UAH Archives, Special Collections, and Digital Initiatives

Browse Items (970 total)

  • StruoftheNASA_052410122627.pdf

    Describes the structure and function of each part of the NASA Lunar Module
  • survofsatustagtest.pdf

    This survey of the Saturn Stage Test and Checkout Computer Program Development contains a summary description of the systems developed for factory and static test of the stages of the SATURN IB and SATURN V Vehicles. The responsibilities of the MSFC and stage contractor organizations that are involved in test and checkout computer program development are briefly described. The test and checkout hardware and software (computer program) systems are given for each stage and for each site where tests are conducted. The systems and procedures that are used for program production verification, documentation, and change control required for the implementation of planned computer programs are included. Notes are included in the report to indicate what material is missing or incomplete. No attempt has been made to draw any conclusions regarding the automatic test and checkout systems being developed for each stage and the manner in which the efforts are organized, scheduled, and implemented. This document has been based on material provided by stage contractors and by components of MSFC through May 1, 1966. COMPUTER SYSTEMS SECTION. VEHICLE SYSTEMS INTEGRATION BRANCH. VEHICLE SYSTEMS CHECKOUT DIVISION.; SR-QUAL-66-3.
  • systdescforsatuvehicle_030807135800.pdf

    Missing pages iv, 3, 6 to 8. Photocopy of files containing sections of the project.
  • systengrprop.pdf

    Page numbering is inconsistent; there are no pages numbered 14 - 17. Some pages have handwritten numbers, others have no numbers at all.; The print quality of many pages is poor. Discusses the definition and function of propulsion as well as how to most effectively employ it .
  • Systsafehand_022008152101.pdf

    The testing of a hardware system consists of' subjecting it to carefully controlled operating conditions for the purpose of demonstrating that this system performs its function properly.
  • Systappl_122007135157.pdf

    The objective is to examine the technical requirements and feasibility of conducting orbital launch operations with systems now in the development phase. In order to maintain realistic constraints on the analysis, the Saturn S-IVB stage has been used as an example of present stage technology. The requirements, procedures and complexity of operations for orbital assembly and launch are discussed. The primary design requirement for orbital assembly and launch operations is increased orbital stay time (from hours to days or weeks).
  • scan0012rev_041708161431.jpg

    8 x 10 inch black and white photograph of a table reperesenting the chemical composition of alloys M825 and M826.
  • scan0013rev_080107121233.jpg

    8 x 10 inch black and white photograph of a table comparing the tensile strength of each alloy in relation to a desired goal.
  • scan0014rev_080107121609.jpg

    8 x 10 inch black and white photograph of a graph displaying different alloys and comparing their 'nominal composition weight per cent' to one another.
  • scan0015rev_080107121909.jpg

    8 x 10 inch black and white photograph of a table detailing the tensile strength, tensile yeild, elongation per cent and charpy impact of alloys.