Browse Items (7888 total)
Sort by:
-
"Safety is as Stupid Does!!"
Military people practicing unsafe practices in their home -
"San Francisco, Alcatraz, Fisherman's Wharf. - Marine Museum - Sacramento, Capitol."
Konrad, Klaus, and Ingeborg Dannenberg tour San Francisco and Sacramento, seeing Alcatraz Island, the Golden Gate Bridge, the Tower Bridge, and the California state capitol building. Summer 1956. -
"Sat V growth and flexibility."
This paper summarizes work conducted under a recent NASA study contract and Boeing studies on improved Saturn V vehicles and intermediate payload Saturn vehicles. The contractual study was a part of a continuing effort by NASA to identify a spectrum of practical launch vehicles to meet potential future payload and mission requirements as they become defined.; UAHuntsville's Saturn V finding aid has the title as: Saturn V Growth and Flexibility, by J.E. Martin.; Preferred Citation: [Identification of item] Saturn V Collection, Dept. of Archives/Special Collections, M. Louis Salmon Library, University of Alabama in Huntsville, Huntsville, AL. -
"Satellite recovery system."
Report focusing on the problems of the satalite recovery system and the possible solutions for those problems. -
"Saturn -- the lunar vehicle."
Aerospace Workshop, University of Hawaii.; Includes references to slides. -
"Saturn : DMS market intelligence report."
Lists numerous costs. -
"Saturn 1750 LB. Thrust ullage rocket engine."
Report detailing the progress and status of the RDT-12 engines under construction. -
"Saturn and its mission."
Presentation from Harper, discussing the Saturn Project's then-status, background and plans. -
"Saturn and Noise."
The pamphlet uses a cartoon character named "D. B. Noyes" to explain to the public "the nature and effects of the noise which Saturn makes during static firing tests." -
"Saturn and the exploration of space."
Presentation Raymond Pisani to the East-West Bank Chamber of Commerce regarding the Saturn project's roll in space exploration and what contrabutions the East-West Bank can make in that area. -
"Saturn and the future."
Presentation with its main focus on the competitive and humanitarian goals of the Saturn project. -
"Saturn and the Gulf Coast."
Presentation about the Saturn program and its purpose in the gulf coast. -
"Saturn and the NASA space program."
Given at the Birmingham Chapter National Defense Transportation Association. Focuses chiefly on moon-missions. -
"Saturn Apollo applications program specification."
This first issue contains only some general provisions for the program and its requirements for the Saturn 1B launch vehicle. -
"Saturn Apollo guidance error estimation."
A brief sketch of the development of the equations for a weighted least squares estimator is given, the equations for both collective and recursive estimators being included. Four possible problem sources that may be encountered in the application of the estimator are identified. Various "success" parameters are defined in an attempt to predict the success with which, the method has been applied. The application of the estimation technique to the problem of computing various error parameters associated with the ST-124M guidance platform is described with the numerical results obtained using a manufactured data case are presented. These results are used to form conclusions about the effectiveness of the "success" parameters and preferred approaches to the problem of system evaluation using techniques of estimation theory. -
"Saturn ascending phase guidance and control techniques."
Lunar Missions Meeting, July 17-19, 1962. Focuses on the guidence concept under development at the Marshall Space Flight Center -
"Saturn base heating review."
The Saturn I booster which is powered by a cluster of eight rocket engines has been successfully flown on four successive flights. The early success of this large launch vehicle is a strong indication of the soundness of its base heating program. This paper summarizes the thinking that went into the design of our base configuration. Flight test results indicate that pressures, temperatures and heating rates were generally as expected. New techniques have been investigated for generating design data. It has been found experimentally that pressure and thermal fields establish themselves in one to three milliseconds and that data from the "short duration" technique compare favorably with "long duration" type tests. As a result, the new "short duration" technique has become the standard for generating design data for the Saturn vehicle. -
"Saturn C-1 vehicle project development plan."
The Saturn C-1 space vehicle system is being developed by government agencies at industrial firms under the direction of the National Aeronotics and Space Division -
"Saturn C-5, S-IC, stage fuel tank assembly."
8 x 10 inch black and white diagram of a Saturn fuel-tank assembly cross-section. -
"Saturn data summary handbook."
This handbook provides a technical data summary for the Douglas-produced Saturn S-IV and S-IVB stages of the NASA Apollo Program. Material contained in the S-IVB stage of this handbook includes the S-IB and S-V vehicles. This book will be updated as changes and additional information become available. The appendix contains aerospace fluid characteristics, LOX and LH2 vapor pressure curves and a list of non-standard abbreviations. -
"Saturn display set: instruction manual."
The manual comprises a multi-volume set, the contents of which are as follows: VOLUME 1 -- a. Chapter 1 contains a general description of the equipment and its purpose, the physical and functional characteristics, and other pertinent data. b. Chapter 2 describes and illustrates the display set installation considerations. c. Chapter 3 lists and illustrates all operating controls and indicators. Chapter 3 also contains normal and emergency operating instructions. -
"Saturn history documentation: subject index."
This document explains the handwritten numbers on each document.; On spine is the title "Saturn history subject categories." -
"Saturn I : the first generation of heavy launch vehicles designed for peaceful exploration of space."
A basic description of the Saturn rockets alongside diagrams for context. -
"Saturn I engine gimbal and thrust vector control systems."
The hydraulic systems for the two-stage block II Saturn I vehicle are described with the evolution of their development. -
"Saturn I flight test evaluation."
Speech to be delivered to Joint AIAA/ASME Student Chapters Meeting, University of Tennessee, Knoxville, Tennessee. Speech focusing on their future endeavors and missions into space. -
"Saturn I flight test evaluation."
As this paper is being written, the Saturn I flight test program includes five flights launched between October, 1961 and January, 1964. All five fiights were complete successes, both in achieving all major test missions and in obtaining an unprecedented volume of system performance data for flight analysis. -
"Saturn I summary."
Summary of the history of the Saturn 1, its missions and its construction. -
"Saturn I workshop experiments."
April 1, 1968.; Stamped on first page is From the Archives of Frederick I. Ordway, III. -
"Saturn I workshop, 1968."
The Workshop project calls 'for changing a spent Saturn S-IVB propulsion stage into a living area after it has propelled itself into space. -
"Saturn I workshop, 1969."
The Workshop project calls for changing a spent Saturn S-IVB propulsion stage into. living and working quarters after it has propelled itself into space. -
"Saturn I: The First Generation of Heavy Launch Vehicles Designed for Peaceful Exploration of Space."
The leaflet outlines the history of Saturn launches and gives a physical description of the rocket. The description includes a diagram of each stage; specifications of each stage's thrust, propellants, liftoff weight, and burning time; and engine specifications. -
"Saturn I/IB Launch Vehicle Operational Status and Experience."
6Aeronautic and Space Engineering and Manufacturing Meeting, Los Angeles, California. -
"Saturn I/IB quarterly film report no. 24, April, May and June, 1965."
A list of film reports covering the months of April, May and June of the year 1965. -
"Saturn I/IB quarterly film report no. 24."
Gives dates and time of interlock for final I.O. approval. -
"Saturn I/IB quarterly film report no. 25."
Memo gives dates and times of the interlock for final I.O. approval. -
"Saturn I/IB quarterly film report no. 26."
Memo is from Chief, Program Management Information, I-RM-D.; The date and time of the interlock for the final I.O. approval is given. -
"Saturn IB - Saturn V instrument unit technical facts."
Press release detailing the technical aspects of the Saturn IB. -
"Saturn IB : presentation to Little Rock Group."
Speech by H.D. Lowrey, SAE Meeting, Detroit, Michigan. Focuses on the Apollo project, the technology involved and what the goals of the project are. -
"Saturn IB ESE interlock system."
The results of an OMSF AS-201 Interlock and RCA 110A Computer Review were published. Recognizing that this was a "quick look", it was determined that a more detailed approach should be taken with respect to interlocks for the duration of the Saturn IB-V program.