"Problems experienced in program management."
Letter to "management" detailing problems identified in management's handling of projects. -
"Operational Experiences on the Saturn V S-IVB stage."
This paper presents a light, but reverent, discussion of some of the Douglas operational experiences on the Saturn V/S-IVB stage. Certain relevant aspects of earlier work on the Thor intermediate range ballistic missile, the Saturn I S-IV stage, and the Uprated Saturn I S-IVB stage are also discussed.; Aeronautic and Space Engineering and Manufacturing Meeting, Los Angeles, Calif., Oct. 7 - 11, 1968. -
"History of MSFC Reliability Philosophy."
Paper given to North East Chapter , Mississippi Society of Professional Engineers. Essay discussing the history of the MSFC Reliability Philosophy. -
"Saturn V First Stage Annual Progress Report: Fiscal Year 1968."
The report covers June 30, 1967 through June 27, 1968: Contract NAS8-5608, Schedules 1 and 1A, July 27, 1968. Prepared by J. P. Delaloye, Management Reporting and Analysis; Supervised by D. G. Valentine, Management Reporting and Analysis; Approved by R. F. Terry, Program Reports; D. H. Creim, Michoud, Program Planning and Reporting Manager; E. K. Cooper, S-IC Program Executive. -
"Aero-Astrodynamics Laboratory Bimonthly Progress Report: June - July 1968."
Includes Technical and Scientific Staff; Advanced Studies Office; Projects Office; Aerospace Environment Division; Aerophysics Division; Astrodynamics and Guidance Theory Division; Dynamics and Flight Mechanics Division; Flight Test Analysis Division. -
"Aero-Astrodynamics Laboratory Bimonthly Progress Report: April - May 1968."
Includes Advanced Studies Office, Aerospace Environment Division, Astrodynamics and Guidance Theory Division, Projects Office, Aerophysics Division, Dynamics and Flight Mechanics Division, Flight Test Analysis Division. -
"MSFC projects index by laboratory."
Project indexes included for: Advanced Systems Office, Aero-Astrodynamics Laboratory, Astrionics Laboratory, Computation Laboratory, Engineering Computation Division, Manufacturing Engineering Laboratory, Propulsion and Vehicle Engineering Laboratory, Quality and Reliability Assurance Laboratory, Research and Development Operations, Research Projects Laboratory, and Test Laboratory. -
"Manned space flight program review : MSFC institutional report."
Report covers R & D, Administrative operations, staffing, facilities, and funding. -
"Memorandum: collection, preparation and submission of POP 65-3."
This memo constitutes a request for all MSFC elements to prepare and submit information as scheduled in Enclosure 1. This schedule lists only key interface dates from one organization to another. It will be the responsibility of I-RM and R-RM to implement internal schedules compatible with Enclosure 1. -
"Launch Vehicle Engines Project Development Plan."
This revised edition of the Launch Vehicle Engines Project Development Plan supersedes the issue dated July 1, 1965. Significant changes which have been made are:- Removal of classified data to permit publication as an unclassified document; - Removal of material applicable to the RL-10 Engine Project which was transferred to the Lewis Research Center effective May 1, 1966; - Elimination of detailed schedules which quickly become obsolete; - Punched for maintenance in loose-leaf 3-ring binders and for ease in updating material through issuance of replacement sheets. Binders are not furnished. The information in this document is current to January 1, 1967.; The Launch Vehicle Engines Project Development Plan is established in accordance with requirements of NASA General Management Instruction 4-1-1, Planning and Implementation of NASA Projects, and OMSF Instruction MP 9320.044, Preparation and Revision of Program/Project Development Plans (PDP's). The Plan, herein referred to as the PDP, has been developed within the scope of current Apollo Projects Approval Documents (PADS) and will be maintained by the Engine Program Manager to identify program requirements, responsibilities, tasks, and resources, and time phasing of major actions required to accomplish the Engine Program. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (April 1, 1966 through April 30, 1966)."
Progress report for the month of April, 1966. -
"Apollo Program Management Volume 3."
According to the introduction found on page ii, this document was created to detail the "MSFC segment of the total Apollo Management process and to describe the methodologies and techniques currently being implemented." -
"Aero-Astrodynamics Laboratory bimonthly progress report : August and September 1967."
Includes: Projects Office; Advanced Studies Office; Aerospace Environment Division; Astrodynamics and Guidance Theory Division; Aerophysics Division; Dynamics and Fight Mechanics Division; Flight Test Division. -
"Vol. IV 3rd edition Management Information."
This document contains copies of management charts and photographs maintained in the Management Information Office of the Executive Staff on Advanced Program and Research and Technology Areas. -
Saturn V management information : August 1964 : Volume VI.
This document contains copies of management charts maintained in the Managerial Data Center of the executive Staff on the Saturn V project. To facilitate use of this document, all Saturn V classified data has been removed and will be published in Volume XI. A list of these charts are shown on the "Table of Contents". Information on other MSFC activities will be published in separate volumes as indicated on the "Schedule for Publication of Data Bank Charts" contained in this volume. -
"Management system"
The title has been cut off of document. This was placed inside the document Configuration Management. An organizational chart of plans and critical events related to those plans. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report, September."
Monthly progress report for the month of September, 1968 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report, November."
Monthly progress report for the month of November, 1968 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (July 1, 1966 through July 31,1966)."
A collection of progress reports covering a large number of projects within the month of July, 1966 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (August 1, 1966 through August 31, 1966)."
A collection of progress reports covering a large number of projects within the month of August, 1966 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (November 1, 1966 through November 30, 1966)."
A collection of progress reports covering a large number of projects within the month of November, 1966 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (March 1, 1966 through March 31,1966)."
A collection of progress reports covering a large number of projects within the month of March, 1966 -
"Human factor systems."
Reports and resumes detailing funds, guidelines and assets. -
"Test Laboratory monthly progress report" August.
Laboratory monthly progress report for the Saturn 1B program between dates August 1st through August 31st, 1967. -
"Test Laboratory monthly progress report" July.
Laboratory monthly progress report for the Saturn 1B program between dates July 1st through July 31st, 1967. -
"Test Laboratory monthly progress report" December.
Laboratory monthly progress report for the Saturn 1B program between dates December 1st through December 31st, 1967. -
"Test Laboratory monthly progress report" October.
Laboratory monthly progress report for the Saturn 1B program between dates October 1st through October 31st, 1967. Page 17 missing.