Browse Items (204 total)
Sort by:
-
"Michoud Assembly facility telephone directory : Boeing Launch Systems Branch, Chrysler Space Division, LTV Range System Div., Mason-Rust Engineering Company."
Telephone directory displaying available channels and how to access them. -
"Apollo Program Management Volume 3."
According to the introduction found on page ii, this document was created to detail the "MSFC segment of the total Apollo Management process and to describe the methodologies and techniques currently being implemented." -
"AS-203 Technical Information Summary."
"This report outlines, through a series of sketches with accompanying text, the general features of the SA-203 Launch Vehicle and information on launch preparation, the launch facility and mission peculiar experiments." -
"Aero-Astrodynamics Laboratory monthly progress report : January 12, 1966."
Monthly progress report for January 12, 1966. -
"Aero-Astrodynamics Laboratory monthly progress report : April 7, 1966."
"Monthly progress report : April 7, 1966." -
"Aero-Astrodynamics Laboratory monthly progress report : March 8, 1966."
"Monthly progress report : March 8, 1966." -
"Mission and facilities of Instrument Development Branch."
Describes the purpose and goes of the George C. Marshall Space Flight Center. Instrumental development branch. -
"Management system"
The title has been cut off of document. This was placed inside the document Configuration Management. An organizational chart of plans and critical events related to those plans. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : June, 1967."
Progress report for the month of June, 1967. -
"Propulsion and Vehicle Engineering Laboratory Monthly progress report : December, 1967."
Progress report for the month of December, 1967. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : Febuary, 1968."
Progress report for the month of Febuary, 1968. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : January, 1968."
Progress report for the month of January, 1968. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : March, 1968.
Progress report for the month of March, 1968. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : August, 1967."
Progress report for August, 1967. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : July, 1967.
Progress report for July, 1967. -
"Propulsion and Vehicle Engineering Laboratory monthly progress report : October, 1967.
Progress report for October, 1967. -
Test laboratory Monthly Progress Report: November 1, 1967 through November 30, 1967.
The report includes the Systems Test Division; Components and Subsystems Division; Technical Support Division; and the Advanced Facilities Planning Office. -
"Test Laboratory monthly progress report : May, 1967."
Progress report for May, 1967. -
"Michoud assembly facility and Mississippi test facility : volume II. 4th edition."
This document is the fourth edition of the management charts and photographs maintained in the Management Information Office of the Executive Staff on Michoud Assembly Facility and Mississippi Test Facility. Information on other MSFC activities and facilities will be published in separate volumes. -
"Minimax control of large launch boosters."
Keith D. Graham is principal mathematician, Systems and Research Center, Honeywell, Inc., 2345 Walnut Street, St. Paul, Minnesota.; Work done under NASA contract NAS 8-11206 from the George C. Marshall Space Flight Center.; ABSTRACT: A method of specifying the gains of a linear controller for a large launch booster using a new application of optimal control theory is described in this paper. Results for a specific example are included. An important control requirement is to maintain cost variables (such as bending moment, engine gimbal deflection, and lateral deviation from desired trajectory) within specified limits in the presence of load disturbances. This requirement is met by using a performance index which depends explicitly on maximum achievable values of the cost variables in a finite time interval. -
Briefing for Apollo 10.
This document contains a transcript of the briefing meeting for the launch of Apollo 10. Participants include George H. Hage, Colonel Thomas McMullen, and William J. O'Donnell. -
"Altitude Simulation in Saturn SIV Space Testing."
This paper was presented to the Society of Automotive Engineers. The abstract reads, "The Douglas Aircraft Company has been involved in testing the Saturn SIV stage at the Sacramento Test Center for the past two years. The propulsion system for the SIV stage consists of six (6) Pratt & Whitney Aircraft Company rocket engines which are designed specifically for high altitude start and operation. During static firing tests of this engine at sea level, a steam jet ejector in combination with a diffuser, are used to simulate altitude conditions. The intent of this paper is to examine the performance of this altitude simulation system, and to discuss problems encountered in making it operational." -
Combustion oscillations in the F-1 engine, monthly report.
The set of documents includes an introductory letter written by D. Brainerd Holmes and Tischler's report with the subject "F-1 Combustion Instability Report for Associate Administrator; Period June-July 1963." -
Apollo 10/AS-505 mission chart.
The chart includes diagrams, mission statistics, crew, and notes. There is an additional copy in the David Christensen Collection. -
"America's Spaceport."
Guide to John F. Kennedy Space Center, including an introduction from Center director Kurt Debus. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 1.
The document is Volume 1, Section 1 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 2.
The document is Volume 1, Section 2 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 3.
The document is Volume 1, Section 3 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 4.
The document is Volume 1, Section 4 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 5.
The document is Volume 1, Section 5 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 6.
The document is Volume 1, Section 6 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 7.
The document is Volume 1, Section 7 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 8.
The document is Volume 1, Section 8 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 9.
The document is Volume 1, Section 9 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 10.
The document is Volume 1, Section 10 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 11.
The document is Volume 1, Section 11 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 12.
The document is Volume 1, Section 12 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 13.
The document is Volume 1, Section 13 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502. -
Catalog of launch vehicle tests Saturn V : Apollo/Saturn 502 : Volume 1, Section 14.
The document is Volume 1, Section 14 of a list of Saturn V launch tests including but not limited to test titles, test numbers, test objectives, and test descriptions related to AS-502.