  • spc_dann_000164.mp4

    First clip shows some of the construction on the house, namely a worker digging a trench into the house as well as other workers modifying the electric lines to serve their new house. The rest of the film shows the Dannenberg Family (Konrad, Klaus, Ingeborg) looking over plans for what the house is eventually going to look like. Winter 1958.
  • spc_dann_000165.mp4

    The film shows the Dannenbergs' new house well under construction. The principle activities shown are the crafting of the roof joists and some of the bricklaying. Summer 1958.
  • spc_dann_000166.mp4

    Construction continues on the Dannenbergs' new house. Seen in this film is bricklaying of the outer wall, framing of the roof, and the pouring and smoothing over of the concrete carport slab. Summer 1958.
  • spc_dann_000167.mp4

    This film focuses on the roofing work on the Dannenbergs' new house. Shown are workers trimming the eaves of the roof as well as nailing down the weatherproof cover to the top of the roof. Summer/Autumn 1958.
  • spc_dann_000168.mp4

    Roofing work continues on the Dannenbergs' new house. In this film, the roof is being built over the family room. Klaus Dannenberg is shown climbing up onto the roof to check it out. Summer/Autumn 1958.
  • spc_dann_000169.mp4

    This film shows the starting work on the Dannenbergs' new house. They first chop down and burn all of the foliage that's growing where the house will be. Then a construction crew comes in and grades the site. The final shot shows Konrad and Klaus Dannenberg marking the corners of the new house. Konrad Dannenberg's notes on the film box read, "1) Cleaning of House Area, Tommy + Klaus 2) Grading w/ Digger (IMK) 3) Woodburning + chopping 4) [illegible] and hose w/ transit 5)Ko and Klaus setting up corners. Very good film!" Summer 1958.
  • spc_dann_000170.mp4

    The work depicted in this film is the laying of the foundation and basement as well as the delivery and erection of the lumber for use in the floor and first story walls of the Dannenbergs' new home.Konrad Dannenberg's notes on the film box read, "1) The lumber arrives w/the Vick's Lumber Co, Hamilton 2) OD Porter moves bricks 3) Laying the subfloor frame (Newton + T. Walker) 4) Newton smirks w/satisfaction 5) Kids on house [illegible] 6) View of house struts walls. Summer 1958.
  • spc_dann_000171.mp4

    Continuation of the construction on the Dannenbergs' new home. Primarily shown is some of the roof framing, masonry work, and propping up the beams over the family room. Film also depicts an older couple being shown around the house while still under construction. Summer/Autumn 1958.
  • spc_dann_000161.mp4

    Film opens showing a lot for sale on Crescent Drive, location unknown. Later, Konrad, Klaus, and Ingeborg Dannenberg arrive to inspect the lot. After parking, they walk over to an area that has been staked out and roped off, presumably the site of some future construction. Konrad Dannenberg's notes on the side of the film box read, "1) General View of the Lot 2) IMK arrives in Rambler 3) Klaus and Peabody on Lot 4) Gen'l. shots of House Location. Film fair, needs explan." 1958.
  • spc_dann_000162.mp4

    The first half of this film shows the outside of the Dannenbergs' new house being painted. Also shown are Konrad, Ingeborg and Klaus inspecting the new dwelling. The latter half of the film shows the construction crew digging a path for a pipe to be run into the building, presumably for septic waste. Fall 1958.