
Browse Items (8239 total)
Sort by:
-
"Management Plan for Saturn Vehicle System."
The purpose of this management plan is to set forth the channels 1 and methods used by the National Aeronautics and Space Administration for the development of the SATURN Vehicle System, This plan is based i on past experience and proven management principles of the Development Operations Division, The attached figures illustrate the plan. -
Management plan and competition for second stage for Saturn.
Archive copy is a photocopy. -
"Vol. IV 3rd edition Management Information."
This document contains copies of management charts and photographs maintained in the Management Information Office of the Executive Staff on Advanced Program and Research and Technology Areas. -
"Maintenance Data - How and What."
This presentation is concerned with how maintenance data can be collected, what can be done with it and possible a few arguments why it should be of any concern. -
"Lunar Applications of a Spent S-IVB/IU stage (LASS)."
Support of lunar exploration missions is a major consideration in future space program planning. The spent Saturn v/S-IVB/IU can support both lunar - orbit and lunar -landing operations. This paper investigates lunar applications of the spent stage, and incorporates data generated during Company-funded studies. Investigated here is the feasibility of using a launch vehicle employing standard S-IC and S-I1 boost stages to deliver a modified S-IVB/IU and large discretionary payloads to a lunar orbit (LASSO) and/or the lunar surface (LASS). Operations in Earth orbit and direct-ascent trajectories are examined, and consideration is given to the use of the spent stage as a shelter in a manner similar to the presently planned Earth orbital workshop operations. Both the LASSO and LASS concepts are recommended for consideration in future lunar exploration plans. These concepts are capable of placing a gross wet weight of 101,400 lb in lunar orbit or landing 63,580 lb on the lunar surface respectively. The effective payload capability can be enhanced by proper integration of translunar mission subsystems with the subsystems required for lunar orbit or surface operations. The vehicles can be available within 3 years, with current-technology hardware sufficient for performing the missions described.; Douglas Paper No. 4256. -
"LM System Description."
Report that describes the major systems of the Lunar Module. -
"Letter to Mr. David Christensen."
Correspondance between Edmund F. O'Conner and David L. Christianson in which Edmund encloses three documents to David and expresses his gratitude for David's work on the history of the Saturn V program. -
"List of Technical Papers and Articles 1958 Through 1962."
This report contains information on technical writings by Amy Missile Command personnel other than the formal reports compiled in "List of Technical Documents Published During the Years 1958 Through 1962." -
"List of Technical Documents, Papers and Articles Published in 1967."
This report lists the technical reports, papers, and articles published by the Research and Development Directorate during 1967. -
"List of Equipment, Components, Materials, and/or Services Now Being Developed, Fabricated or Performed."
Lists of different parts of rockets.