UAH Archives, Special Collections, and Digital Initiatives

Browse Items (175 total)

  • Satuvmanainfo.pdf

    This document contains copies of management charts maintained in the Managerial Data Center of the executive Staff on the Saturn V project. To facilitate use of this document, all Saturn V classified data has been removed and will be published in Volume XI. A list of these charts are shown on the "Table of Contents". Information on other MSFC activities will be published in separate volumes as indicated on the "Schedule for Publication of Data Bank Charts" contained in this volume.
  • Satuvlaun1967.pdf.pdf

    This booklet has been prepared to provide a quick reference to Saturn V stage peculiar ground support equipment. It consists of visual presentations and a brief description of each major component. It is intended to quickly familiarize concerned elements with the over-all MSFC launch vehicle ground support equipment and is not intended for design usage. The booklet has been prepared in five sections. Section I contains the introductory material and a description of the Saturn V mobile launcher (ML). Section II contains information on the umbilical equipment. Section III contains information on the servicing equipment, both fixed and mobile. Section IV contains information on the access equipment. Section V contains information on the handling and auxiliary equipment.
  • SatuVgrouwindprog_091207152652.pdf

    The concept on Saturn V was to "budget" an amount for the dynamic portion of the wind load as a factor on the steady state drag. Wind tunnel tests paralleled the development and fabrication phases. The results indicated that the system was unable to withstand the design winds; thus, a decision was made to implement a viscous damper "fix" on the facility vehicle at the Kennedy Space Center. Damping tests in the Vertical Assembly Building (VAB) will have been completed and response tests on the pad will be in progress at the time of this symposium. This paper will present the history and status of this program to date.
  • satuVfirsstagannuprogrepofiscyear1966_091207124644.pdf

    This report is the consolidation of D5-11994, "Quarterly Technical Progress Report," for the fourth fiscal quarter and the fiscal year 1966 Annual Progress Report and places special emphasis on activities on the fourth fiscal quarter.
  • SatuVDeri_062308104520.pdf

    This paper desciibes an evolutionary family concept of !h turn V derivative launch vehicle systems, discusses their performance capabilities, and outlines their ability to perform orbital and hlgh-energy missions at minimum total program cost.
  • Satusyststud.pdf

    Study regarding the three-stage carrier vehicle E-1 engines.
  • SatuST12inerguid_051310124015.pdf

    a press release which focuses around the Apollo 9 flight and what role the ST-124-M inertial guidance platform has in it.
  • Satuspecinde.pdf

    The purpose of the'saturn V Specification Index is to provide the official detailed record of all specifications and specification changes required for configuration management of the Saturn V Program and to report specification submittal and approval status.
  • Satusivfirs_102810143053.pdf

    Press release detailing the firing of the Saturn S-IV in California.
  • SaturnVsemiannual_051608155631.pdf

    This Saturn V Semi-Annual Progress Report describes progress and major achievements from July 1, 1967 in the Saturn V Program.
  • saturnsii_062907104459.pdf

    The S-II is the second stage of NASA's Apollo moon-landing rocket - the giant Saturn V. The most powerful hydrogen-fueled booster under production, the S-II is destined for Apollo manned lunar missions and will help power three Americans to the moon. The S-II is being developed and manufactured at Seal Beach, Calif., by North American's Space and Information Systems Division, Downey, Calif., under the technical direction of NASA's Marshall Space Flight Center, Huntsville, Ala.
  • saturnsa-1flighanditsinstrumenta_031607091738.pdf

    Presentation focusing on empahsising the importance of space programs such as Saturn.
  • saturnlaunchvehicle_031607091024.pdf

    Speech to be presented by C. L. Bradshaw, Deputy Director, Computation Division at Supervisor's Club, Knoxville Utilities Board. Speech praising the progress of space-based technologies and advancements.
  • saturnandlunarflight_033007104525.pdf

    Speech by K.K. Dannenberg at American Society of Civil Engineers, Huntsville, November 2.; Projectionist's copy (photocopy) - slide numbers are included.
  • Saturn AS-501_050208104537.pdf

    The findings herein are the results of the combined evaluation efforts of the various Laboratories of Research and Development Operations at MFSC, The Boeing Company, North American Rockwell/Space Division, Douglas Aircraft Company, International Business Machines, and Rocketdyne.
  • Satulunavehi_091707160212.pdf

    Aerospace Workshop, University of Hawaii.; Includes references to slides.
  • Satulaunvehifami_091707161639.pdf

    Presentation focusing on the history of Saturn V's engineering history and crew.
  • Satulaunvehi_081407123504.pdf

    General O'Connor's presentation to the American Institute of Aeronautics and Astronautics. Centers around saturn space vehicles and makes references to slides.
  • satuilluchroapri1957-augu1963_041307131645.pdf

    A list of images with detailed descriptions of what they are and their histories.
  • satuIfirsgene_062007153848.pdf

    A basic description of the Saturn rockets alongside diagrams for context.
  • satuIengigimbandthruvectcontsyst_041007110502.pdf

    The hydraulic systems for the two-stage block II Saturn I vehicle are described with the evolution of their development.
  • SatuIBnewsrefe.pdf.pdf

    Images, decriptions, graphics and explanations of the various Saturn rockets.
  • satuc1vehiprojdeveplan_031607120636.pdf

    Plan for the development and construction of the Saturn C-1 vehicle.
  • satuc1vehiprojdeveplan_031607120636.pdf

    The Saturn C-1 space vehicle system is being developed by government agencies at industrial firms under the direction of the National Aeronotics and Space Division
  • satuandtheexploofspac_042007155818.pdf

    Presentation Raymond Pisani to the East-West Bank Chamber of Commerce regarding the Saturn project's roll in space exploration and what contrabutions the East-West Bank can make in that area.
  • satuanditsmiss_033007152437.pdf

    Presentation from Harper, discussing the Saturn Project's then-status, background and plans.
  • satstasIIjul71961min_031307092529.pdf

    Transcription of a confrence aiming to propose ideas for new rocket designs. Includes references to slides.
  • satlauveh_071107124055.pdf

    This security classification guide is a compilation of previous individual classification assignments. Consideration of international affairs, the use and development of advanced technological information, and requirements of flight safety have influenced these assignments.
  • satillchr19571962_060407132819.pdf

    Document detailing the history of the saturn project between April, 1957 through November, 1962.
  • satIfliteseval_070507143020.pdf

    As this paper is being written, the Saturn I flight test program includes five flights launched between October, 1961 and January, 1964. All five fiights were complete successes, both in achieving all major test missions and in obtaining an unprecedented volume of system performance data for flight analysis.
  • satIBVinsuni_071707142445.pdf

    This brochure provides some basic, general information about the lnstrument Unit, a very important part of the Saturn IB and Saturn V launch vehicles. These launch vehicles are being developed primarily for the Apollo program for manned lunar exploration but will also be used for future space missions.
  • satibpreslittlerockgrp_071907090431.pdf

    Speech by H.D. Lowrey, SAE Meeting, Detroit, Michigan. Focuses on the Apollo project, the technology involved and what the goals of the project are.
  • satiblauvehsyst_071107131340.pdf

    Speech containing information regarding Crystler's role in the Saturn Project as contracted builders of the stages of three space vehicles.
  • Satannprorep_030408114318.pdf

    The Annual Progress Report from July 1st, 1966 through June 30thm 1967.
  • Saaprogspec_091707160850.pdf

    Memo sent to Major General D. M. Jones - NASA/ML.
  • Sa-203.pdf.pdf

    The "Saturn Technical Information Handbook" provides up-to-date reference material to the Launch Operations Center personnel. This material shows the assembly and operation of the Saturn Vehicle components for systems analysis.; Volume II is available on the NASA Technical Reports Server (NTRS) as a PDF.
  • s-cisimu_062007154114.pdf

    Huntsville, Ala. -- NASA Marshall Space Flight Center engineers and scientists will soon begin using a giant Saturn V booster simulator in making various tests of equipment and facilities here and at Michoud Operations, Mississippi Test Operations and Cape Kennedy.
  • Roles-ivbapol_041508165617.pdf

    Douglas Paper No. 4396.; Prepared by Ludwig Roth, Director, Saturn/Apollo Program Extension, Douglas Aircraft Company.; Presented to 16th Annual Conference of the Hermann Oberth Society. Discusses the role of the Apollo rocket after the Apollo program has concluded.
  • rockexheffects_071707095315.pdf

    Presented by Olen P. Ely, National Aeronautics and Space Administration, Marshall Space Flight Center, Huntsville, Alabama and R. W. Hockenberger, International Business Machines. Paper that explores the effects of rocket-engine exhaust on radio-signals.
  • Realtimeopersyst_101507115951.pdf

    Presentation aimed to encourage a final check on the Saturn V project before its first launch to ensure safety and success.
Output Formats

atom, csv, dc-rdf, dcmes-xml, json, omeka-xml, rss2