Browse Items (86 total)
Sort by:
-
"Fulfilling the Aerospace Engineer's Responsibility for Product Reliability."
The management techniques described in the paper support the Saturn S-IVB Program which is being conducted for the National Aeronautics and Space Administration, Marshall Space Flight Center. -
"Purchasing and contracting at the George C. Marshall Space Flight Center."
This is a speech given to fellow purchasing agent regarding purchasing and contracting. -
"Saturn IB orientation training manuel."
Prepared through joint efforts of Personnel Department, Education and Development Branch, Systems Training Unit, Michoud Operations and Engineering Communications Department, Technical Information Branch, Applied Communications Engineering Section, Huntsville Operations.; This publication presents a brief descriptive summary of the Saturn IB vehicle and Chrysler's Corporation's accomplishments in the missiles and space field. The Saturn IB information presented herein is based on current plans for each of the stages. Although there may be design changes from vehicle to vehicle, the basic components, systems, and operating principles will remain similar to previous models. -
"Management matrix integrating logistics support planning events."
This was found folded inside Configuration Management. Taken from Defense Industry Bulletin, June 1968. Includes an organizational chart and an accompanying bibliography. -
"Michoud operations : historical operations: July 1, 1963 - December 31, 1963."
Historical report from July 1st to December 31st. -
"Management Plan for Saturn Vehicle System."
The purpose of this management plan is to set forth the channels 1 and methods used by the National Aeronautics and Space Administration for the development of the SATURN Vehicle System, This plan is based i on past experience and proven management principles of the Development Operations Division, The attached figures illustrate the plan.