Browse Items (57 total)
Sort by:
-
"A summary of major NASA launchings" between October 1st and December 31st, 1968.
This is the first Quarterly Supplement to the October 1968 edition of GP 381, ''A Summary of Major NASA Launchings (Eastern Test Range and Western Test Range)." This Supplement covers the period from October 1 to December 31, 1968. Two additional Quarterly Supplements will be issued during 1969. Each of these will list those major NASA launchings occurring during the three-month period it covers. The basic publication will be revised and reissued, incorporating the information contained in the Supplements, as well as covering the final three-month period, subsequent to October 1, 1969. William A. Lockyer, Jr. -
"Aero-Astrodynamics Laboratory Bimonthly Progress Report: April - May 1968."
Includes Advanced Studies Office, Aerospace Environment Division, Astrodynamics and Guidance Theory Division, Projects Office, Aerophysics Division, Dynamics and Flight Mechanics Division, Flight Test Analysis Division. -
"Aero-Astrodynamics Laboratory Bimonthly Progress Report: June - July 1968."
Includes Technical and Scientific Staff; Advanced Studies Office; Projects Office; Aerospace Environment Division; Aerophysics Division; Astrodynamics and Guidance Theory Division; Dynamics and Flight Mechanics Division; Flight Test Analysis Division. -
"Aero-Astrodynamics Laboratory monthly progress report : April 7, 1966."
"Monthly progress report : April 7, 1966." -
"Aero-Astrodynamics Laboratory monthly progress report : January 12, 1966."
Monthly progress report for January 12, 1966. -
"Aero-Astrodynamics Laboratory monthly progress report : March 8, 1966."
"Monthly progress report : March 8, 1966." -
"First Annual Logistics Management Symposium: September 13 and 14, 1966."
The proceedings of the First Annual Logistics Management Symposium are forwarded with the hope that the information will be of assistance to attendees and their staffs in the planning and management of logistics support programs. I recognize that there is still much study required before all management techniques and procedures for support programs are known and understood, but I believe that support problems are made easier by exchange of knowledge. The Symposium was based on this belief and we plan to continue the search for ways to achieve better program support at a lower cost. Edmund F. O'Connor, Director, Industrial Operations. -
"Letter to Dr. Keith T. Glennan."
Letter to Kieth T. Glennan from Ernst Stuhlinger regarding a potential meeting between Glennan, Wernher von Braun Horner and Ernst himself. Attached is a required resume. -
"Listing of Historical Documents and Interview Tapes."
Archive copy is a poor photocopy.; Handwritten on the first page is "10/25/67".; Includes a letter dated Nov. 6, 1968 to Mr. Christensen from William D. Putnam. -
"Master list of projects."
Note attached to document to Mr. Christensen from William D. Putnam. List of projects ordered by criteria. -
"NASA management programs."
Address by Dr. George E. Mueller, Associate Administrator for Manned Space Flight, National Aeronautics and Space Administration; Joint AIAA/CASI Meeting, Montreal, Canada, July 8, 1968. AS DELIVERED.; Includes charts. -
"Proceedings : second NASA-wide reliability & quality assurance meeting : NASA Headquarters, November 29 - December 1, 1966."
The papers presented at the second NASA-Wide Reliability and Quality Assurance Meeting are published to disseminate current experiences and information. These papers, presented at NASA Headquarters on November 29 - December 1, 1966, are one means of exchanging current NASA reliability and quality assurance knowledge between projects and programs. This publication has been marked "FOR NASA USE" since it contains management opinions and contract experiences. Publication of papers suitable for wide dissemination in the Government, industry and University community is expected to be made separately. John E. Condon, Director, Reliability & Quality Assurance. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : August, 1967."
Progress report for August, 1967. -
"Propulsion and Vehicle Engineering Laboratory Monthly progress report : December, 1967."
Progress report for the month of December, 1967. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : Febuary, 1968."
Progress report for the month of Febuary, 1968. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : January, 1968."
Progress report for the month of January, 1968. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : July, 1967.
Progress report for July, 1967. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : June, 1967."
Progress report for the month of June, 1967. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : March, 1968.
Progress report for the month of March, 1968. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : October, 1967.
Progress report for October, 1967. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (April 1, 1966 through April 30, 1966)."
Progress report for the month of April, 1966. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (April 1, 1967, through April 30, 1967)."
Monthly progress report between the month of April. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (August 1, 1966 through August 31, 1966)."
A collection of progress reports covering a large number of projects within the month of August, 1966 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (July 1, 1966 through July 31,1966)."
A collection of progress reports covering a large number of projects within the month of July, 1966 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (March 1, 1966 through March 31,1966)."
A collection of progress reports covering a large number of projects within the month of March, 1966 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report (November 1, 1966 through November 30, 1966)."
A collection of progress reports covering a large number of projects within the month of November, 1966 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report, November."
Monthly progress report for the month of November, 1968 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report, September."
Monthly progress report for the month of September, 1968 -
"Propulsion and Vehicle Engineering Laboratory monthly progress report" April.
Monthly progress report for the Propulsion Division, April 1st through April 31st