"Saturn IB : presentation to Little Rock Group."
Speech by H.D. Lowrey, SAE Meeting, Detroit, Michigan. Focuses on the Apollo project, the technology involved and what the goals of the project are. -
"The Saturn IB launch vehicle system."
Speech containing information regarding Crystler's role in the Saturn Project as contracted builders of the stages of three space vehicles. -
"Satellite recovery system."
Report focusing on the problems of the satalite recovery system and the possible solutions for those problems. -
"Annual progress report :1966-1967."
The Annual Progress Report from July 1st, 1966 through June 30thm 1967. -
"Safety engineering for the man."
Presented at Safety Engineering of Missile/Space Systems, 53rd Air Force - Industry Conference, detailing potential safety issues within the Atlas weapon system. -
"SAA program specification - case 218."
Memo sent to Major General D. M. Jones - NASA/ML. -
"S-IVB Saturn high energy upper stage and its development."
The development of carrier rockets For manned space missions has been one of the major activities in the aerospace field during the past decade. The early space efforts were made possible by the existence of large ballistics missiles. It soon became obvious that the delivery of weapons and the launch of large spacecraft could not be combined into one operational system in an efficient way; therefore, a family of spacecraft boosters had to be created. -
"Security classification review of Saturn I/IB quarterly film report, no. 25."
Memo to Mr. Lee Cropp, I-RM-D. -
"Security classification review of Saturn I/IB quarterly film report, no. 25."
Memo to Mr. Lee Cropp informing that the subject film report was reviewed for security classification. -
"Saturn I/IB quarterly film report no. 25."
Memo gives dates and times of the interlock for final I.O. approval. -
"Saturn I workshop, 1969."
The Workshop project calls for changing a spent Saturn S-IVB propulsion stage into. living and working quarters after it has propelled itself into space. -
"Saturn I workshop, 1968."
The Workshop project calls 'for changing a spent Saturn S-IVB propulsion stage into a living area after it has propelled itself into space. -
"Saturn I summary."
Summary of the history of the Saturn 1, its missions and its construction. -
"Saturn instrumentation systems."
Paper to be presented at the Third International Flight Test Instrumentation Symposium College of Aeronautics. A brief description of the Saturn vehicles is given, delineating the makeup of and differences between the Saturn I, Saturn IB, and Saturn V. -
"Saturn illustrated chronology : April 1957 - August 1963."
A list of images with detailed descriptions of what they are and their histories. -
"Saturn I/IB Launch Vehicle Operational Status and Experience."
6Aeronautic and Space Engineering and Manufacturing Meeting, Los Angeles, California. -
"Saturn I flight test evaluation."
Speech to be delivered to Joint AIAA/ASME Student Chapters Meeting, University of Tennessee, Knoxville, Tennessee. Speech focusing on their future endeavors and missions into space. -
"Saturn I : the first generation of heavy launch vehicles designed for peaceful exploration of space."
A basic description of the Saturn rockets alongside diagrams for context. -
"Saturn I engine gimbal and thrust vector control systems."
The hydraulic systems for the two-stage block II Saturn I vehicle are described with the evolution of their development. -
"Saturn IB - Saturn V instrument unit technical facts."
Press release detailing the technical aspects of the Saturn IB. -
"Saturn IB news reference."
Images, decriptions, graphics and explanations of the various Saturn rockets. -
Saturn IB launch project development plan.
This document is an official release of Manned Space Flight and its requirements shall be implemented by all cognizant elements of Manned Space Flight Program. William Teir, Manager, Saturn IB Program; E. F. O'Connor, Director, Industrial Operations; Wernher Von Braun, Director, Marshall Space Flight Center; Samuel C. Phillips, Director, Apollo Program. -
"Saturn IB ESE interlock system."
The results of an OMSF AS-201 Interlock and RCA 110A Computer Review were published. Recognizing that this was a "quick look", it was determined that a more detailed approach should be taken with respect to interlocks for the duration of the Saturn IB-V program. -
"Saturn history documentation: subject index."
This document explains the handwritten numbers on each document.; On spine is the title "Saturn history subject categories." -
"Saturn and the Gulf Coast."
Presentation about the Saturn program and its purpose in the gulf coast. -
"Saturn: draft."
Report on the history of the Saturn program. -
"Saturn display set: instruction manual."
The manual comprises a multi-volume set, the contents of which are as follows: VOLUME 1 -- a. Chapter 1 contains a general description of the equipment and its purpose, the physical and functional characteristics, and other pertinent data. b. Chapter 2 describes and illustrates the display set installation considerations. c. Chapter 3 lists and illustrates all operating controls and indicators. Chapter 3 also contains normal and emergency operating instructions. -
"Saturn data summary handbook."
This handbook provides a technical data summary for the Douglas-produced Saturn S-IV and S-IVB stages of the NASA Apollo Program. Material contained in the S-IVB stage of this handbook includes the S-IB and S-V vehicles. This book will be updated as changes and additional information become available. The appendix contains aerospace fluid characteristics, LOX and LH2 vapor pressure curves and a list of non-standard abbreviations. -
"Section III of Saturn C-1 vehicle project development plan."
Plan for the development and construction of the Saturn C-1 vehicle. -
"Saturn C-1 vehicle project development plan."
The Saturn C-1 space vehicle system is being developed by government agencies at industrial firms under the direction of the National Aeronotics and Space Division -
"Saturn ascending phase guidance and control techniques."
Lunar Missions Meeting, July 17-19, 1962. Focuses on the guidence concept under development at the Marshall Space Flight Center -
"Saturn/Apollo contract change : letter from George E. Mueller to Morton E. Henig."
Correspondence letter detailing Mueller's concerns regarding potential issues in the design of the Saturn stages. -
"Saturn Apollo applications program specification."
This first issue contains only some general provisions for the program and its requirements for the Saturn 1B launch vehicle. -
"Saturn and the NASA space program."
Given at the Birmingham Chapter National Defense Transportation Association. Focuses chiefly on moon-missions. -
"Saturn S-IV engines."
Folder of information. -
"Saturn S-IVB quarterly technical progress report."
Douglas Aircraft Company Report DAC-56445, Saturn S-IVB Quarterly Technical Progress Report, covers design and development progress on the Saturn IB and Saturn V configurations of the S-IVB stage during August and September 1966. This report is prepared for the National Aeronautics and Space Administration under Contract NAS7-101. -
"Saturn S-II ground support equipment inspection manual."
This publication has been prepared to provide preliminary inspection requirements and limitations on all ground support equipment to support the Saturn II stage of the Saturn V launch vehicle. -
"Saturn S-II general manual."
This manual contains information covering the second stage of the Saturn V launch vehicle. -
"Saturn S-IC annual progress report, 1965."
This Annual Progress Report has been prepared by the Boeing Company to fulfill the requirement under Article XXX, Paragraph A and C, Modification 100 of Contract, NAS8-5608 as amended by NASA letter I-MICH-DB, dated May 19, 1965, B. H. Aldridge to E. S. Olason. Subject: Change of NAS8-5608 to incorporate Quarterly Technical Progress into the Annual Progress Report. -
"Saturn S-IC annual progress report, 1964."
This report encompasses the progress made by The Boeing Company on the Saturn S-IC Program for the fiscal year 1964 (From July 1, 1963 through July 2, 1964). The main objective of this report is to serve as an historical presentation stressing Boeing accomplishments and present capabilities under Contract NAS8-5608.