A handwritten note on the title page notes that the document was received from Earl F. Rodriguez, General Electric Co., MTSD in Bay St. Louis. Includes a chronology of General Electric activity in south Mississippi.
This document includes a brief history of MSFC facilities, defunct names used by various Redstone located missile organizations, Michoud facilities history, the Slidell Operations Office history, the Mississippi Test Facility (MTF) history, and detailed description of technical facilities for the MSFC R&D Laboratories. The final section presents a detailed breakdown of property and facility values for various MSFC facilities over a period of time.