UAH Archives, Special Collections, and Digital Initiatives

Browse Items (35 total)

  • finalscript24_082707130149.pdf

    Film script for the Saturn Quarterly Film Report - April through June, 1965.
  • SatuVspacprog_111307143135.pdf

    This paper discusses the flaws and limitations with welding technology, specifically with the techniques involved.
  • Reduemplmajo_112707122212.pdf

    R-ASTR-NF.; ABSTRACT: The servoactuator was developed to improve the reliability of the Saturn S-IVB thrust vector control system by insuring continued system operation if single point failures occur. The selection of the majority voting technique is discussed. Its simplicity is cited along with the advantages of minimum weight, size, power consumption, and compatibility with existing control electronics. Operational features, design mechanization, and the analysis of test results are covered.
  • Flatcabenggstudforsats-IVBveh_041608143857.pdf

    This paper describes the engineering approaches, investigations, results and conclusions of two National Aeronautics and Space Administration (NASA) flat-cable contracts from the George C. Marshall Space Flight Center (MSFC) to the Douglas Aircraft Company, Inc., for feasibility studies on the S-IVB stage of the Saturn Vehicle. In addition, the objectives and approaches for a third contract., "Flat-Cable Engineering Study", are discussed. A sister Douglas Paper No. 4186, to be presented by Dr. P. L. Hill, covers in detail the manufacturing aspects of the Flat-Cable Development Program.; Prepared by R.A. Klotz, Advance applications, Saturn Electronics, Missile and Space Systems Group, McDonnell Douglas Corporation for presentation at: IPC/EDN Flat-Cable Seminar, University of Southern California, Los Angeles, California, 20 June 1967.
  • Qtrlyrptladner_072808094003.pdf

    MSFC routing slip to Mr. Lee Cropp concerning the draft copy. Contains hand-written editing suggestions, as well as a note that even if these suggestions are applied, that does not imply approval of the script for use. Covers July, August and September, 1965.
  • relipreddesideci_062107152620.pdf

    This paper presents some case histories in which reliability prediction plays an important role.
  • tooforaerapp_060707142010.pdf

    Presented to the American Ordnance Association. A presentation on Saturn S-IC Tooling in order to demonstrate the trend towards larger tooling support. Focuses on the tank-structures primarily.
  • Techprobsatuclasvehi_091707160424.pdf

    Aerospace Workshop. University of Hawaii.; Includes references to slides.
  • satuS-IVBquartechprogrepo_110607103908.pdf

    Douglas Aircraft Company Report DAC-56445, Saturn S-IVB Quarterly Technical Progress Report, covers design and development progress on the Saturn IB and Saturn V configurations of the S-IVB stage during August and September 1966. This report is prepared for the National Aeronautics and Space Administration under Contract NAS7-101.
  • Satquatecprorep_022108133339.pdf

    Douglas Aircraft Company Report DAC-56533, Saturn S-IVB Quarterly Technical Progress Report, covers design and development progress on the Saturn IB and Saturn V configurations of the S-IVB stage during January, February, and March 1967. This report is prepared for the National Aeronautics and Space Administration under Contract NAS7-01.; Prepared for National Aeronautics and Space Administration under NASA contract NAS7-101.; Approved by A. P. O'Neal, Director, Saturn Development Engineering.
Output Formats

atom, csv, dc-rdf, dcmes-xml, json, omeka-xml, rss2