Browse Items (2178 total)
Sort by:
-
Von Braun, Wernher, Interview Outline.
An outline of an interview with Wernher von Braun. -
"Management Plan for Saturn Vehicle System."
The purpose of this management plan is to set forth the channels 1 and methods used by the National Aeronautics and Space Administration for the development of the SATURN Vehicle System, This plan is based i on past experience and proven management principles of the Development Operations Division, The attached figures illustrate the plan. -
"Maintenance Data - How and What."
This presentation is concerned with how maintenance data can be collected, what can be done with it and possible a few arguments why it should be of any concern. -
"List of Equipment, Components, Materials, and/or Services Now Being Developed, Fabricated or Performed."
Lists of different parts of rockets. -
"Marshall Space Flight Center personnel for potential interviews."
Photocopy. A collection of interviews and biographical data. -
"Michoud operations : historical operations: July 1, 1963 - December 31, 1963."
Historical report from July 1st to December 31st. -
"MSFC technical facilities history and description."
This document includes a brief history of MSFC facilities, defunct names used by various Redstone located missile organizations, Michoud facilities history, the Slidell Operations Office history, the Mississippi Test Facility (MTF) history, and detailed description of technical facilities for the MSFC R&D Laboratories. The final section presents a detailed breakdown of property and facility values for various MSFC facilities over a period of time. -
"MSFC project descriptions : 1967."
A directory of different projects with descriptions underneath. -
"Press release 931A : Saturn S-IV first firing."
Following is text of Douglas release on successful first firing of clustered P&W RL10 engines. Occurred at 11:12 A.M. PDT, August 17. Santa Monica, California.; "Sacramento, Calif,--Man's effort to reach the moon moved nearer reality today with the successful first firing here of the six liquid oxygen-liquid hydrogen fueled engines of the Saturn S-IV. -
"Reliability engineering program provisions for Space System contractors. Revision 2."
This document was cited in the Saturn contracts before NPC-250-1 was written. The sense of this document is the backbone of NASA reliability today and has become a generally accepted element of engineering rationale.