![UAH Archives, Special Collections, and Digital Initiatives](http://libarchstor2.uah.edu/digitalcollections/files/theme_uploads/881ce3c218c039cbfb10db85af3759d6.png)
Browse Items (1965 total)
Sort by:
-
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 10.
The document is Volume 1, Section 10 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 11.
The document is Volume 1, Section 11 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 12.
The document is Volume 1, Section 12 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 13.
The document is Volume 1, Section 13 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 14.
The document is Volume 1, Section 14 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 15.
The document is Volume 1, Section 15 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 16.
The document is Volume 1, Section 16 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 17.
The document is Volume 1, Section 17 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 18.
The document is Volume 1, Section 18 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 19.
The document is Volume 1, Section 19 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 20.
The document is Volume 1, Section 20 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
"Timing and countdown systems handbook."
The purposes of this handbook are to present the John F. Kennedy Space Center (KSC) Timing and Countdown Systems Operations Plan, to provide a description of the systems in use, to familiarize personnel engaged in space vehicle checkout and launch operations with available KSC timing and countdown services and to show how these services may be obtained. -
"Apollo/Saturn consolidated instrumentation plan for AS-204/LM-1."
This report represents the consolidated instrumentation plan for employing optical and electronic data acquisition systems to monitor the performance and trajectory of the Apollo/Saturn 1B vehicle, AS-2 04/LM-1, during powered flight. Telemetry and electronic tracking equipment on board the vehicle, and data acquisition systems monitoring the flight are discussed. Flight safety instrumentation and vehicle data transmission are described, and geophysical information is provided. This plan reflects the general instrumentation coverage requirements set forth in the NASA Program Support Requirements Document (PSRD) for Apollo/Saturn 16, and the commitments of Eastern Test Range (ETR) Operations Directive (OD) No. 4206,dated 15 August 1967. This plan is not intended to conflict with or to supersede either document. The information presented in this document reflects planning concepts developed prior to October 1, 1967. -
"KSC Apollo/Saturn V Master Test Plan."
The John F. Kennedy Space Center (KSC) Apollo/Saturn V Development/Operations Plan, K-PM-0, establislies the requirement for an Apollo/Saturn V Master Test Plan (MBP). This document, prepared by the Saturn Systems Office. -
"Launch Complex 34 Facilities Fact Sheet 05."
Article detailing the different aspects of the Launch Complex 34 facilities. -
"Launch Complex 37 Facilities Fact Sheet."
Article detailing the different aspects of the Launch Complex 34 facilities. -
"Launch Complex 39 Facilities Fact Sheet 03."
Article detailing the different aspects of the Launch Complex 34 facilities. -
"John F. Kennedy Space Center: A Selective Bibliography."
This is primarily the bibliography of an organization located in an area which was once inhabited by more beasts and birds than people. The evolution of the Kennedy Space Center cea be traced from the Army Ballistic Missile Agency and Marshall Space Flight Center, Huntsville, Alabama. That period is fully covered by Historical Origins of NASA's Launch Operations Center to July 1, 1962. -
The "Apollo/Saturn Data Handbook."
According to the preface, "This handbook provides KSC management personnel with general information relative to the Apollo-Saturn program. Emphasis is placed on Saturn launch facilities and related support equipment. Saturn vehicle parameters are included for general information. -
"A summary of major NASA launchings" between October 1st and December 31st, 1968.
This is the first Quarterly Supplement to the October 1968 edition of GP 381, ''A Summary of Major NASA Launchings (Eastern Test Range and Western Test Range)." This Supplement covers the period from October 1 to December 31, 1968. Two additional Quarterly Supplements will be issued during 1969. Each of these will list those major NASA launchings occurring during the three-month period it covers. The basic publication will be revised and reissued, incorporating the information contained in the Supplements, as well as covering the final three-month period, subsequent to October 1, 1969. William A. Lockyer, Jr. -
"Report to the Congress from the President of the United States"
A report to Congress from White House regarding the accomplishments of NASA. -
Letter from T. Earle Johnson to the University of Alabama faculty.
The letter concerns "the Commencement Excercises scheduled for Saturday and Sunday, May 30 and 31." It provides information about the times and places of the ceremonies and processions and reminds the faculty that their participation is required. -
"Plat of Monte Sano."
Drawn for James F. O'Shaughnessy, the map shows the Monte Sano Hotel, the community of Viduta, Laura's View and Laura's View Station, and natural features of the mountain, such as Chalybeate Spring and Natural Well. The map also features names of property owners O'Shaughnessy, J. R. Stevens, Mrs. M. W. Wells, Milton Humes, and W. J. Pulley. -
Space vehicles for the peaceful exploration of the inner solar system; Memorandum to Mr. K. K. Dannenberg from Joe M. Jones.
Review of speech to be presented in Tampa, FL. Speech included references to slides. -
1966 Chronology of Marshall Space Flight Center.
This draft copy of the chronology includes a memorandum from Marshall Historian L. L. Jones of the Historical Office. -
Telegram to Robert K. Bell from Bob Jones.
Jones sent this telegram in reponse to Bell's March 11th letter requesting information for the Nickerson case. He informs Bell that the information cannot be sent to him but may be purchased in a 15 volume book set. -
Letter to Robert K. Bell from Robert E. Jones.
Bob Jones writes to Bell to congratulate him on the "splendid work" he did on the Nickerson case. -
Letter and draft of letter to Robert K. Bell and Ray H. Jenkins from Stanely W. Jones.
Jones writes to Bell and Jenkins in response to their letter of April 13, 1957 to the Deputy Chief of Staff for Intelligence, Department of the Army. With an oral request, the defense counsel had requested for the drop of Specification 1, Charge II. Jones states that as soon as a decision is made the convening authority will advise them of it. -
"Space flight : first draft."
Appears to be a rough dfraft with editorial comments and revision notes. Includes references to figures and tables.; Page 31 is missing. Pages 37 through 44 do not exist; there is a note about this on page 36. Page 67 also does not exist. -
"Saturn V S-IC stage engine gimbal actuation system."
The actuation system for the Saturn V S-IC stage is described and compared to the Saturn I system. The use of mechanical feedback actuators that result in a significant increase in system reliability and the damping of load resonance is discussed. The unprecedented component sizes and system requirements are cited. -
"Saturn V S-IC stage engine gimbal actuation system."
The actuation system for the Saturn V S-IC stage is described and compared to the Saturn I system. The use of mechanical feedback actuators that result in a significant increase in system reliability and the damping of load resonance is discussed. The unprecedented component sizes and system requirements are cited. -
"Saturn I engine gimbal and thrust vector control systems."
The hydraulic systems for the two-stage block II Saturn I vehicle are described with the evolution of their development. -
"Redundancy employing majority voting for a Saturn servoactuator."
R-ASTR-NF.; ABSTRACT: The servoactuator was developed to improve the reliability of the Saturn S-IVB thrust vector control system by insuring continued system operation if single point failures occur. The selection of the majority voting technique is discussed. Its simplicity is cited along with the advantages of minimum weight, size, power consumption, and compatibility with existing control electronics. Operational features, design mechanization, and the analysis of test results are covered. -
"The Development of Servovalves with Improved Reliability for Space Vehicles."
Considerations for improvement in the reliability of the Saturn engine gimbal servosystems are briefly covered. The Saturn I servovalves operate with increased electrical input power. The Saturn V vehicle stages will use mechanical feedback actuators with increased electrical input power, larger orifices and nozzle sizes, larger torque motor wire size, and greater spool driving forces. -
DX priority: memorandum.
Memorandum discussing the priorization of various nlunar landing vehicle projects. -
"John F. Kennedy Space Center: A Selective Bibliography."
This is primarily the bibliography of an organization located in an area which was once inhabited by more baasts and birds than people. The evolution of the Kennedy Space Center :LS :A .ceable from the Army Ballistic Missile Agency and Marshall Space Flight Center, Huntsville, Alabama. That period is fully covered by Historical Origins of NRSB's Launch epesons Center to July 1, 1962. However, because of the core working relationship between the Kennedy Space Center and the Air Force Eastern Test Range articies showing evolution of the Air Force Missile Test Center are included. -
"Memorandum for the Vice President from (John F. Kennedy)."
Memorandum from John F. Kennedy to the vice president, wanting to put him in charge of the survey recording their actions in space. -
"Letter to Dr. Wernher von Braun."
This letter asks for an oral history interview from von Braun concerning his conversations and visits with President John F. Kennedy.; Archive copy is a very poor copy. -
"Plastics in space flight programs."
Article aimed at improving the NASA's ability to complete its projects."