UAH Archives, Special Collections, and Digital Initiatives

Browse Items (8239 total)

  • Sa-203.pdf.pdf

    The "Saturn Technical Information Handbook" provides up-to-date reference material to the Launch Operations Center personnel. This material shows the assembly and operation of the Saturn Vehicle components for systems analysis.; Volume II is available on the NASA Technical Reports Server (NTRS) as a PDF.
  • satutelesystforSA-6_032207094948.pdf

    The Saturn television system is an instrumentation device intended to provide visual information on vehicle performance in real time. The system covers the entire problem from the original image presented to the television camera to the presentation of the finished photographs for analyses.
  • SatVnsproclauvehgrosuppequip_042108143716.pdf

    The functions, authority, management relationships, and responsibilities of the Launch Vehicle Ground Support Equipment Project Office are described. Functions and examples of non-stage procured Launch Vehicle Ground Support Equipment (LVGSE) are described and illustrated.
  • satvamemooroc_013008120434.pdf

    Diagram that displays the Saturn V rocket with a page beneath detailing the function of each stage.
  • spc_stnv_000010.pdf

    Drawn by Don Sprague at the Huntsville Engineering section of Boeing.
  • satvapoflicon_060508122521.pdf

    Diagram displaying the internal rooms, pieces and functions of the Saturn V as well as the space-suits of the astronauts.
  • satvapollunorbitrend_050807104721.pdf

    Diagram explaining the process of a lunar mission from liftoff to recovery.
  • SatuVDeri_062308104520.pdf

    This paper desciibes an evolutionary family concept of !h turn V derivative launch vehicle systems, discusses their performance capabilities, and outlines their ability to perform orbital and hlgh-energy missions at minimum total program cost.
  • satuVfirsstagannuprogrepofiscyear1966_091207124644.pdf

    This report is the consolidation of D5-11994, "Quarterly Technical Progress Report," for the fourth fiscal quarter and the fiscal year 1966 Annual Progress Report and places special emphasis on activities on the fourth fiscal quarter.
  • spc_stnv_000066.pdf

    The report covers June 30, 1967 through June 27, 1968: Contract NAS8-5608, Schedules 1 and 1A, July 27, 1968. Prepared by J. P. Delaloye, Management Reporting and Analysis; Supervised by D. G. Valentine, Management Reporting and Analysis; Approved by R. F. Terry, Program Reports; D. H. Creim, Michoud, Program Planning and Reporting Manager; E. K. Cooper, S-IC Program Executive.