Browse Items (1965 total)
Sort by:
-
Skylab Blueprint "119706."
This blueprint depicts some of the life support systems of skylab, especially as related to temperature control. This blueprint also depicts storage, and food refrigeration, as well as food preparation spaces. -
Skylab "MSFC SKYLAB NEUTRAL BUOYANCY SIMULATOR" Technical MEMORANDUM.
This report describes the importance of the Neutral Buoyancy Simulator for preparing the Skylab astronauts to work in space. -
"Final Crew System Corollary Experiment Input to the Skylab Final Mission Evaluation Report."
This report describes the experiments onboard Skylab, what the data the experiments gather indicates, and the equipment that the experiments utilize. This includes the spider experiment. -
"MSFC SKYLAB CREW SYSTEMS MISSION EVALUATION."
This is a hardware evaluation and assessment of the skylab habitat systems based on the feedback from the Skylab crews. -
"Skylab 4 Systems Debrief Transcript."
This is a series of interviews with the crew of Skylab 4. The interviews focus on the onboard systems and equipment. -
"APOLLO TELESCOPE MOUNT SEQUENTIAL FLOW PLAN."
This is a manual that describes the handling and use of the Apollo Telescope Mount prior to launch. -
"JULY 11, 1979 1 HOUR REPORT."
This is a report about the Skylab 1 reentry. -
Skylab Impact Corridor Report.
This is a report about the Skylab debris field in Australia. -
"Skylab Experiments Volume 1 Physical Science, Solar Astronomy Information for Teachers."
This is a workbook for science teachers to create lesson plans around. -
Skylab Blueprint "119700."
This blueprint depicts a working space for the Skylab habitat, and includes work stations, and storage systems. This blueprint also depicts the water storage system for the Skylab habitat. -
"Skylab Mission Commentary 5/14/73 1:10 CST 18:04 GET 5:32 MC27/1" - "Skylab Mission Commentary 5/15/73 1:20 CST MC38/1."
This mission commentary depicts the initial discovery of Skylab 1's Orbital Workshop Solar arrays not deploying as intended. -
"Skylab Mission Commentary 5/14/73 1:10 CST 18:04 GET 5:32 MC27/1" - "Skylab Mission Commentary 5/15/73 1:20 CST MC38/1."
This mission commentary depicts NASA's attempts to alleviate some of the temperature issues caused by the broken micrometeoroid shield on Skylab 1. -
"SL II MC 1/1 Time: 6:32 a.m. CDT, T-01:25:00 GET 5/25/73" - "SL-II MC-11/3 Time: 08:01 A.M. CDT, T-1 minute Get 5/25/73."
This mission commentary depicts the Skylab 1 launch. -
"SL-II MC-60/1 Time: 22:50 CDT 14:50 GET 5/25/73" - "SL-II MC 64/1 Time: 01:25 CDT 17:25 GET 5/25/73."
This mission commentary depicts Skylab 2 docking with Skylab 1. This mission commentary also depicts the Skylab 2 crew beginning work on resolving the solar panel and micrometeoroid shield problems. -
"SL-II MC-64/2 Time: 01:25 CDT 17:25 GET 5/25/73" - "SL-II MC 75/2 Time: 10:17 a.m. CDT 1:02:17 GET 5/26/73."
This mission commentary depicts the improving temperature conditions on Skylab 1 following the Skylab 2 crew's efforts to resolve the temperature problems. -
"SL-II MC75/3 Time: 10:17 a.m. CDT, 1:02:17 GET 5/26/73" - "SL-II MC-79/3 Time: 11:24 a.m. CDT 1:03:24 GET 5/26/73."
This mission commentary depicts the Skylab 2 crew working to secure the fastening between the Skylab 2 command module and the Skylab 1 habitat. This mission commentary also depicts the Skylab II crew working on the life support systems. -
"SL-II MC-81/1 Time: 11:44 a.m. CDT, 1:03:44 GET 5/26/73" - "SL-II MC-88/1 Time: 1:34 p.m. CDT 1:05:34 GET 5/26/73."
This mission commentary depicts the Skylab 2 crew trying to resolve a low temperature problem in the scientific airlock. The commentary also depicts the Astronaut assessment of the Orbital Workshop high temperature problems. -
"SL-II MC-88/2 Time: 1:34 p.m. CDT, 1:05:34 GET 5/26/73" - "SL-II MC-96/1 Time: 15:13 p.m. CDT 1:07:13 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew carrying out maintenance on the life support systems. This mission commentary also depicts the Skylab 2 crew operating the Apollo Telescope Mount. -
"SL-II MC-97/1 Time: 3:23 p.m. CDT, 1:07:23 GET 5/26/73" - "SL-II MC-101/2 Time: 4:56 p.m. CDT 1:08:56 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew discussing the deployment of the parasol for the alleviation of temperature pressures. The Skylab 2 crew is also depicted making the preparations for the deployment of the solar parasol. -
"Time: 17:15 p.m. CDT, 1:09:15 GET SL-II MC102/1 5/26/73" - "SL-II MC-108/1 Time: 19:53 p.m. CDT 1:11:53 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew unpacking and assembling the solar parasol. The Skylab 2 crew is also depicted deploying the solar parasol. -
"SL-II MC-109/1 Time: 20:02 CDT 1:12:02 GET 5/26/73"-"SL-II MC-114/3 Time: 21:36 CDT 01:13:36 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew finishing their work on the solar parasol. This mission commentary also depicts the discussion between the Skylab 2 crew and ground control about the permanent move to habitation in the Orbital Workshop. -
"SL-II MC-114/4 Time: 21:36 CDT 01:13:36 GET 5/26/73" - "SL-II MC-117/4 Time: 23:47 CDT, 1:15:47 GET 5/27/73."
This mission commentary primarily depicts the Skylab 2 crew transitioning to permanent habitation in the Skylab 1 Orbital Workshop from the Skylab 2 Command module. -
"SL-II MC-616/1 Time: 20:41 CDT, 14:01:41 GMT 6/6/73" - "SL-II MC-630/1 Time: 07:57 CDT, 14:12:57 GMT 6/7/73."
This mission commentary primarily depicts the Skylab 2 crew working on, and maintaining the Apollo Telescope Mount systems. -
"SL-III MC-1/1 Time: 05:01 CDT 09:10 GMT 7/28/73" - "SL-III MC-10/4 Time:06:08 CDT 09:11:08 GMT 7/8/73."
This mission commentary describes the Skylab 3 launch. -
"The Skylab Student Project."
Students involved in the student experiment selection are: Bochsler, Daniel C., Converse, Vincent W., Crites, Troy A., Dunlap, W. Brian, Hamilton, John C., Hopfield, Alison, Jackson, Kathy L., Johnston, Roger G., Leventhal, Jeanne L., Meister, Todd A., Miles, Judith S., Peltz, Cheryl A., Quist, Terry C., Reihs, Joe W., Schlack, Donald W., Wordekemper, Joel G., Shannon, Neal W., Staehle, Robert L., Zmolek, Joe B. Students whose experiments were held in consideration for future programs are Stein, Keith L., Brandt, Kent M., McGee, Keith, Sherhart, Kirk M., Merkel, Gregory A., Healy, James E. -
"Request for approval to man the Apollo Saturn V Vehicle."
The purpose of this memorandum is to obtaln your approval to fly manned missions on the Saturn V launch vehicle beginning with Apollo-Saturn vehicle #503 currently scheduled for launch in December 1968. -
Press Kit: Project Apollo 6 (To be launched on or after Apr. 3).
The document is a press kit for the Apollo 6 news release on Thursday morning, March 28, 1968. The topics of the release include but are not limited to Apollo 4, Apollo 6, Saturn V launch vehicle, spacecraft cameras, launch events, the flight profle, mission summary, and program managment. -
"Listing of Historical Documents and Interview Tapes."
Archive copy is a poor photocopy.; Handwritten on the first page is "10/25/67".; Includes a letter dated Nov. 6, 1968 to Mr. Christensen from William D. Putnam. -
"Women at Work in NASA."
This NASA Technical Memorandum highlights women working in technical support, clerical and nonprofessional administrative roles, professional administrative roles, and professional scientific and engineering roles at NASA Centers. -
Apollo 5 press kit.
For release Thursday P.M., January 11, 1968. -
"Saturn Apollo applications program specification."
This first issue contains only some general provisions for the program and its requirements for the Saturn 1B launch vehicle. -
"Program scheduling manual."
Manual centered around teaching program schedueling. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 4."
OMSF Program Status Review October 1965. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 6."
OMSF Program Status Review October 1965. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 2."
OMSF Program Status Review October 1965. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 6, various locations."
OMSF Program Status Review August 1965.; Edition "A"