UAH Archives, Special Collections, and Digital Initiatives

Browse Items (71 total)

  • qtrlyrpt23_082707102252.pdf

    Memo to Mr. Lee Cropp indicating that 'the film' had been reviewed and was deemed to contain no classified information.
  • loc_hilt_0000001_0000005a.pdf

    The timeline includes a memorandum from Friedjof A. Speer, manager of the Missions Operations Office, to employees of Marshall Space Flight Center. Speer notes that "astronaut Neil Armstrong is scheduled to be the first man to step onto the moon's surface." The timeline outlines the entire mission from liftoff at 8:32 AM on Wednesday, July 16, 1969 to splashdown at 11:49 AM on Thursday, July 24, 1969.
  • techfaci&equi.pdf

    This document portrays the capability of technical facilities and equipment at the George C, Marshall Space Flight Center (MSFC) , one of three basic field centers under the NASA Office of Manned Space Flight.
  • firannlogmansymsep13and141966.pdf

    The proceedings of the First Annual Logistics Management Symposium are forwarded with the hope that the information will be of assistance to attendees and their staffs in the planning and management of logistics support programs. I recognize that there is still much study required before all management techniques and procedures for support programs are known and understood, but I believe that support problems are made easier by exchange of knowledge. The Symposium was based on this belief and we plan to continue the search for ways to achieve better program support at a lower cost. Edmund F. O'Connor, Director, Industrial Operations.
  • Scieandtech.pdf.pdf

    This publication contains the Marshal Space Flight Center contribution at the Science and Technology Advisory Committee (STAG) at the Manned Spacecraft Center.
  • spavehsysrtpprosubfy1968.pdf

    A collection of various graphs, resumes and recordings for space vehical systems.
  • techinfosummconcsatuvehsa3_031607143540.pdf

    This memorandum outlines, through a series of sketches, some of the important features and sequences concerning the third SATURN flight vehicle. The sketches are devoted primarily to the control and instrumentation aspects of the vehicle but also touch on the launch facility and countdown schedule.
  • techinfosummconcsatuvehsa3_031607143540.pdf

    This memorandum outlines, through a series of sketches, some of the important features and sequences concerning the third SATURN flight vehicle. The sketches are devoted primarily to the control and instrumentation aspects of the vehicle but also touch on the launch facility and countdown schedule.
  • Memomrhorn_120108135158.pdf

    Memorandum discussing possibilities of obtaining or reallocating funding to speed up the 'super booster' program.
  • Fabrofplentankbyexplformandelecbeamweld_111507104932.pdf

    This report presents the results of a program initiated to study the use of explosive forming and electron beam fusion welding techniques in the fabrication of pressurized cryogenic materials containers. Using these techniques, vessels were successfully formed from 304 stainless steel and X7106 aluminum alloy in the T63 condition.; Manufacturing Research and Technology Division.; Manufacturing Engineering Laboratory.; Research and Development Operations.
Output Formats

atom, csv, dc-rdf, dcmes-xml, json, omeka-xml, rss2