Browse Items (23 total)
Sort by:
-
Skylab "MANNED FLIGHT AWARENESS" Poster Skylab 1 & 2.
This poster is an artistic depiction of the Skylab 2 mission Crew. -
Skylab Articles: "The 18,000-M.P.H." and "Spinnaker."
These two articles describe the initial issues that struck Skylab 1 upon launch, the undeployed solar panels, and the missing meteoroid shield. The articles also describe how the crew aboard Skylab 2 resolved those issues upon arriving at the space habitat. -
NASA "m!ssion report 'Man Still Matters' - The Story of The First Skylab Mission."
This article describes the scientific importance of the Skylab missions, and specifically focuses on the importance of having the Skylab program be a manned series of missions, as opposed to unmanned. -
"SKYLAB WORKING ON A NEW FRONTIER."
This article describes the technical aspects of all of the Skylab missions, with a focus on readability for the public. -
Skylab "MSFC SKYLAB NEUTRAL BUOYANCY SIMULATOR" Technical MEMORANDUM.
This report describes the importance of the Neutral Buoyancy Simulator for preparing the Skylab astronauts to work in space. -
"Final Crew System Corollary Experiment Input to the Skylab Final Mission Evaluation Report."
This report describes the experiments onboard Skylab, what the data the experiments gather indicates, and the equipment that the experiments utilize. This includes the spider experiment. -
"SL II MC 1/1 Time: 6:32 a.m. CDT, T-01:25:00 GET 5/25/73" - "SL-II MC-11/3 Time: 08:01 A.M. CDT, T-1 minute Get 5/25/73."
This mission commentary depicts the Skylab 1 launch. -
"SL-II MC-60/1 Time: 22:50 CDT 14:50 GET 5/25/73" - "SL-II MC 64/1 Time: 01:25 CDT 17:25 GET 5/25/73."
This mission commentary depicts Skylab 2 docking with Skylab 1. This mission commentary also depicts the Skylab 2 crew beginning work on resolving the solar panel and micrometeoroid shield problems. -
"SL-II MC-64/2 Time: 01:25 CDT 17:25 GET 5/25/73" - "SL-II MC 75/2 Time: 10:17 a.m. CDT 1:02:17 GET 5/26/73."
This mission commentary depicts the improving temperature conditions on Skylab 1 following the Skylab 2 crew's efforts to resolve the temperature problems. -
"SL-II MC75/3 Time: 10:17 a.m. CDT, 1:02:17 GET 5/26/73" - "SL-II MC-79/3 Time: 11:24 a.m. CDT 1:03:24 GET 5/26/73."
This mission commentary depicts the Skylab 2 crew working to secure the fastening between the Skylab 2 command module and the Skylab 1 habitat. This mission commentary also depicts the Skylab II crew working on the life support systems. -
"SL-II MC-81/1 Time: 11:44 a.m. CDT, 1:03:44 GET 5/26/73" - "SL-II MC-88/1 Time: 1:34 p.m. CDT 1:05:34 GET 5/26/73."
This mission commentary depicts the Skylab 2 crew trying to resolve a low temperature problem in the scientific airlock. The commentary also depicts the Astronaut assessment of the Orbital Workshop high temperature problems. -
"SL-II MC-88/2 Time: 1:34 p.m. CDT, 1:05:34 GET 5/26/73" - "SL-II MC-96/1 Time: 15:13 p.m. CDT 1:07:13 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew carrying out maintenance on the life support systems. This mission commentary also depicts the Skylab 2 crew operating the Apollo Telescope Mount. -
"SL-II MC-97/1 Time: 3:23 p.m. CDT, 1:07:23 GET 5/26/73" - "SL-II MC-101/2 Time: 4:56 p.m. CDT 1:08:56 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew discussing the deployment of the parasol for the alleviation of temperature pressures. The Skylab 2 crew is also depicted making the preparations for the deployment of the solar parasol. -
"Time: 17:15 p.m. CDT, 1:09:15 GET SL-II MC102/1 5/26/73" - "SL-II MC-108/1 Time: 19:53 p.m. CDT 1:11:53 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew unpacking and assembling the solar parasol. The Skylab 2 crew is also depicted deploying the solar parasol. -
"SL-II MC-109/1 Time: 20:02 CDT 1:12:02 GET 5/26/73"-"SL-II MC-114/3 Time: 21:36 CDT 01:13:36 GET 5/26/73."
This mission commentary primarily depicts the Skylab 2 crew finishing their work on the solar parasol. This mission commentary also depicts the discussion between the Skylab 2 crew and ground control about the permanent move to habitation in the Orbital Workshop. -
"SL-II MC-114/4 Time: 21:36 CDT 01:13:36 GET 5/26/73" - "SL-II MC-117/4 Time: 23:47 CDT, 1:15:47 GET 5/27/73."
This mission commentary primarily depicts the Skylab 2 crew transitioning to permanent habitation in the Skylab 1 Orbital Workshop from the Skylab 2 Command module. -
"SL-II MC-616/1 Time: 20:41 CDT, 14:01:41 GMT 6/6/73" - "SL-II MC-630/1 Time: 07:57 CDT, 14:12:57 GMT 6/7/73."
This mission commentary primarily depicts the Skylab 2 crew working on, and maintaining the Apollo Telescope Mount systems.