![UAH Archives, Special Collections, and Digital Initiatives](http://libarchstor2.uah.edu/digitalcollections/files/theme_uploads/881ce3c218c039cbfb10db85af3759d6.png)
Browse Items (6320 total)
Sort by:
-
"JULY 11, 1979 1 HOUR REPORT."
This is a report about the Skylab 1 reentry. -
"July 16th confirmed as definite for Apollo 11."
News article covering NASA's announcement of Apollo 11's launch-date: July 16th. -
"July 16th still set as Apollo 11's 'L-Day.'"
News article confirming NASA's announcement of Apollo 11's launch-day. Focuses on the optimism surrounding the launch as well. -
"Junior Hot Rod Ride."
This flier has a colored image of the "Junior Hot Rod Ride" as well as a description and price for it. -
"Juno V Space Vehicle Development Program (Phase I): Booster Feasibility Demonstration."
The initial phase of the JUNO V space vehicle development program, as presented herein, provides for a static demonstration and a total of four flight feasibility tests. The latter two flights will give the U.S. its first payload capability in excess of 10,000 lb in mid 1961. The objective of the overall program is to provide a reliable, economical, and flexible carrier vehicle with relatively large payload capability for orbital and space missions at the earliest possible date. -
"Juno V Space Vehicle Development Program."
This report io the second in a scrics of reports on the JUNO V Space I Vehicle Development Program and indicates the present status of the overall I program. The objective of the overall program is to provide a reliable, economical, and flexible carrier vehicle with relatively large payload capability for orbital and space missions at the earliest possible date. -
"Juno V Transportation Feasibility Study (U)."
The purpose of this report is to present an investigation to determine the feasible, practical and economical method of transporting the JUNO V thrust unit. This includes the first phase of transporting between Fabrication Laboratory, Systems Analysis and Reliability Laboratory and to the test stand, as well as the later phases, onto the Redstone Arsenal loading docks and from there down the Tennessee, Ohio and Mississippi Rivers to the Atlantic Missile Range, Florida.; Transportation and Packaging Section, Systems Support Equipment Laboratory. -
"Kerry’s First Christmas 1967."
Clip shows the Dannenbergs (Konrad, Klaus, Betty, Ingeborg, and Kerry) celebrating Christmas. The family is shown lounging around a living room talking as Klaus plays with Kerry. Winter 1967. -
"Kerry’s First Christmas 1967."
Klaus, Kerry, Betty, and Ingeborg Dannenberg are shown opening presents around a Christmas tree. Winter 1967. -
"Kerry’s First Christmas 1967."
Footage of Klaus, Kerry, Ingeborg, and Betty Dannenberg relaxing around the Christmas tree. The video focuses mostly on Kerry and the Dannenbergs' new dog, a black terrier named McDuff. Winter 1967. -
"Key MSFC Personnel for Potential Interview Efforts."
Essay detailing potential candidates for potential interviews. -
"Kiddie Flyer Hand Car Ride."
The advertisement gives a description of the ride, its shipping weight, and its price. -
"Klaus and Jud Lynn Easter egg hunting. Dogwoods in Huntsville."
Klaus and Jud Lynn hunt for Easter eggs and attend church service at St. Mark's Evangelical Lutheran Church. Spritime scenes around Huntsville. -
"Klaus home in Hv. to Navy / to College / Begin of Xmas."
Konrad, Klaus, and Ingeborg Dannenberg and the in-laws celebrate Christmas by opening presents in the family room at the Dannenbergs' house in Monte Sano, Huntsville, Alabama. Konrad Dannenberg's note on the film box reads, "ends w/ IMK Tired in chair." Winter 1963. -
"Klaus in front yard, arrival of Lilo and family. Stevie Ross trip to Monte Sano"
Klaus plays with other children and trims a rose bush with Ingeborg. Arrival of "Lilo and family", play with a small child in the front yard. Klaus takes a trip the playground and Monte Sano to hike and shoot his BB gun. -
"Klaus returns from Navy cruise 1963 Atlanta."
Klaus Dannenberg returns from sea and meets Konrad and Ingeborg in Atlanta, Georgia. While there, they stay at a Howard Johnson Inn and tour around Atlanta. 1963. -
"Klaus w/ the Navy, departure fr Hv 13 July '63."
Klaus Dannenberg departs to join the U.S. Navy. Shown are Ingeborg and Konrad seeing him off before he boards a flight. Summer 1963. -
"Klaus' Confirmation, Church Da.-Feier at w/Huetz's + Katzenshots."
First half of film shows Klaus Dannenberg being confirmed as well as the confirmation celebration at the Dannenbergs' house. Second half shows the new litter of kittens from the Dannenbergs' cat. Winter, 1957/58. -
"Klaus' Graduation at Auburn."
Shows the first part of Klaus Dannenberg's graduation from Auburn University. Film shows the in-laws going into the stadium and sitting down, as well as the graduates proceeding into the stadium. 1967. -
"Klaus' Graduation at Auburn."
Film from Klaus Dannenberg's graduation from Auburn University. Shown are a few clips from the president of the college, Klaus walking up to receive his degree, and Klaus meeting with family and friends afterwards. 1967. -
"Kompak Coinpassor Model 97."
This advertisement provides images, features, and specifications for the turnstile. -
"KSC Apollo/Saturn V Master Test Plan."
The John F. Kennedy Space Center (KSC) Apollo/Saturn V Development/Operations Plan, K-PM-0, establislies the requirement for an Apollo/Saturn V Master Test Plan (MBP). This document, prepared by the Saturn Systems Office. -
"L-UT/Armb tower in pad position."
illustration of the L-UT/Armb umbilical tower -
"L-UT/Armb tower in pad position."
illustration of the L-UT/Armb umbilical tower -
"Launch Complex 34 Facilities Fact Sheet 05."
Article detailing the different aspects of the Launch Complex 34 facilities. -
"Launch Complex 37 Facilities Fact Sheet."
Article detailing the different aspects of the Launch Complex 34 facilities. -
"Launch Complex 39 Facilities Fact Sheet 03."
Article detailing the different aspects of the Launch Complex 34 facilities. -
"Launch Control and Checkout Equipment (LCCE) [photograph]."
Description of an 8 x 10 inch black and white photograph. -
"Launch Information: Saturn S-IV and the RL10 Engine."
The RL10, which powers the National Aeronautics and Space Administration' s Saturn S-IV, is the newest propulsion system to be put to work in advancing our nation's space effortr On November 27, 1963, a pair of RLlO's successfully powered a five-ton Centaur space vehicle in earth orbit in the first flight demonstration of the outer space powerplant which uses high-nenergy liquid hydrogen as fuel. A six-engine cluster of RLlO' s, generating a total of 90, 000 pounds of thrust, powers the Saturn S-IV stage. The 15, 000 pound-thrust engine was designed and developed for NASA's Mar shall Space Flight Center at Pratt & Whitney Aircraft's Florida Research and Development Center, 20 miles northwest of West Palm Beach. -
"Launch Vehicle Engines Project Development Plan."
This revised edition of the Launch Vehicle Engines Project Development Plan supersedes the issue dated July 1, 1965. Significant changes which have been made are:- Removal of classified data to permit publication as an unclassified document; - Removal of material applicable to the RL-10 Engine Project which was transferred to the Lewis Research Center effective May 1, 1966; - Elimination of detailed schedules which quickly become obsolete; - Punched for maintenance in loose-leaf 3-ring binders and for ease in updating material through issuance of replacement sheets. Binders are not furnished. The information in this document is current to January 1, 1967.; The Launch Vehicle Engines Project Development Plan is established in accordance with requirements of NASA General Management Instruction 4-1-1, Planning and Implementation of NASA Projects, and OMSF Instruction MP 9320.044, Preparation and Revision of Program/Project Development Plans (PDP's). The Plan, herein referred to as the PDP, has been developed within the scope of current Apollo Projects Approval Documents (PADS) and will be maintained by the Engine Program Manager to identify program requirements, responsibilities, tasks, and resources, and time phasing of major actions required to accomplish the Engine Program. -
"Launch Vehicle Engines Project Development Plan."
The primary mission objective of the 5-2 Engine Project is to continue development of a liquid oxygen/liquid hydrogen engine. capable of high-altitude restart. Both Saturn IB and Saturn V vehicles will use the J-2 engine; the S-IVB stage of Saturn IB vehicles and S-IVB stage of Saturn V vehicles will be equipped with a single J-2 engine. The S-I1 stage of Saturn V vehicles will use a cluster of five J-2 engines. Figure 1-3 illustrates these stages. -
"Launch Vehicle Recovery System Requirements."
The primary considerations in the design and development of a recovery system applicable to present expendable first stage launch vehicles are discussed. The general requirements that define the essential characteristics of a feasible recovery system are derived from three critical phases during flight. The degree of criticalness is primarily influenced by the conditions at stage cutoff and separation. The three critical phses of flight are broken down into the following: (1) conditions and requirements between stage separation to re-entry; (2) re-entry; and (3) terminal descent and landing. -
"Lethal Weapons Too; Classifed Information, Even on a Fragile Disk, Is Deadly in Wrong Hands.; Safeguard it!"
Lethal weapons and classified documents -
"Lethal Weapons Too; Classified Information Even In This Fragile Form, Is Deadly In the Wrong Hands. Safegaurd It."
Lethal weapons and classified documents -
"Letter from Mr. David L. Christensen."
Letter stating that "A review of the research origins of the Lance weapon system - Project Hindsight -Task 1 supplement" is inside as requested. -
"Letter Orders No 8-20".
The orders grant Edwin D. Burwell Jr. seven days of leave to Great Britain. -
"Letter to Dr. George E. Mueller."
This letter regarding designations for Apollo missions notes that "Unfortunately, the scheme for designating missions as stated in your message does not yet solve the problem of reserving the Apollo 1 name for Spacecraft 012 and its crew. As we have discussed with you and General Phillips in the past, the wives of the three deceased astronauts have made a special plea to reserve this Apollo 1 designation for Spacecraft 012 and the Grissom, White and Chaffee crew."; Archive copy is a photocopy.; In replay refer to: AB.