Browse Items (35 total) Browse All Browse by Tag Search Items Subject is exactly "Saturn launch vehicles--Design and construction" Sort by: TitleCreatorIdentifierDate Added "The Challenge of Change vs the Control of the Process." Clark, Ross 1964-12-01 "Film script for Saturn I/IB quarterly film report no. 15." Conover-Mast Publications, Inc. 4/1/1963 "Film script for Saturn I/IB quarterly film report no. 16." Conover-Mast Publications, Inc. 7/1/1963 "Film script for Saturn quarterly film report no. 18." Conover-Mast Publications, Inc. 1/1/1964 "The uprated Saturn I - its growth potential & future role in space." Vehko, Vaino J. 1967-05-18 "Tooling for aerospace application." Mortimer, Edward P. 1963-10-30 Film script for Saturn quarterly film report no. 9 covering July, August, September, 1961. 1962-01-01 Film script for Saturn quarterly film report no. 10 (covering October, November, December, 1961). 1962-01-01 Film script for Saturn quarterly film report no. 11 (covering January, February, March, 1962). 1963-01-01 Film script for Saturn quarterly film report no. 12 (covering April, May, June, 1962). 1963-01-01 Film script for Saturn C-1/C-1B quarterly film report no. 13 (covering July, August, September, 1962). 1963-01-01 Script for Saturn C-1/C-1B quarterly film report no. 14 (covering Oct., Nov., Dec., 1962). 1963-01-01 "Technological problems of the Saturn class vehicle." Mrazek, William A. 1966-06-01 Saturn V news reference. United States. National Aeronautics and Space Administration 1968-09-01 "Saturn V space program and aluminum welding technology." Hoppes, R. V. 1967-01-01 "Saturn base heating review." Wilson, Homer B. 1967-01-01 "Saturn IB SA-217 reference launch vehicle." Space Vehicle Systems Branch. Propulsion and Vehicle Engineering Laboratory. 1968-01-16 "Saturn S-IVB quarterly technical progress report." Rainwater, B. J. 1966-09-01 "S-IVB Saturn high energy upper stage and its development." Roth, L. 1967-01-01 "Saturn S-IVB quarterly technical progress report." Rainwater, B. J. 1967-03-01 "Reliability prediction in design decision." Levinson, John R. 1964-01-07 "Response to any news media queries concerning MSFC S-II stage." Weber, Fritz H. 1967-01-05 "Saturn I/IB quarterly film report no. 24, April, May and June, 1965." "Draft script Saturn I/IB quarterly film report no. 25." Ladner, G. 1965-10-01 "Redundancy employing majority voting for a Saturn servoactuator." Kalange, M. A. 1967-01-01 "Operational Experiences on the Saturn V S-IVB stage." Bauer, H. E. 1968-10-11 "Improving the Uprated Saturn I." Tharratt, C. E. 1967-12-01 "Flat Cable Engineering Studies for Saturn S-IVB Vehicles." Klotz, R. A. 1967-06-20 "Fabricating the Saturn S-IC Booster." Smith, Whitney G. 1965-01-01 "Film Script for Saturn Quarterly Film Report, Nr. 20 (April, May, June) 1964." George C. Marshall Space Flight Center 1964-07-14 "Film Script for Saturn I/IB Quarterly Film Report, Nr. 22 (Covering October, November, December 1964)." George C. Marshall Space Flight Center 1964-12-23 "Film Script for Saturn I/IB Quarterly Film Report, Nr. 23 (Covering January, February, March 1965)." George C. Marshall Space Flight Center 1965-01-01 "Film Script for Saturn Quarterly Film Report, No. 19 (January, February, March) 1964." George C. Marshall Space Flight Center 1964-04-28 "Final Script for Saturn IB Quarterly Film Report, No. 26 (covering October, November, December, 1965)." George C. Marshall Space Flight Center 1966-02-08 "Final Script for Saturn I/IB Quarterly Film Report, No. 24 (covering April, May, June 1965)." George C. Marshall Space Flight Center 1965-07-26 Output Formats atom, csv, dc-rdf, dcmes-xml, json, omeka-xml, rss2 Refine search Identifier Select...challchancontrproc.pdfFabrsatus-icboos.pdffilsciforsatIIBquafilrepno20covaprmayjun1964_090507102325.pdffilsciforsatIIBquafilrepnr22covoctnovdec1964_083107102443.pdffilsciforsatIIBquafilrepnr23covjanfebmar1965_082907142544.pdffilscrforsatquafilrepno19janfebmar1964_090707084318.pdffinalscript_082707095005.pdffinalscript24_082707130149.pdfFlatcabenggstudforsats-IVBveh_041608143857.pdfimptheuprsatI.pdfOperexpesatu_012309125536.pdfqltyrptno24_082707120916.pdfQtrlyrptladner_072808094003.pdfReduemplmajo_112707122212.pdfrelipreddesideci_062107152620.pdfRespanynews_121907141751.pdfS1VBsathigh_032608091902.pdfSatquatecprorep_022108133339.pdfSaturnbaseheatingreview_022608110235.pdfSaturnIBSA217_052008142122.pdfsatuS-IVBquartechprogrepo_110607103908.pdfSatuVnewsrefe.pdfSatuVspacprog_111307143135.pdfspc_stnv_000192spc_stnv_000285spc_stnv_000291spc_stnv_000292spc_stnv_000293spc_stnv_000294spc_stnv_000295spc_stnv_000296spc_stnv_000300spc_stnv_000334spc_stnv_000580spc_stnv_000637spc_stnv_000639spc_stnv_000646spc_stnv_000651spc_stnv_000663spc_stnv_000678spc_stnv_000690spc_stnv_000732spc_stnv_000733spc_stnv_000748spc_stnv_000760spc_stnv_000764spc_stnv_000874spc_stnv_000907spc_stnv_000913spc_stnv_000919spc_stnv_000920spc_stnv_000921spc_stnv_000922spc_stnv_000923spc_stnv_000924spc_stnv_000925spc_stnv_000926spc_stnv_000927Techprobsatuclasvehi_091707160424.pdfTheupratedSaturn I_012208114543.pdftooforaerapp_060707142010.pdfuprsatIBquafilrepandrelmatfilsciforsatquafilrepno09_071007100203.pdfuprsatIBquafilrepandrelmatfilsciforsatquafilrepno10_071007101257.pdfuprsatIBquafilrepandrelmatfilsciforsatquafilrepno11_071007101814.pdfuprsatIBquafilrepandrelmatfilsciforsatquafilrepno12_071007102253.pdfuprsatIBquafilrepandrelmatfilsciforsatquafilrepno13_071007102648.pdfuprsatIBquafilrepandrelmatfilsciforsatquafilrepno14_071007103243.pdfuprsatIBquafilrepandrelmatfilsciforsatquafilrepno15_071007103723.pdfuprsatIBquafilrepandrelmatfilsciforsatquafilrepno16_071007104133.pdfuprsatIBquafilrepandrelmatfilsciforsatquafilrepno18_071007104903.pdf Title Select..."Draft script Saturn I/IB quarterly film report no. 25.""Fabricating the Saturn S-IC Booster.""Film script for Saturn I/IB quarterly film report no. 15.""Film script for Saturn I/IB quarterly film report no. 16.""Film Script for Saturn I/IB Quarterly Film Report, Nr. 22 (Covering October, November, December 1964).""Film Script for Saturn I/IB Quarterly Film Report, Nr. 23 (Covering January, February, March 1965).""Film script for Saturn quarterly film report no. 18.""Film Script for Saturn Quarterly Film Report, No. 19 (January, February, March) 1964.""Film Script for Saturn Quarterly Film Report, Nr. 20 (April, May, June) 1964.""Final Script for Saturn I/IB Quarterly Film Report, No. 24 (covering April, May, June 1965).""Final Script for Saturn IB Quarterly Film Report, No. 26 (covering October, November, December, 1965).""Flat Cable Engineering Studies for Saturn S-IVB Vehicles.""Improving the Uprated Saturn I.""Operational Experiences on the Saturn V S-IVB stage.""Redundancy employing majority voting for a Saturn servoactuator.""Reliability prediction in design decision.""Response to any news media queries concerning MSFC S-II stage.""S-IVB Saturn high energy upper stage and its development.""Saturn base heating review.""Saturn I/IB quarterly film report no. 24, April, May and June, 1965.""Saturn IB SA-217 reference launch vehicle.""Saturn S-IVB quarterly technical progress report.""Saturn V space program and aluminum welding technology.""Technological problems of the Saturn class vehicle.""The Challenge of Change vs the Control of the Process.""The uprated Saturn I - its growth potential & future role in space.""Tooling for aerospace application."Film script for Saturn C-1/C-1B quarterly film report no. 13 (covering July, August, September, 1962).Film script for Saturn quarterly film report no. 10 (covering October, November, December, 1961).Film script for Saturn quarterly film report no. 11 (covering January, February, March, 1962).Film script for Saturn quarterly film report no. 12 (covering April, May, June, 1962).Film script for Saturn quarterly film report no. 9 covering July, August, September, 1961.Saturn V news reference.Script for Saturn C-1/C-1B quarterly film report no. 14 (covering Oct., Nov., Dec., 1962). Alternative Title Select...AIAA Paper No. 65-294Douglas Paper No. 4187 Description Select...A list of film reports covering the months of April, May and June of the year 1965.Aerospace Workshop. University of Hawaii.; Includes references to slides.AIAA Second Annual Meeting, San Francisco, California. Discusses the fabrication process of the Saturn S-IC booster.Douglas Aircraft Company Report DAC-56445, Saturn S-IVB Quarterly Technical Progress Report, covers design and development progress on the Saturn IB and Saturn V configurations of the S-IVB stage during August and September 1966. This report is prepared for the National Aeronautics and Space Administration under Contract NAS7-101.Douglas Aircraft Company Report DAC-56533, Saturn S-IVB Quarterly Technical Progress Report, covers design and development progress on the Saturn IB and Saturn V configurations of the S-IVB stage during January, February, and March 1967. This report is prepared for the National Aeronautics and Space Administration under Contract NAS7-01.; Prepared for National Aeronautics and Space Administration under NASA contract NAS7-101.; Approved by A. P. O'Neal, Director, Saturn Development Engineering.Film script for the Saturn Quarterly Film Report - April through June, 1964.Film script for the Saturn Quarterly Film Report - April through June, 1965.Film script for the Saturn Quarterly Film Report - January through March, 1964.Film script for the Saturn Quarterly Film Report - January through March, 1965.Film script for the Saturn Quarterly Film Report - October through December, 1964.Film script for the Saturn Quarterly Film Report - October through December, 1965.Film script reporting on how the Saturn 1 will be used and what its take-off process will look likeFilm script reporting on the construction of the Saturn 1Film script reporting on the testing of the Saturn 1Letter to answer any incoming questions from the media regarding the MSFC-II stage and any briefed on Seal Beach.MSFC routing slip to Mr. Lee Cropp concerning the draft copy. Contains hand-written editing suggestions, as well as a note that even if these suggestions are applied, that does not imply approval of the script for use. Covers July, August and September, 1965.Presented to the American Ordnance Association. A presentation on Saturn S-IC Tooling in order to demonstrate the trend towards larger tooling support. Focuses on the tank-structures primarily.R-ASTR-NF.; ABSTRACT: The servoactuator was developed to improve the reliability of the Saturn S-IVB thrust vector control system by insuring continued system operation if single point failures occur. The selection of the majority voting technique is discussed. Its simplicity is cited along with the advantages of minimum weight, size, power consumption, and compatibility with existing control electronics. Operational features, design mechanization, and the analysis of test results are covered.Remarks by Vaino J. Vehko, Director of Engineering, Chrysler Corporation Space Division at 30th Annual Meeting, Aviation/Space Writers Association, Las Vegas, NevadaThe development of carrier rockets For manned space missions has been one of the major activities in the aerospace field during the past decade. The early space efforts were made possible by the existence of large ballistics missiles. It soon became obvious that the delivery of weapons and the launch of large spacecraft could not be combined into one operational system in an efficient way; therefore, a family of spacecraft boosters had to be created.The introduction states, "This paper is designed to present the Rocketdyne engine program as it applies to the Saturn launch vehicles and will apply to the Apollo program of manned flight to the moon (Fig. 1). The vehicle that will launch this flight is the Saturn V, the largest and most powerful of the Saturn family. This vehicle, 362 feet tall and 33 feet in diameter, will be capable of sending a 45-ton payload to the moon or placing a 120-ton payload in earth orbit. Five F-1 engines power the first stage of the Saturn V; five J-2 engines, the second stage; and one J-2 engine, the third stage. The thrust of the first-stage engines alone will be equivalent to 160 million horsepower. Both of these engines, the F-1 and the J-2, were designed at, and are currently being produced by Rocketdyne."The Saturn I booster which is powered by a cluster of eight rocket engines has been successfully flown on four successive flights. The early success of this large launch vehicle is a strong indication of the soundness of its base heating program. This paper summarizes the thinking that went into the design of our base configuration. Flight test results indicate that pressures, temperatures and heating rates were generally as expected. New techniques have been investigated for generating design data. It has been found experimentally that pressure and thermal fields establish themselves in one to three milliseconds and that data from the "short duration" technique compare favorably with "long duration" type tests. As a result, the new "short duration" technique has become the standard for generating design data for the Saturn vehicle.This book is designed to serve as an aid to newsmen in present and future coverage of the Saturn IB in its role in the Saturn/Apollo Program and as a general purpose large launch vehicle.This document contains a definition of a reference Saturn IB launch vehicle designated SA-217. The Saturn IB SA-217 is a projected reference vehicle, based on Saturn IB SA-212, incorporating the latest proposed product improvements. The two-stage payload capability of this vehicle to a 100-nautical-mile circular orbit is 44,965 pounds. The Saturn IB SA-217 launch vehicle is to be used as the baseline vehicle for advanced studies requiring the use of the standard or modified Saturn IB launch vehicle. This vehicle definition does not necessarily represent approved changes to any specific vehicle. This document supersedes the Saturn IB SA-213 reference Launch Vehicle, described in memorandum R-P&VE-DIR-65-92.This paper describes the engineering approaches, investigations, results and conclusions of two National Aeronautics and Space Administration (NASA) flat-cable contracts from the George C. Marshall Space Flight Center (MSFC) to the Douglas Aircraft Company, Inc., for feasibility studies on the S-IVB stage of the Saturn Vehicle. In addition, the objectives and approaches for a third contract., "Flat-Cable Engineering Study", are discussed. A sister Douglas Paper No. 4186, to be presented by Dr. P. L. Hill, covers in detail the manufacturing aspects of the Flat-Cable Development Program.; Prepared by R.A. Klotz, Advance applications, Saturn Electronics, Missile and Space Systems Group, McDonnell Douglas Corporation for presentation at: IPC/EDN Flat-Cable Seminar, University of Southern California, Los Angeles, California, 20 June 1967.This paper discusses five improved versions of the Uprated Saturn I that were studied by the Chrysler Corporation Space Division, supported by the Douglas Aircraft Corporation.This paper discusses the flaws and limitations with welding technology, specifically with the techniques involved.This paper presents a light, but reverent, discussion of some of the Douglas operational experiences on the Saturn V/S-IVB stage. Certain relevant aspects of earlier work on the Thor intermediate range ballistic missile, the Saturn I S-IV stage, and the Uprated Saturn I S-IVB stage are also discussed.; Aeronautic and Space Engineering and Manufacturing Meeting, Los Angeles, Calif., Oct. 7 - 11, 1968.This paper presents some case histories in which reliability prediction plays an important role.Unclassified film script of the Saturn I/IB Quarterly Film Report covering April, May, June, 1963. There are handwritten notes and edits throughout the document.Unclassified film script of the Saturn I/IB Quarterly Film Report covering January, February, March, 1963. There are handwritten notes and edits throughout the document.Unclassified film script of the Saturn I/IB Quarterly Film Report covering October, November, December, 1963. A handwritten note at the top of the title page lables this copy as the "Final Draft". Creator Select...Bauer, H. E.Clark, RossConover-Mast Publications, Inc.Douglas Aircraft Company. Missile and Space Systems DivisionGeorge C. Marshall Space Flight CenterHoppes, R. V.Kalange, M. A.Klotz, R. A.Ladner, G.Levinson, John R.Martin, C. W.Mortimer, Edward P.Mrazek, William A.Rainwater, B. J.Roth, L.Smith, J. D.Smith, Whitney G.Space Vehicle Systems Branch. Propulsion and Vehicle Engineering Laboratory.Tharratt, C. E.United States. National Aeronautics and Space AdministrationVehko, Vaino J.Weber, Fritz H.Wilson, Homer B. Temporal Coverage Select...1960-1969 Subject Remove filter...Saturn launch vehicles--Design and construction Type Select...Design ReviewDesign ReviewsEssaysFilm ReportsFilm scriptsMemorandumsNews ReferencesPresentationsPress ReleasesProgress ReportsReportsReviewsSpeechesTechnical reportsText Language Select...en