UAH Archives, Special Collections, and Digital Initiatives

Browse Items (970 total)

  • ThermalModels_081108112916.pdf

    One of the orange Aid Preprint Series in Nuclear Astrophysics by W. B. Hubbard, California Institute of Technology, Pasadena, California.; Argues that the Saturnian models are flawed as their predictions do not line up with detected gravitational events.
  • chrysatustory_062707124831.pdf

    The document is a booklet created as part of the NASA/Chrysler Corporation Space Division manned flight awareness program. It discusses Chrysler's role in manufacturing and testing the Saturn and includes photographs and diagrams of Saturn stages, operations at Michoud, testing, and future missions. The section headings included in this booklet are "Chrysler and the Saturn," "Saturn at Michoud," "The Voyage of Saturn," "Saturn Firings," and "Saturn's Missions."
  • timiandcounsysthand_073107142319.pdf

    The purposes of this handbook are to present the John F. Kennedy Space Center (KSC) Timing and Countdown Systems Operations Plan, to provide a description of the systems in use, to familiarize personnel engaged in space vehicle checkout and launch operations with available KSC timing and countdown services and to show how these services may be obtained.
  • tofstatsenainvecommdevenikesyst_031607135646.pdf

    Narrative report of general H.N. Toftoy - Informal interview with Mr. Robert E. Dunne, Assistant Counsel of the Senate Permanent Investigating Subcommittee, in the presence of Mr. P. K. Schaeppi.
  • Toolandengibran_051410112851.pdf

    Report list detailing the state of manufacturing plans as either "Rough" or "Final" drafts.
  • tooforaerapp_060707142010.pdf

    Presented to the American Ordnance Association. A presentation on Saturn S-IC Tooling in order to demonstrate the trend towards larger tooling support. Focuses on the tank-structures primarily.
  • Trandougsatusicbstag_082007093936.pdf

    Presented to the American Society of Civil Engineers by R. W. Prentice, manager, Saturn Logistics Support, Douglas Aircraft Company Inc., Missile & Space Systems Division, Space Systems Center, Huntington Beach, California. This paper describes the significant events and equipment associated with transporting the Douglas Aircraft Company, Inc., built Saturn S-IVB stage from stage fabrication at Huntington Beach, California, to the Sacramento Test Center and to the Kennedy Space Center. Descriptions and illustrations of the transportation vehicles and major ground support and instrumentation equipment are presented for a more comprehensive understanding of the transportation problem.
  • Trendsinprocurement_022808140424.pdf

    Speech delivered by Garland G. Buckner to the National Contract Management Association, Huntsville Chapter. Discusses the outdated procurement process, how its changing and how to track the trends of how its changing.
  • usaerospprog_081607135439.pdf

    The document contains four charts labeled "Investigation", "Exploration", "Utilization", and "Control". Each chart is organized chronologically, contains drawings of U.S. Aerospace Program Projects, and incudes written descriptions of each project.
  • scan0022rev_080107141349.jpg

    8 x 10 inch black and white photograph which displays an image that includes the plate, bar and the magnification of the bar to display its molecules.