Projected by D.L. Christiansen, DLC- 5/2/69-Memo.; Search control No. 015416.; For Scientific and Technical Information, Cameron Station, Alexandria, Virginia.; Unclassified.; Pages in this bibliography are not numbered.
Unclassified control No. 015415.; Requested by D.L. Christensen, DLC-5/2/69-Memo for Scientific and Technical Information, Cameron Station, Alexandria.
Includes a letter to David L. Christensen, Research Institute, University of Alabama, Huntsville, Alabama from James Neely, dated March 18, 1969, with the subject line, "Technical paper entitled 'Start Transient Investigation of the Rocketdyne J-2 engine at Simulated Altitude Conditions.' " The bibliography of all AEDC J-2 engine test reports between July 1966 and Octoebr 1968 is attached.
A list of the various contractors over $700,000 involved in the Saturn V production process, in addition to contract numbers and addresses. Archive copy is a photocopy. There are some handwritten notes in ink on some of the pages.