Browse Items (65 total)
Sort by:
-
"Test Laboratory monthly progress report : March, 1967."
Monthly progress report for March, 1967. -
"Test Laboratory monthly progress report : May, 1967."
Progress report for May, 1967. -
"Saturn V : non-stage procured launch vehicle ground support equipment."
The functions, authority, management relationships, and responsibilities of the Launch Vehicle Ground Support Equipment Project Office are described. Functions and examples of non-stage procured Launch Vehicle Ground Support Equipment (LVGSE) are described and illustrated. -
"Michoud assembly facility and Mississippi test facility : volume II. 4th edition."
This document is the fourth edition of the management charts and photographs maintained in the Management Information Office of the Executive Staff on Michoud Assembly Facility and Mississippi Test Facility. Information on other MSFC activities and facilities will be published in separate volumes. -
"SAA program specification - case 218."
Memo sent to Major General D. M. Jones - NASA/ML. -
"Test Laboratory progress report" March and April.
Monthly rogress report for the test laboratory regarding the Saturn 1B program between March and April. -
DX priority: memorandum.
Memorandum discussing the priorization of various nlunar landing vehicle projects. -
"Survey of Saturn stage test and checkout computer program development."
This survey of the Saturn Stage Test and Checkout Computer Program Development contains a summary description of the systems developed for factory and static test of the stages of the SATURN IB and SATURN V Vehicles. The responsibilities of the MSFC and stage contractor organizations that are involved in test and checkout computer program development are briefly described. The test and checkout hardware and software (computer program) systems are given for each stage and for each site where tests are conducted. The systems and procedures that are used for program production verification, documentation, and change control required for the implementation of planned computer programs are included. Notes are included in the report to indicate what material is missing or incomplete. No attempt has been made to draw any conclusions regarding the automatic test and checkout systems being developed for each stage and the manner in which the efforts are organized, scheduled, and implemented. This document has been based on material provided by stage contractors and by components of MSFC through May 1, 1966. COMPUTER SYSTEMS SECTION. VEHICLE SYSTEMS INTEGRATION BRANCH. VEHICLE SYSTEMS CHECKOUT DIVISION.; SR-QUAL-66-3. -
General O'Connor's address to the Huntsville Rotary Club.
Address from General O'Conner to the Rotery Club bringing them up to date on organizational developments inside the George C. Marshall Center. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 3."
OMSF Program Status Review October 1965. -
"Organization, programs, and activities, of the technical sections Nortronics - Huntsville."
This brochure is intended to depict the present status of the technical activities of Nortronics-Huntsville as of the date indicated. It is based on all currently available information. It is subject to periodic revision as additional pertinent information becomes available. -
"Saturn S-II : annual progress report : 1 July 1962 through 30 June 1963."
This document, prepared in compliance with NASA contract NAS7-200, is the first annual progress report on the Saturn S-11 Program at the Space and Information Systems Division of North American Aviation, Inc. It provides a summary- and a technical analysis of results of contract work for the period 1 July 1962 through 30 June 1963.; SID 63-1028-1 251 pages. Include illustrations. -
"The program manager's problem"
Included in "First Annual Logistics Management Symposium," Huntsville, Alabama; Archive copy is a poor photocopy. Describes the stages of rocket-development/launch and the logistical problems with each. -
"Saturn V semi-annual progress report July-December, 1966."
MA-001-00202H.; MPR-SAT V 66-3.; ABSTRACT: This Saturn V Semi-Annual Progress report describes progress and major achievements from July 1, 1966, through December 31, 1966, in the Saturn V Program. -
"Facilities Engineering for the National Aeronautics and Space Administration."
Article makes references to a film. Centers around the idea that testing space vehicles extensively before launch is cost control. -
"Management problems faced in making future manned space exploration decisions."
This paper presents in synoptic form, an analysis of the management problems being faced in making fuhlre manned spaceflight decisions. It is an attempt to view the manned space program in total perspective - its relationship to other scientific research, other national programs, the role of Congress, the President's role, industry's role, and then show their relative influence and impact on decisior, making for the Post-Apollo period. -
Saturn V project development plan : November 1967.
This document revises and supersedes the Saturn V Project Development Plan, dated March, 1967. Approved: Arthur Rudolph, Manager, Saturn V Program; Samuel C. Phillips, Major General, USAF, Director, Apollo Program. -
"Manned space flight schedules. Vol. III, launch vehicles : book 2, Saturn IB."
OMSF program status review October 1965.; Edition "A". -
"Manned space flight schedules. Vol. III, launch vehicles : book 3, Saturn V."
OMSF Program Status Review October 1965.; Edition "A". -
"Saturn Apollo applications program specification."
This first issue contains only some general provisions for the program and its requirements for the Saturn 1B launch vehicle. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 4."
OMSF Program Status Review October 1965. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 6."
OMSF Program Status Review October 1965. -
"Manned space flight schedules. Vol. VII, construction of facilities, MSFC : book 2."
OMSF Program Status Review October 1965. -
"Saturn IB orientation training manuel."
Prepared through joint efforts of Personnel Department, Education and Development Branch, Systems Training Unit, Michoud Operations and Engineering Communications Department, Technical Information Branch, Applied Communications Engineering Section, Huntsville Operations.; This publication presents a brief descriptive summary of the Saturn IB vehicle and Chrysler's Corporation's accomplishments in the missiles and space field. The Saturn IB information presented herein is based on current plans for each of the stages. Although there may be design changes from vehicle to vehicle, the basic components, systems, and operating principles will remain similar to previous models. -
"Maintenance Data - How and What."
This presentation is concerned with how maintenance data can be collected, what can be done with it and possible a few arguments why it should be of any concern.