Browse Items (116 total)
Sort by:
-
Space Business Daily, January 6, 1966.
This is Vol. 24, No. 4 of Space Business Daily, a Space Publications newsletter. Topics include the search for a space chaff dispensing system, NASA's Earth-Space-Survery program plans, Lockheed joins reuseable space transport study as the second contractor, studies for how to improve the Saturn launch vehicles, and DOD and NASA grants, contracts, and negotiations. -
Space Business Daily, January 7, 1966.
This is Vol. 24, No. 5 of Space Business Daily, a Space Publications newsletter. Topics include the upcoming selection of 15 new astronauts, an analytical review of the 1967 NASA budget, the Apollo program and the Apollo Applications program, an experimental profile for a manned lunar orbital mission, the planned study of space-oceanography feasibility, the preliminary design model of Philco's automated biological laboratory, contract finances and changes, a proposed contract for an electromagnetic interference study, and DOD and NASA contracts. -
Space Business Daily, January 10, 1966.
This is Vol. 24, No. 6 of Space Business Daily, a Space Publications newsletter. Topics include the development of a control system for Minuteman missile systems, solar cells needed for a solar satellite monitoring mission, various planned programs, the possible deferment of the Apollo lunar landing target date, potential tax increase plans are considered to fund the Vietnam War and the Great Society program, Saturn configurations under study, upcoming meetings and conferences, topics on future space business, and DOD and NASA contracts and negotiations. -
Space Business Daily, January 11, 1966.
This is Vol. 24, No. 7 of Space Business Daily, a Space Publications newsletter. Topics include the France-Israel missile collaboration, the turning over of portions of the Apollo Applications program to various government agencies, the proposed expanded family of Saturn vehicles, additional analysis of re-entry systems begin, budget changes/requests and federal spending information, NASA grants, and various topics on Future Space Business. -
Space Business Daily, January 12, 1966.
This is Vol. 24, No. 8 of Space Business Daily, a Space Publications newsletter. Topics include studies into space-geology/hydrology feasibility, ComSat plans of an air traffic satellite to be sent into orbit to help control commercial aircraft traffic, personnel changes and financial information, various studies such as radiation at certain altitudes and new computers, and DOD and NASA contracts and negotiations. -
Space Business Daily, January 13, 1966.
This is Vol. 24, No. 9 of Space Business Daily, a Space Publications newsletter. Topics include scheduled hearings on the communications satellite program, a potential trip of NASA personnel to Europe to conduct business regarding the US/Euopean space cooperation program, the development and construction of various space-related tracking stations, sounding rocket payloads, and more, topics on Future Space Business, and DOD and NASA contracts. -
Space Business Daily, January 14, 1966.
This is Vol. 24, No. 10 of Space Business Daily, a Space Publications newsletter. Topics include an analysis of the National Space Program, study areas in the Apollo Applications remote sensor program, the Aerospace Medical Division's plan for a guide to space law to be used as a basic reference for all space agencies, various contracts awarded, the delivery of the first Apollo TV camera, a warning of a possible Soviet breakthrough in missile defense, the Saturn IB launch vehicle's readiness, and DOD and NASA contracts and negotiations. -
Space Business Daily, January 17, 1966.
This is Vol. 24, No. 11 of Space Business Daily, a Space Publications newsletter. Topics include the Apollo Applications experiment integration contracts request for proposals, the search for a data relay satellite network, the upcoming study of Army complexes' vulnerability to Anti-Radiation Missiles, various personnel changes and financial information, the recommendation for a post-Apollo space program, priorities for lunar and planetary exploration, and DOD and NASA contracts and negotiations. -
Space Business Daily, January 18, 1966.
This is Vol. 24, No. 12 of Space Business Daily, a Space Publications newsletter. Topics include the continued search for a data relay satellite network, the conclusion of the High-Boost Experiment test program, the success of the static test firing of Lockheed-Propulsion's second stage solid rocket motor, the delivery of the HL-10 lifting body, various personnel changes and agency reorganization, recommendations for a post-Apollo space program, economic and financial changes and impacts, and DOD and NASA contracts and negotiations. -
Space Business Daily, January 19, 1966.
This is Vol. 24, No. 13 of Space Business Daily, a Space Publications newsletter. Topics include the termination of the High-Boost Experiment program, upcoming hearings of NASA's plans for Voyager, expanded efforts of space-related areas into the field of oceanography, the delay of the MOL program by one year, the first four Apollo Applications experiments are defined, the final part of recommendations of a post-Apollo space program, topics on Future Space Business, the investigation of anti-air warfare systems, and DOD and NASA contracts and negotiations. -
Space Business Daily, January 20, 1966.
This is Vol. 24, No. 14 of Space Business Daily, a Space Publications newsletter. Topics include hearings conducted by the Oversight Subcommittee, the European space industry concerns, the testing of the Lunar Hopper, the two phase program for defining the Apollo Applications program, contracts awarded to develop of 12-man communications system, economic and financial changes and impacts, topics on Future Space Business, and DOD and NASA contracts and negotiations. -
Space Business Daily, January 21, 1966.
This is Vol. 24, No. 15 of Space Business Daily, a Space Publications newsletter. Topics include the ill-fated Advanced Orbiting Solar Observatory is replaced by the Apollo Applications flights, the delay of the European trip for international space cooperation talks, part two of the European space industry concerns, the selection of the first Apollo crew, the first test of the Air Force astronaut maneuvering unit, the success of the sixth Apollo abort test, topics on Future Space Business, and DOD and NASA contracts and negotiations. -
Space Business Daily, January 24, 1966.
This is Vol. 24, No. 16 of Space Business Daily, a Space Publications newsletter. Topics include AOSO experiments to be carried by the Apollo Telescope Orientation Mount, the deadline for the post-Apollo program, problems with the 1967 budget, the pending agreement between NASA and the Department of the Interior's Geological Survery, the successful firing of a hydrazine engine, an analysis on ComSat profusion, interest in the ComSat membership expressed by various nations, the upcoming Gemini VIII recovery, the schedule for the Apollo program and Apollo Applications, topics on Future Space Business, and DOD and NASA contracts and negotiations. -
Space Business Daily, January 25, 1966.
This is Vol. 24, No. 17 of Space Business Daily, a Space Publications newsletter. Topics include a analytical review of NASA's 1967 budget, the total expenditure request by President Johnson for space exploration and exploitation, the MOL program and various aspects within, an update on the Space-Oceanography program, various contracts awarded, the development of a cooling system for the Precision Recovery Including Maneuvering Entry program, tables that show the NASA appropriation and budget plan, including allotments for research and development programs, manned space flights, space science and applications, advanced research and technology, technology utilization, and the defense budget. -
Space Business Daily, January 26, 1966.
This is Vol. 24, No. 18 of Space Business Daily, a Space Publications newsletter. Topics include the NASA budget impact on various programs including the Apollo Applications program, the Gemini Program, the Apollo program, the Saturn IB development, and more, further budget and funding information, the questioning of the separate Apollo ComSat system, ICBM development potential in China, the crew selection for Gemini X, and the budget plan for the construction of facilities and space operating expenses. -
Space Business Daily, January 27, 1966.
This is Vol. 24, No. 19 of Space Business Daily, a Space Publications newsletter. Topics include the National Space Program total budget and its breakdown, Apollo Lunar Surface Experiments, confirmation of Soviet ComSat system, the decline in missile procurement, the United States support a proposal for an international conference in 1967, topics on Future Space Business, the potential for space-borne voice-controlled computers, and DOD negotiations. -
Space Business Daily, January 28, 1966.
This is Vol. 24, No. 20 of Space Business Daily, a Space Publications newsletter. Topics include the Red China threat and the multiple programs associated with the necessary defenses, the feasibility of a manned space shuttle proven by McDonnell and Northrop Norair, the questioning of NASA and DOD cooperative agreements, another breakdown of various aspects of the National Space Program budget, and DOD and NASA contracts and negotiations. -
Space Business Daily, January 31, 1966.
This is Vol. 24, No. 21 of Space Business Daily, a Space Publications newsletter. Topics include penetration aids development, the possibility of the AA space shuttle test, U.S. defense capability for a possible nuclear attack, the first test firings of the flight-model Saturn V first stage, changes in earnings and other financial impacts, "the general nuclear war problem," topics on Future Space Business, and DOD and NASA grants, contracts, and negotiations. -
Space Business Daily, Space Log, January 1966.
This is the Space Log, a monthly publication for the Space Business Daily newsletter. The Space Log includes a detailed timeline of space activity and research over the course of the month, and a space flight log for January. -
Space Business Daily, February 2, 1966.
This is Vol. 24, No. 22 of Space Business Daily, a Space Publications newsletter. Topics include the preproposal conference for the Apollo Applications integrated experiments, the president's space report is submitted to Congress, the launch of the ninth Soviet lunar probe, the scheduling of the first Saturn IB launch, the recommendation for a space-astonomy program, and DOD and NASA contracts and negotiations. -
Space Business Daily, February 3, 1966.
This is Vol. 24, No. 23 of Space Business Daily, a Space Publications newsletter. Topics include the intiation of an Air Force manned space shuttle program, part two of the previously recommended space-astronomy program, the success of the second Surveyor landing test, the commissioning of the development of a valveless subliming solid control rocket that produces approximately one-millionth of a pound of trust, topics in Future Space Business, and DOD negotiations. -
Space Business Daily, February 4, 1966.
This is Vol. 24, No. 24 of Space Business Daily, a Space Publications newsletter. Topics include the successful completion of the first soft landing of a spacecraft on the lurain by the Soviet Union, the study of propellants for air-augmented rockets, ComSat's plans to build a U.S. ground station, part three of the previously recommended space-astronomy program, the "technology gap" between the United States and Europe, changes in earnings and other financial information, and DOD and NASA contracts and negotiations. -
Space Business Daily, February 7, 1966.
This is Vol. 24, No. 25 of Space Business Daily, a Space Publications newsletter. Topics include the transcription of photos from the Soviet's successful soft landing of Lunik IX, the confirmation of manned circumlunar flights, an analysis of Sputnik, the effects of the Soviet's Lunik IX on the Surveyor, the "disappointing" post-Apollo data, the updated Gemini agreement, NASA's order of Apollo medical kits and the delivery of a prototype of a lunar tool box, changes in earnings and other financial information, part four of the recommended space-astronomy program, topics on Future Space Business, and DOD and NASA contracts and negotiations. -
Space Business Daily, February 8, 1966.
This is Vol. 24, No. 26 of Space Business Daily, a Space Publications newsletter. Topics include the integration of an Apollo mapping/survey system, further analysis of Soviet techniques through the Lunik IX soft-lander and other information regarding the spacecraft, plans for various upcoming tests and launches, the study of nuclear generator burnup, topics on Future Space Business, and DOD and NASA contracts and negotiations. -
Space Business Daily, February 9, 1966.
This is Vol. 24, No. 27 of Space Business Daily, a Space Publications newsletter. Topics include the first flight of the lunar soft-lander Surveyor, the possibility of a manned circumlunar flight of Apollo, the expectation of a Franco-Soviet space agreement, a call from England for U.S./Soviet space cooperation, possible locations for the ComSat US ground station, a report of the Soviet soft-lander Lunik IX and accompanying photos, topics on Future Space Business, and DOD and NASA contracts and negotiations. -
Space Business Daily, February 10, 1966.
This is Vol. 24, No. 28 of Space Business Daily, a Space Publications newsletter. Topics include the extension of the MOL Contract Definition Phase, the delay of the ruling on ABC's request for a communications satellite authority, various research studies and proposals on space-related topics, changes in earnings and other financial information, topics on Future Space Business, and DOD and NASA contracts and negotiations. -
Space Business Daily, February 11, 1966.
This is Vol. 24, No. 29 of Space Business Daily, a Space Publications newsletter. Topics include Surveyor development problems to headline the Space Science and Applications Subcommittee hearings, various studies and contracts awarded in space-related fields, the next Soviet soft-lander, launch dates for Orbital Vehicle Air Force satellites, the success of the fifth Scout re-entry test, topics on Future Space Business, and DOD and NASA contracts and negotiations. -
Space Business Daily, February 14, 1966.
This is Vol. 24, No. 30 of Space Business Daily, a Space Publications newsletter. Topics include the response to a call for a six-month feasibility and preliminary design study of data relay satellites, scheduled hearings by the House Space Subcommittee, the announcement of MOL manned launches to be flown out of California not Florida sparks opposition to the plan, various launches and test dates, charts of manned space flight supporting research, space science and applications supporting research, advanced research and technology supporting research, and tracking and data acquisition supporting research, a report on NASA's advanced research and technology budget for 1967, topics on Future Space Business, the unveiling of a flight model of the Phoenix air-to-air missile, and DOD and NASA grants and negotiations. -
Space Business Daily, February 15, 1966.
This is Vol. 24, No. 31 of Space Business Daily, a Space Publications newsletter. Topics include the call to establish a manned exploration of the Moon as America's next national space goal after the lunar landing, the Air Force's MOL program and NASA's AA space station program, part one of the National Academy of Sciences' recommendations regarding rocket/satellite research, part two of the report on NASA advanced research and technology for 1967, topics on Future Space Business, and NASA negotiations. -
Space Business Daily, February 16, 1966.
This is Vol. 24, No. 32 of Space Business Daily, a Space Publications newsletter. Topics include the bidding for the development and fabrication contract for a ComSat multipurpose satellite, "trade mission reports on European Space Business," the halt of testing for the AGENA target vehicle for the Gemini VII mission, part two of recommendations regarding rocket/satellite research, the full-size experimental model of the Local Scientific Survey Module, changes in earnings and other financial information, and DOD and NASA negotiations. -
Space Business Daily, February 17, 1966.
This is Vol. 24, No. 33 of Space Business Daily, a Space Publications newsletter. Topics include the conflict between Florida Congressional delegation and the plans for the Air Force MOL program, the development of a composite engine for the Supersonic Combustion Ramjet, plans for a two-hour extra-vehicular Gemini VIII mission, the launch of France's second payload D-1A, part three of recommendations regarding rocket/satellite research, changes in earnings and other financial changes, and the awarding of a contract for Minuteman II guidance and control system components. -
Space Business Daily, February 18, 1966.
This is Vol. 24, No. 34 of Space Business Daily, a Space Publications newsletter. Topics include NASA's preparationg for a direct broadcast TV satellite, decisions for the Apollo Applications program, the defense of aspects of NASA's budget, an analysis of the meeting at Woods Hole, Massachusetts, topics on Future Space Business, and DOD and NASA negotiations. -
Space Business Daily, February 21, 1966.
This is Vol. 24, No. 35 of Space Business Daily, a Space Publications newsletter. Topics include the cutting of NASA's budget for 1970 unless "vigorous effort toward initiation of post-Apollo program missions is forthcoming," updates on the California MOL base controversy, the failure of AGENA engine tests, various budgetary problems in the Apollo program, various contracts awarded and changes in earnings, topics on Future Space Business, and DOD and NASA grants, contracts, and negotiations. -
Space Business Daily, February 23, 1966.
This is Vol. 24, No. 36 of Space Business Daily, a Space Publications newsletter. Topics include the proposal to cut some flights of various satellite programs and experiments on future Apollo Applications flights, the possibility of physics and astronomy experiments aboard the Air Force MOL flights, considerations to give the Air Force direction of all U.S. manned Earth-orbit programs, opposition to the California MOL base, the countdown for the first flight test of the Saturn IB rocket, a mock Lurain mission, various budget and financial earning topics, topics on Future Space Business, and NASA contracts and negotiations. -
Space Business Daily, February 24, 1966.
This is Vol. 24, No. 37 of Space Business Daily, a Space Publications newsletter. Topics include the call for immediate awarding of Voyager contracts, set backs on the Surveyor project and the classification of various launch dates, data from the Soviet's Luna IX, NASA long-range goals, the cancellation of Gemini land recovery plans, British Navy shifting to missile power and the confirmation of their purchase of 50 F-111A aircraft, changes in earnings and other financial information, and the rescheduling of the launch of two twin OV satellites. -
Space Business Daily, February 25, 1966.
This is Vol. 24, No. 38 of Space Business Daily, a Space Publications newsletter. Topics include hearing decisions on the Air Force's pending launch of five Manned Orbiting Laboratories from California instead of Florida, contracts for five Apollo lunar surface drills, NASA's order of new attitude control engine for space maneuvering, the rescheduling of Saturn IB's first test flight launch, the planned 1967 Mariner missions to Venus, plans for a new Mars mission probe, the defense of Gemini plans to Congress, a detailed breakdown of Defense Secretary's funding position for space and missile projects for 1967, the successful second test firing of Aerojet's motor, topics on Future Space Business, and DOD contracts and negotiations. -
Space Business Daily, February 28, 1966.
This is Vol. 24, No. 39 of Space Business Daily, a Space Publications newsletter. Topics include the ordering of seven-segment solid motors by the Air Force Space Systems Division for the MOL program, concern over the presented Apollo Applications plans for a manned space flight, the potential operational communications satellite system for tactile messages between warring units, another postponement of the Saturn IB launch, budget requirements in 1968 for the SNAP 8 program to continue, part twoi of the detailed breakdown of the Defense Secretary's funding position for space and missile projects for 1967, various business acquisitions and changes in earnings, the plans for a new facility to be built to house ramjet experimentation, topics on Future Space Business, and NASA contracts and negotiations. -
Space Business Daily, Space Log, February 1966.
This is the Space Log, a monthly publication for the Space Business Daily newsletter. The Space Log includes a detailed timeline of space activity and research over the course of the month of February. -
Letter to Robert E. Jones from Robert K. Bell.
Robert K. Bell writes to Senator Bob Jones for help and information regarding the Nickerson case. -
Letter and drafts of letter to the Deputy Chief of Staff for Intelligence from Robert K. Bell.
These drafts of the letter and final letter to the Deputy Chief of Staff for Intelligence requesting highly classified information to be made available to the Court in order to "insure a proper defense" in the Nickerson case. These documents also include a letter from Bell to Ray H. Jenkins asking him to read the draft of the letter before Bell sends it and also asks about traveling to Washington the following week.