-II MC-79/3 Time: 11:24 a.m. CDT 1:03:24 GET 5/26/73."
This mission commentary depicts the Skylab 2 crew working to secure the fastening between the Skylab 2 command module and the Skylab 1 habitat. This mission commentary also depicts the Skylab II crew working on the life support systems. -
"SL-II MC-64/2 Time: 01:25 CDT 17:25 GET 5/25/73" - "SL-II MC 75/2 Time: 10:17 a.m. CDT 1:02:17 GET 5/26/73."
This mission commentary depicts the improving temperature conditions on Skylab 1 following the Skylab 2 crew's efforts to resolve the temperature problems. -
"SL-II MC-60/1 Time: 22:50 CDT 14:50 GET 5/25/73" - "SL-II MC 64/1 Time: 01:25 CDT 17:25 GET 5/25/73."
This mission commentary depicts Skylab 2 docking with Skylab 1. This mission commentary also depicts the Skylab 2 crew beginning work on resolving the solar panel and micrometeoroid shield problems. -
"SL II MC 1/1 Time: 6:32 a.m. CDT, T-01:25:00 GET 5/25/73" - "SL-II MC-11/3 Time: 08:01 A.M. CDT, T-1 minute Get 5/25/73."
This mission commentary depicts the Skylab 1 launch. -
"Skylab Mission Commentary 5/14/73 1:10 CST 18:04 GET 5:32 MC27/1" - "Skylab Mission Commentary 5/15/73 1:20 CST MC38/1."
This mission commentary depicts NASA's attempts to alleviate some of the temperature issues caused by the broken micrometeoroid shield on Skylab 1. -
"Skylab Mission Commentary 5/14/73 1:10 CST 18:04 GET 5:32 MC27/1" - "Skylab Mission Commentary 5/15/73 1:20 CST MC38/1."
This mission commentary depicts the initial discovery of Skylab 1's Orbital Workshop Solar arrays not deploying as intended. -
Skylab Blueprint "119700."
This blueprint depicts a working space for the Skylab habitat, and includes work stations, and storage systems. This blueprint also depicts the water storage system for the Skylab habitat.