UAH Archives, Special Collections, and Digital Initiatives

Browse Items (65 total)

  • thepromanpro_020408133725.pdf

    Included in "First Annual Logistics Management Symposium," Huntsville, Alabama; Archive copy is a poor photocopy. Describes the stages of rocket-development/launch and the logistical problems with each.
  • teslabprorepmar121966toapr121966_091407131635.pdf

    Monthly rogress report for the test laboratory regarding the Saturn 1B program between March and April.
  • TestlabMON_JAN_062308120607.pdf

    Laboratory monthly progress report for the Saturn 1B program between dates January 1st through January 31st, 1968.
  • Testlabmonprogrep_041008104724.pdf

    Laboratory monthly progress report for the Saturn 1B program between dates September 1st through September 31st, 1967.
  • TestlabmonproJUNE_032808134023.pdf

    Laboratory monthly progress report for the Saturn 1B program between dates June 1st through June 31st, 1967.
  • Testlabmontprogrep_021108103845.pdf

    Laboratory monthly progress report for the Saturn 1B program between dates April 1st through April 31st, 1967. Last page of document is missing.
  • Testlabomontprog_011608112625.pdf

    Laboratory monthly progress report for the Saturn 1B program between dates Febuary 1st through Febuary 31st, 1967.
  • Suppmontprog0466_101707120811.pdf

    Monthly progress report for the Propulsion Division, April 1st through April 31st
  • Suppmontprogrepo51966_091907130743.pdf

    Monthly progress report for the Propulsion Division, May 1st through May 31st
  • survofsatustagtest.pdf

    This survey of the Saturn Stage Test and Checkout Computer Program Development contains a summary description of the systems developed for factory and static test of the stages of the SATURN IB and SATURN V Vehicles. The responsibilities of the MSFC and stage contractor organizations that are involved in test and checkout computer program development are briefly described. The test and checkout hardware and software (computer program) systems are given for each stage and for each site where tests are conducted. The systems and procedures that are used for program production verification, documentation, and change control required for the implementation of planned computer programs are included. Notes are included in the report to indicate what material is missing or incomplete. No attempt has been made to draw any conclusions regarding the automatic test and checkout systems being developed for each stage and the manner in which the efforts are organized, scheduled, and implemented. This document has been based on material provided by stage contractors and by components of MSFC through May 1, 1966. COMPUTER SYSTEMS SECTION. VEHICLE SYSTEMS INTEGRATION BRANCH. VEHICLE SYSTEMS CHECKOUT DIVISION.; SR-QUAL-66-3.
Output Formats