UAH Archives, Special Collections, and Digital Initiatives

Browse Items (204 total)

  • spc_stnv_000101.pdf

    According to the table of contents, this volume of appendices contain various charts, graphs, and diagrams related to the S-IC stage data, instrument unit data, and vehicle data.
  • spc_stnv_000113.pdf

    This paper, which was presented at a Semi-Annual Meeting of the American Rocket Society, traces the role of the United States Army in national space activities. Incorporated in the report are photographs illustrating the evolution of the satellite and space program.
  • metmeawitpropeg_081707093957.pdf

    Presentation at the Northeast Electronics Research and Engineering Meeting, Boston, Massachusetts, November 4, 1965. Ernest Stuhlinger, Director, Research Projects Laboratory, George C. Marshall Space Flight Center (NASA), Huntsville, Alabama.; INTRODUCTION: The prime objective of Project Pegasus is to measure, in the vicinity of the earth, the meteoroid penetration frequency in aluminum sheets of thicknesses which approach those of space capsule walls. Plans for the project were initiated at NASA in 1962 by the Office of Advanced Research and Technology and the George C. Marshall Space Flight Center. Throughout the project, members of the Langley Research Centers supported the project with experiments and advice.
  • Binder1_070908082349.pdf
  • Binder4_051208094654.pdf

    The abstract states "A telemetry system is a device to transfer information from an inaccessible to an accessible location. A constant input to a telemetry system yields outputs that are distributed according to some density function. A linear change in this constant input may yield a nonlinear change in output. The theory of statistics and experimental design may be applied to the data received from a flight to evaluate the inflight accuracy, linearity, and precision of various telemetry systems. This paper explains the analytical concepts used in postflight analysis of Instrument Unit telemetry systems. It also presents the method for interpreting the results of these analytical techniques."
  • spc_stnv_000065.pdf
  • Binder1_081110135224.pdf

    The document is a Space Task Group report to the president. Pages 8, 18, 26, 27 of the document are missing.
  • Casecomp_091907132002.pdf

    "The Case for Compatibility" is a paper by Robert L. Smith, Jr., who worked in Quality and Reliability Assurance Laboratory at George C. Marshall Space Flight Center. The summary states, "Ever since the use of missiles and space launch vehicles began, questions have existed in every program regarding the similarity between upstream (e.g., manufacturing, static firing ) and launch site checkout equipment. Programs have existed which utilized nearly identical equipment for both uses; other programs have existed in which any resemblance of the equipment was probably coincidental. Many factors have entered the final decisions, not the least of which were economic and schedule considerations, and, in some instances, the organizational structure of the developer."
  • Binder1_071910110656.pdf

    The Preface states "This is a directory of industry, University, and Federal contacts who are involved in the areas of Management Science, Behavioral Science, Operations Research , Cybernetics, and Organizational Structure and Behavior. The listing represents a variety of disciplines -- Sociology, Psychology, Social Psychology, Psychiatry, Anthropology, Statistics, History, Public Administration, Political Science, Economics, Systems Analysis, Ecology,and General Systems Theory."
  • builmoonrock_082007101725.pdf

    "Building the Moon Rocket" was presented at the National Machine Tool Builders Association Meeting, Doral Beach Hotel, Miami, Florida on November 3, 1965 by Dr. Mathias P.L. Siebel, the Deputy Director, Manufacturing Engineering Laboratory. There are handwritten notes throughout.