UAH Archives, Special Collections, and Digital Initiatives

Browse Items (970 total)

  • Memoformrwebb_120208112012.pdf

    Memorandum discussing a review of the data of the Apollo 5 flight.
  • Memothompain_040109092311.pdf

    Memorandum containing a recommendation from General Phillips to continue with the lunar orbit flight scheduled for December.
  • letfrogeoemueassadmformanspaflitomrjlatwprenorameaviinc_020408134617.pdf

    Letter to J. L. Atwood from George M. Mueller regarding the S-II stage.
  • Nasamanaprog_120408111255.pdf

    Address by Dr. George E. Mueller, Associate Administrator for Manned Space Flight, National Aeronautics and Space Administration before the Ninth National Conference of United Press International Editors and Publishers, October 8, 1968.
  • Nasamanaprog_011509091310.pdf

    Address by Dr. George E. Mueller, Associate Administrator for Manned Space Flight, National Aeronautics and Space Administration; Joint AIAA/CASI Meeting, Montreal, Canada, July 8, 1968. AS DELIVERED.; Includes charts.
  • dynaenvioftheS-IVandS-IVBsatuvehi_062007110209.pdf

    The vibration and acoustic environments of the S-IV and S-IVB Stages of the Saturn vehicle are summarized. A brief review of techniques used to predict the dynamic environments of the S-IV and S-IVB vehicles is presented. This review includes discussions on the prediction of rocket exhaust noise, boundary layer noise, sinusoidal vibrations, and random vibrations for the S-IV and S-IVB vehicles. In addition, sine-random vibration conversions are given.
  • Thetoughestweldofall_061908141303.pdf

    Article explores the outer layer of the Saturn S-II along side its benefits and complications. Contains poorly rendered images displaying the process.
  • Mscapolprog.pdf

    The purpose of this document is to describe how the Manned Spacecraft Center is managing its responsibilities in the Apollo Program The organization, procedures, and management philosophy described herein, represent the accumulated knowledge gained from our experience with the Mercury, Gemini, and Apollo Programs. It should be remembered, however, that managing a research and development program of Apollo's size and complexity, is an experimental "R&D" process in itself.
  • pdf_043008093902.pdf

    The flrst flight test of the Apollo/Saturn V space vehicle is scheduled for launch from the Natlonal Aeronautics and Space Administration's John F, Kennedy Space Center, Fla., no earlier than Nov. 7. The mission is designated Apollo 4.
  • survofsatustagtest.pdf

    This survey of the Saturn Stage Test and Checkout Computer Program Development contains a summary description of the systems developed for factory and static test of the stages of the SATURN IB and SATURN V Vehicles. The responsibilities of the MSFC and stage contractor organizations that are involved in test and checkout computer program development are briefly described. The test and checkout hardware and software (computer program) systems are given for each stage and for each site where tests are conducted. The systems and procedures that are used for program production verification, documentation, and change control required for the implementation of planned computer programs are included. Notes are included in the report to indicate what material is missing or incomplete. No attempt has been made to draw any conclusions regarding the automatic test and checkout systems being developed for each stage and the manner in which the efforts are organized, scheduled, and implemented. This document has been based on material provided by stage contractors and by components of MSFC through May 1, 1966. COMPUTER SYSTEMS SECTION. VEHICLE SYSTEMS INTEGRATION BRANCH. VEHICLE SYSTEMS CHECKOUT DIVISION.; SR-QUAL-66-3.